• Title/Summary/Keyword: Building Construction Management

Search Result 2,661, Processing Time 0.03 seconds

Development and Application of Guideline for Construction Management of School Building Seismic Retrofit (학교 건축물 내진보강 시공현장 관리를 위한 가이드라인 개발 및 적용에 관한 연구)

  • Hwang, Eun-A;Lee, Byoung-Ho;Park, Ku-Byoung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.36-37
    • /
    • 2020
  • The government seismic retrofit project for educational facilities is progressing more actively due to the 2018 Pohang earthquake. It is most important that seismic retrofit constructions are conformed to seismic design to achieve the desired purpose of the project as reduce direct damage caused by earthquake. However, the construction supervision system is not mandatory for the retrofit construction site of small buildings including school buildings according to applicable laws and regulations. The purpose of this study was to develop a guide for constructions management of school building seismic retrofit. In order to achieve this goal, the survey on the construction site was conducted and various problems related to the construction site of school building seismic retrofit was derived Additionally, the systematic checklist was presented according to the user and seismic reinforcement method.

  • PDF

INCIDENT FREQUENCY AND SEVERITY FOR CONSTRUCTION FACILITIES

  • Jong-Hyun Park;Jae-Su Jeong;Chan-Sik Lee
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.234-240
    • /
    • 2011
  • Preventing incidents occurred in construction process is important for safe implementation of construction projects. Due to the complexity and magnitude of the project and moreover, poor safe planning and management, construction incidents in Korea have been increasing. Reducing construction incidents effectively, appropriate safety management program in consideration of the incident rate of each facility is to be adapted. This study analyzes incident frequency and severity rate of each facility based on the data of construction sites(about 1,560 thousand cases) recorded by Korea Occupational Safety & Health Agency for 3 years from 2007 to 2009, and the incident related data (about 40 thousand cases) of Korea Workers' Compensation & Welfare Service. The results of this study revealed that construction incident rates of 'cold refrigeration storage facilities' are the highest among building types, followed by traditional building religious building, arcade department store and shopping center. In case of other facilities, the incident rate and the rate of intensity of 'pipelining project' are the highest, followed by 'tunneling project'. These results would be used in providing safety programs beneficial for preventing construction incidents.

  • PDF

Actual Condition and Extended Suggestions of Legal Management of Construction Enterprise in Korea (건설기업 법정관리의 실태와 향후 과제)

  • Kim, Jin-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.208-209
    • /
    • 2013
  • In recent times, the legal management of construction enterprise has become one of important theme in the domestic construction industry. Therefore, the objective of this paper is to consider rational methodology of legal management of construction enterprise. To achieve this objective, this paper performs a case study about the major cause and significant characteristic of the legal management. In conclusion, the following factors are systematized : 1) actual condition of legal management of construction enterprise in korea, 2) the influence and extended suggestions of legal management.

  • PDF

Improvement method of process management on new han-ok style public building project (신한옥형 공공건축물 실증구축사업의 작업진도 분석 및 공정개선 방안 - 신한옥형 공공건축물 실증구축 현장 3개를 중심으로 -)

  • Seo, Jung-Seung;Kim, Young-Hoon;Kwak, Dong-Yeob
    • KIEAE Journal
    • /
    • v.17 no.3
    • /
    • pp.133-140
    • /
    • 2017
  • Purpose: The construction of New Han-ok style public buildings is a construction that can not be seen in traditional Han-ok, and it is a construction that combines traditional wooden structure, RC structure, and steel structure. Therefore, construction different from general construction is complicated and complex. It is necessary to accurately understand the construction method of each field rather than the general construction management method and study the method suitable for New Han-ok style public buildings. Also, since the New Han-ok style public building business is the first business to be introduced in Korea, new process management is needed rather than general process management. Method: The research method is as follows. Analyze process management through theoretical considerations and analyze the differences from general construction projects. Next, we want to identify the characteristics and problems of the process control method applied to real cases. Finally, the results of this analysis suggest ways to improve process management. Result: Therefore, it is necessary to establish a precise plan from the basic design to the construction of the public building construction management. In addition, careful planning should be made so that the supply and demand of materials and the supply and demand of personnel can be achieved smoothly.

Existing Building Approval Submission Process Improvement Effect Analysis thru Utilization of BIM

  • Yeo, Chang-Jae;Yu, Jung-ho
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.664-664
    • /
    • 2015
  • Advanced countries have mandated applying BIM in construction projects. Also, Public Procurement Service has planned to mandate applying BIM to all construction project that ordered in PPS from 2016 in KOREA. However, now Seumter that is building administration system is not supported BIM based construction license BIM information from Seumter. Thus, despite the applicant is preparing a BIM model, they do not take advantage of BIM information in Seumter. In previous studies. We developed a BIM based building approval submission system. In this study, we verified the system that developed in previous research. As a result, requirement information input time reduction in Seumter system showed high satisfaction. But there was as low usability because building approval submission system cannot support some information for building approval in seumter. If the system will do utilization and management with the building approval system, the applicant can be using BIM base design document information and saving the time that takes at building approval submission. Study about the system improvement is required for application to building approval system.

  • PDF

A Study on the BIM-based Green building Simulation System (BIM(Building Information Modeling) 기반의 친환경 건축 시뮬레이션 시스템에 관한 연구)

  • Jeon, Seung-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.758-762
    • /
    • 2008
  • As development of IT technology, Interest of Green building has been increasing rapidly. Because the construction industry is on the center of Green development, Green construction management is demanded for efficient analysis solution of building performance. BIM has a object-oriented parametric modeling technology. IT, which green building's performance management and analysis, is very useful. A green building certification is essential course in the green building construction. So this Paper suggest him based green building simulation system. The him based green building simulation system will support resonable decision making on the early construction phase.

  • PDF

Interlocking Earthen Masonry Units for Sustainable Residential Building Construction

  • Lubbering, Noah;Awolusi, Ibukun;Langar, Sandeep;Schultz, Arturo
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1024-1031
    • /
    • 2022
  • In addressing the goal for sustainability in the construction industry, the very materials used for construction and the methods utilized to implement said materials must be analyzed. Specifically, some traditional residential construction materials consist of wood, steel, and concrete. Because these materials vary in their levels of sustainability, there is a need to develop and explore new or other materials that can be used for residential construction. The primary purpose of this paper is to provide a review of interlocking earthen masonry units (IEMU) as an alternative option for residential building construction. This is in an effort to explore the variables impacting their existing and potential applications as sustainable materials and a method for residential building construction. IEMU's are then examined under the triple bottom line (TBL) sustainability framework which includes analyzing the environmental, economic, and social sustainability of IEMU's. The findings of this review may lead to further progression in the development of a framework for evaluating U.S. stakeholder adoption of IEMU's and potential implementation in U.S. residential construction.

  • PDF

Schedule Management for Green Building Projects in Singapore: Schedule Delay, Causal Factors and Solutions

  • Hwang, Bon-Gang;Zhao, Xianbo;Leong, Lay Peng
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.527-531
    • /
    • 2015
  • With the mounting concerns over environmental issues, green construction is gaining a place in the global construction industry. However, rare research has been conducted to analyze green construction projects, especially in the aspect of project schedule performance. As a result, this study aims to investigate the degree of project delay in green building construction, analyze the factors affecting schedule delay of green building projects, and finally provide recommendations to improve schedule performance of green building project. To achieve the objectives, a comprehensive literature review was carried out, followed by a survey conducted with 30 companies that provided data from 220 traditional and 96 green building projects. The analysis of the responses identified that 15.9% of the traditional building projects were delayed while 32.3% of the green building projects were completed behind schedule. Furthermore, the amount of the delays in green building projects was an average of 4.8% of their planned schedule. The top 5 critical factors that can cause delay in green building projects were identified as: (1) speed of decision-making by clients; (2) speed of decision-making involving all project teams; (3) communication/coordination between key parties; (4) level of experience of consultants; and (5) difficulties in contractors' project financing. Lastly, a list of recommendations was introduced, aiming to reduce schedule delay in green building construction projects based on the observations. This study will serve as s a base for further research on the enhancement of green building project schedule performance.

  • PDF

The Analysis for Development Evaluation System of G-SEED Building Maintenance and Management (녹색건축인증 건축물 유지관리 평가제도 발전을 위한 연구)

  • Kim, Yu-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.261-262
    • /
    • 2016
  • In Korea, Green building certification system had been operated for more than 10 years and Expired certification buildings are ever-increasing. However, post management of building and qualification standard for re-certification(G-SEED) aren't exist, certificated green building don't have smoothly maintenance and management. Therefore, analysing the status and situation of similar system such as building maintenance and management, to suggest the direction of evaluation for green standard for energy and environmental design.

  • PDF

Analysis of Cost-Increasing Factors in High-rise Building Construction Projects Using Delphi Method (델파이 기법을 이용한 초고층 건축시공의 공사비 상승요인 분석방법에 관한 연구)

  • Lee, Byeong-Hun;Jin, Hyun-Soo;Kim, Kyong-Hoon;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.105-109
    • /
    • 2010
  • Nowadays, the construction of high-rise building is rapidly increasing. There are many cost-increasing factors to the management in the high-rise building construction. For large and complex projects like the high-rise building construction, the more systematic methods and tools are needed for cost control. It is important to identify major cost control items and to manage them for effective cost management in the high-rise building construction. This study proposes a method of identifying major cost-increasing factors in the high-rise building construction based on the Delphi method.

  • PDF