Kim, Chang-Kyu;Song, In-Shick;Lee, Hyun-Soo;Lim, Sang-Chae
Proceedings of the Korean Institute of Building Construction Conference
/
2008.05a
/
pp.111-115
/
2008
The productivity is the one of the primary elements to evaluate the new systems performance for building construction along with the economic efficiency, the safety, and the quality improvement. At present the on-site construction automation systems(we will call it as Construction Factory or CF hereafter) is under the development by research group for construction automation of high-rise building. The system includes many sub-systems such as a robotic crane, a construction factory, bolting robots, a building material management system using RFID and so on. In this study we discuss and propose the method to evaluate for these hybrid on-site automation system fundamentally. In future we devise a framework of evaluation modules for the on-site building automation system on the basis of this discuss.
The Magazine of the Society of Air-Conditioning and Refrigerating Engineers of Korea
/
v.28
no.3
/
pp.203-207
/
1999
인텔리전트 빌딩(IB : Intelligent Building)이란 용어가 처음 사용된 것은 1984년 1월에 미국의 코네티컷주 하트포트에 건설된 시티 플레이스(City Place) 빌딩에 빌딩 자동화(BA : Building Automation), 사무 자동화(OA : Office automation), 통신(TC : Tele-Communication) 시스템을 구축한 UTBS(United Technologies Building System)사가 빌딩의 특징을 설명하면서부터였다.
Journal of the Korea Institute of Military Science and Technology
/
v.3
no.2
/
pp.166-178
/
2000
As the 21st century signifies an information-oriented society, the computer integration takes place in all walks of human presence. Needs for computer and network-integrated automation present new challenges in military as well as commercial facility systems engineering. Since the first intelligent building appeared in USA in 1984, it gradually became an essential capability for the building industry requirement these days. Intelligent Building System(IBS) is evolving to be very complex because there are many subsystems such as telecommunication(TC), office automation(OA), building automation(BA), security, construction environments, etc. During the planing phase of IBS development, therefore, a disciplined systems engineering must be performed to analyze stake- holder's requirements to build an optimized system while minimizing trial-and-error expenses and risks. This paper presents a conceptual design of BAS applying systems engineering methods. The contribution of this study includes the development of IBS subsystem specification for building automation subsystem, which is a part of IBS, using the methodology of requirement analysis, functional analysis, synthesis, and verification. A computer-aided systems engineering s/w, RDD-100, was used to improve the system design efficiency and to promote the product design knowledge management for reuse in later design programs.
Proceedings of the Korean Institute of Building Construction Conference
/
2010.05a
/
pp.3-4
/
2010
With improvements of information technology, the cases which automation technology are applied to construction site are increased. These technologies have advantages and limitations for construction site, therefore they has to be considered in order to maximize benefit. This study are to suggest the process for optimizing management of steel framing high-rise building construction.
Proceedings of the Korean Institute of Building Construction Conference
/
2011.11a
/
pp.15-16
/
2011
Construction automation and robotics are being taken notice as an alternative to improve productivity and quality. Reflecting on these purpose, automation system, called RCA(Robotic-crane based Construction Automation) system, is developed and have been verified through a pilot project recently in Korea. To apply the RCA system in high-rise building effectively, each management factors of element technologies in the system is derived and assessed critical factor. The purpose of this study, management factors of element techniques, consisted of RCA system, is classified through questionnaires/interviews targeting system developers and construction managers in pilot project site, and critical factors is selected using AHP.
Journal of the Korea Academia-Industrial cooperation Society
/
v.16
no.1
/
pp.646-651
/
2015
In this paper, we analyze the architecture of a typical building automation systems and control points in the network architecture, interoperability, and performance aspects. We proposed a new virtualization-based point-to-point automatic control system that is connected to a high speed wired system. Cloud computing based automation system enables the user based environment control, and may perform a building energy management performance through the improvement of the building automation system efficiently In addition, the virtualization system makes it possible to perform the management of the group building load management operators efficiently.
This research investigates a system for house design automation. The system is based on an object-oriented building data model, aiming to support the house design process conducted by non-expert users. Its object model, with simple yet powerful user interfaces, enables a CAD system to handle a complicated building system with much ease. Hence, the model dramatically simplifies the design process beyond just the automatic document generation. In this paper, we discuss the aspects of the building data model, introduce critical concepts such as grid objects and structured floor plan, and present a prototype system called GPLAN. The system is implemented in the framework of our building data model, and it provides a host of intelligent features that have been proved useful for house design automation.
Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
/
2002.11a
/
pp.355-361
/
2002
There are many economic and operational reasons to integrate fire alarm signaling system with other building automation system. Integration of this requires open network with for the standard communication protocol and careful design practices. The important point for this is also the development of intelligent control modules for replacing the conventional zone adapter in fire system. Therefore, this paper proposes an new conceptual design of the open distributed fire alarm signaling system for the integration of BAS, a new intelligent control modules with LonTalk protocol and a new control modules for power line communication. Newly proposed additions to LonWorks network make it very well suited for integrating fire systems with other building automation sub-systems and another BAS with low cost. Additionally, it is very important that best design practices, test procedures and building codes need to be modernized to accommodate integrated building systems.
This paper describes an automation of architectural design processes and the direction between this automation and robotic system in building construction using the concept of the object-oriented design in architecture. The research starts from the premise that many computer-aided design systems are mostly aimed at serving as drawing tools which are used only after a design formal solution has already been established by the architect. If the computer is well applied to the architectural design process, many positive things such as standardization of design detail, increasing productivity and collaboration, minimizing construction costs etc. can be done. To support an early design solution in the computer-based environment, the proposed automation was developed and tested in a real building project, using the object-oriented design concept such as product model. This design automation gives various design alternatives from the early design phase to the final stage of design details, according to musical harmony. This paper shows how architectural design process can be automated and how the data of the applied architectural design can be integrated into product model environment, in relation to robotic system in building construction.
System Integration is significant role in building, because it is that the more building system is integrated, the more they can save management costs and energy costs. Nowadays system protocols in building use BACnet, LonWorks, etc. to integrate effectively, but their interoperability is not perfect. Therefore, we propose system integration using Ethernet and TCP/IP for perfect harmony. When data network protocol, Ethernet and TCP/IP is used for control network, there are several problems. But there have been solved by many researches. therefore it is possible that building system integrate to use Ethernet and TCP/IP. Finally, we show that Ethernet and TCP/IP can be used for building automation system integration.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.