• Title/Summary/Keyword: Building Automation

Search Result 497, Processing Time 0.032 seconds

A Study on the Productivity Analysis of a Building Automation System (건물구조체(建物構造體) 자동화(自動化) 시스템의 생산성(生產性) 분석(分析)을 위한 기초적(基礎的) 연구(硏究))

  • Kim, Chang-Kyu;Song, In-Shick;Lee, Hyun-Soo;Lim, Sang-Chae
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.05a
    • /
    • pp.111-115
    • /
    • 2008
  • The productivity is the one of the primary elements to evaluate the new systems performance for building construction along with the economic efficiency, the safety, and the quality improvement. At present the on-site construction automation systems(we will call it as Construction Factory or CF hereafter) is under the development by research group for construction automation of high-rise building. The system includes many sub-systems such as a robotic crane, a construction factory, bolting robots, a building material management system using RFID and so on. In this study we discuss and propose the method to evaluate for these hybrid on-site automation system fundamentally. In future we devise a framework of evaluation modules for the on-site building automation system on the basis of this discuss.

  • PDF

Intelligent building and building automation system (인텔리전트 빌딩과 BA 시스템)

  • 김광우
    • The Magazine of the Society of Air-Conditioning and Refrigerating Engineers of Korea
    • /
    • v.28 no.3
    • /
    • pp.203-207
    • /
    • 1999
  • 인텔리전트 빌딩(IB : Intelligent Building)이란 용어가 처음 사용된 것은 1984년 1월에 미국의 코네티컷주 하트포트에 건설된 시티 플레이스(City Place) 빌딩에 빌딩 자동화(BA : Building Automation), 사무 자동화(OA : Office automation), 통신(TC : Tele-Communication) 시스템을 구축한 UTBS(United Technologies Building System)사가 빌딩의 특징을 설명하면서부터였다.

  • PDF

Conceptual Design of Intelligent Building Automation System Using Computer-Aided Systems Engineering Approach (시스템공학 접근법을 이용한 지능형 건물 자동화 시스템의 개념설계)

  • 유일상;박영원
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.3 no.2
    • /
    • pp.166-178
    • /
    • 2000
  • As the 21st century signifies an information-oriented society, the computer integration takes place in all walks of human presence. Needs for computer and network-integrated automation present new challenges in military as well as commercial facility systems engineering. Since the first intelligent building appeared in USA in 1984, it gradually became an essential capability for the building industry requirement these days. Intelligent Building System(IBS) is evolving to be very complex because there are many subsystems such as telecommunication(TC), office automation(OA), building automation(BA), security, construction environments, etc. During the planing phase of IBS development, therefore, a disciplined systems engineering must be performed to analyze stake- holder's requirements to build an optimized system while minimizing trial-and-error expenses and risks. This paper presents a conceptual design of BAS applying systems engineering methods. The contribution of this study includes the development of IBS subsystem specification for building automation subsystem, which is a part of IBS, using the methodology of requirement analysis, functional analysis, synthesis, and verification. A computer-aided systems engineering s/w, RDD-100, was used to improve the system design efficiency and to promote the product design knowledge management for reuse in later design programs.

  • PDF

Automation Technology Application for Efficient Project Management of Steel Framing High-rise Building Construction (고층 철골공사의 사업관리 효율화를 위한 자동화 기술 적용 방안 연구)

  • Kim, Chane-Seop;Yun, Seok-Heon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.3-4
    • /
    • 2010
  • With improvements of information technology, the cases which automation technology are applied to construction site are increased. These technologies have advantages and limitations for construction site, therefore they has to be considered in order to maximize benefit. This study are to suggest the process for optimizing management of steel framing high-rise building construction.

  • PDF

Critical Management Factor of Elemental Techniques for Construction Automation System in High-Rise Building (고층건물 적용을 위한 시공자동화시스템 요소기술의 중점 관리사항 도출)

  • Cho, Nam-Seok;Kim, Chang-Won;Cho, Hun-Hee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.15-16
    • /
    • 2011
  • Construction automation and robotics are being taken notice as an alternative to improve productivity and quality. Reflecting on these purpose, automation system, called RCA(Robotic-crane based Construction Automation) system, is developed and have been verified through a pilot project recently in Korea. To apply the RCA system in high-rise building effectively, each management factors of element technologies in the system is derived and assessed critical factor. The purpose of this study, management factors of element techniques, consisted of RCA system, is classified through questionnaires/interviews targeting system developers and construction managers in pilot project site, and critical factors is selected using AHP.

  • PDF

Architecture Study for SDDC BAS (SDDC BAS의 아키텍처에 관한 연구)

  • Kim, Jeong-Uk
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.1
    • /
    • pp.646-651
    • /
    • 2015
  • In this paper, we analyze the architecture of a typical building automation systems and control points in the network architecture, interoperability, and performance aspects. We proposed a new virtualization-based point-to-point automatic control system that is connected to a high speed wired system. Cloud computing based automation system enables the user based environment control, and may perform a building energy management performance through the improvement of the building automation system efficiently In addition, the virtualization system makes it possible to perform the management of the group building load management operators efficiently.

A House Design Automation System Based on the "Design-by-Novice" Paradigm

  • Kim, Uk;Choi, Jinwon;Kim, SungAh
    • Architectural research
    • /
    • v.1 no.1
    • /
    • pp.23-30
    • /
    • 1999
  • This research investigates a system for house design automation. The system is based on an object-oriented building data model, aiming to support the house design process conducted by non-expert users. Its object model, with simple yet powerful user interfaces, enables a CAD system to handle a complicated building system with much ease. Hence, the model dramatically simplifies the design process beyond just the automatic document generation. In this paper, we discuss the aspects of the building data model, introduce critical concepts such as grid objects and structured floor plan, and present a prototype system called GPLAN. The system is implemented in the framework of our building data model, and it provides a host of intelligent features that have been proved useful for house design automation.

  • PDF

Developing Intelligent Control Modules with LonTalk Protocol for Intelligent Building System & Home Automation

  • Hong, Won-Pyo;Kim, Dong-Hwa;Lee, Sung-Hak
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2002.11a
    • /
    • pp.355-361
    • /
    • 2002
  • There are many economic and operational reasons to integrate fire alarm signaling system with other building automation system. Integration of this requires open network with for the standard communication protocol and careful design practices. The important point for this is also the development of intelligent control modules for replacing the conventional zone adapter in fire system. Therefore, this paper proposes an new conceptual design of the open distributed fire alarm signaling system for the integration of BAS, a new intelligent control modules with LonTalk protocol and a new control modules for power line communication. Newly proposed additions to LonWorks network make it very well suited for integrating fire systems with other building automation sub-systems and another BAS with low cost. Additionally, it is very important that best design practices, test procedures and building codes need to be modernized to accommodate integrated building systems.

  • PDF

Automation of Architectural Design Process and Robotic System in Building Construction using Object-Oriented Design

  • Choo, Seung-Yeon;Park, Sang-Min
    • Journal of Korea Multimedia Society
    • /
    • v.12 no.12
    • /
    • pp.1787-1795
    • /
    • 2009
  • This paper describes an automation of architectural design processes and the direction between this automation and robotic system in building construction using the concept of the object-oriented design in architecture. The research starts from the premise that many computer-aided design systems are mostly aimed at serving as drawing tools which are used only after a design formal solution has already been established by the architect. If the computer is well applied to the architectural design process, many positive things such as standardization of design detail, increasing productivity and collaboration, minimizing construction costs etc. can be done. To support an early design solution in the computer-based environment, the proposed automation was developed and tested in a real building project, using the object-oriented design concept such as product model. This design automation gives various design alternatives from the early design phase to the final stage of design details, according to musical harmony. This paper shows how architectural design process can be automated and how the data of the applied architectural design can be integrated into product model environment, in relation to robotic system in building construction.

  • PDF

Advanced Integration of Building Automation System (빌딩 오토메이션 시스템의 향상된 통합 방안)

  • Leem, Chae-Sung;Shim, Il-Joo;Chang, Kyung-Bae;Baek, Sang-Min;You, Jong-Il;Jung, Eui-Kuk;Park, Gwi-Tae
    • Proceedings of the KIEE Conference
    • /
    • 2003.11c
    • /
    • pp.496-499
    • /
    • 2003
  • System Integration is significant role in building, because it is that the more building system is integrated, the more they can save management costs and energy costs. Nowadays system protocols in building use BACnet, LonWorks, etc. to integrate effectively, but their interoperability is not perfect. Therefore, we propose system integration using Ethernet and TCP/IP for perfect harmony. When data network protocol, Ethernet and TCP/IP is used for control network, there are several problems. But there have been solved by many researches. therefore it is possible that building system integrate to use Ethernet and TCP/IP. Finally, we show that Ethernet and TCP/IP can be used for building automation system integration.

  • PDF