• Title/Summary/Keyword: Build-to-order

Search Result 1,985, Processing Time 0.035 seconds

Preliminary Study on the Factors Analysis of Change Order-Claim in Design-Build Project (설계시공일괄입찰공사의 설계변경 클레임요인 분석에 관한 기초 연구)

  • Ryu, Hyeok-Jun;Park, Byung-Ju;Yoo, Seung-Kyu;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.129-130
    • /
    • 2012
  • Although the order of Design-Build is being expanded by increasing construction scale and demanding hybrid function, the suitable regulation of the contracts is not settled. Design-Build is way by government because there are big construction of much government leading in contract relation high position occupy. So, case that prebendary's claim institution develops by litigation is very rare. But, recently Design-Build is magnified. So, these dispute factors is becoming visualization gradually. The contract system is needed to be consistent by international standard to deal with the problem. This study suggests the useful solutions in detail concerned with the main factor of change order claim by each Design-Build phases through practical sorting and analysis of the causes of Change Order-Claim.

  • PDF

Advanced Planning System: A Prerequisite for Achieving Build-to-Order Environment (주문생산에 필수적인 진보적 생산계획 시스템)

  • 강윤식;이휘재;문광원;노성관;임헌욱
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2002.10a
    • /
    • pp.93-96
    • /
    • 2002
  • The manufacturing paradigm has shifted dramatically over the past decade from “push” or mass production mode to “pull” or customer-driven, order-based manufacturing mode, as multitudes of customers now demand mass customization of configurable products. As a means to achieve such rapidly responsive manufacturing system, Advanced Planning System (APS) has become an essential software tool for achieving modern “build-to-order” and “configure-to-order” manufacturing environment. APS enables manufacturers to respond to variety of customer demands In real time by instantly configuring manufacturing processes based on specifications described in each purchase orders and providing capable-to-promise information directly to customer by performing rapid “what-if” manufacturing simulated scenarios. This paper discusses the working of such system as well as the business processes that incorporate such systems to enable efficient “build-to-order” environment.

  • PDF

Decision Issues on Part Supply in Build-to-Order Manufacturing Systems (주문생산방식 제조시스템에서 부품공급에 관한 의사결정 이슈)

  • Choi, Ki-Seok
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.39 no.1
    • /
    • pp.78-81
    • /
    • 2013
  • In Build-to-Order manufacturing systems, products are usually manufactured by a pull system. The manufacturers order only what they need when it is needed. The suppliers are expected to deliver parts as much as needed. When the part demand fluctuates significantly, this places lots of challenges on the suppliers. In this letter, we explore the decision issues regarding part supplies for Build-to-Order manufacturing systems, especially in the auto industry, and suggest how to address them in order to make the manufacturing systems work more efficiently.

Design-Build Change Order Impacts in Highway Projects

  • Ryu, Kyeong Rok;Choi, Kunhee;Ryoo, Boong Yeol;Kang, Julian H.
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.371-375
    • /
    • 2015
  • Design-Build (DB) has gained in popularity in roadway projects due to its defining advantage to improve communication and fast-track project delivery. However, very little is known about the impact of change order frequency and occurrence timing pertaining to DB projects. The study analyzes their impacts on project time and cost performance by conducting a rigorous numerical analysis drawing on 530 3R (rehabilitation, reconstruction, and resurfacing) projects completed between 2002 and 2011 in Florida by using a multiple linear regression. The results indicate that DB outperformed Design-Bid-Build in project cost as well as time. Critically, the regression analysis signifies that earlier change order occurrence caused more unfavorable impacts on schedule and cost. The proposed analyses and models will lead to the improved ability of agencies to quickly and more reliably estimate the potential change order impacts on schedule and cost.

  • PDF

Reduction of Surface Roughness and Build Time with Model Splitting Method for Multi-Jet Modeling 3D Printer Parts (Multi-Jet Modeling 3차원 프린트를 위한 표면거칠기와 제작시간의 저감을 위한 모델 분할제작)

  • Kim, Ho-Chan;Lee, In-Tak;Lee, Kyung-Chang;Lee, Suk;Lee, Seok-Hee
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.27 no.5
    • /
    • pp.807-814
    • /
    • 2003
  • 3D printers are widely used to verify the designs in the early stage of product development, and are required to have short build time. However, the build time is still too long for a quick design review for engineers. This research focuses on how to split the prototype in order to reduce the build time and improve surface roughness. In order to verify the feasibility of prototype splitting, the build time and the roughness have been experimentally measured for various parts and build orientations. Based on the experimental results an expert system was developed for splitting the original CAD mod el by using an efficient splitting method. It can recommend a splitting plane based on build time, surface roughness and the number of divided parts. It is shown that the model splitting reduces the build time significantly and improves surface quality wit bout rough surfaces where the support was removed.

A Study on the Integrated Estimation of Delivery and Manufacturing Cost for Build-to-Order Manufacturing (주문형 생산에서의 납기 및 원가 예측 연동에 관한 연구)

  • 김인준;강무진
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2004.10a
    • /
    • pp.1456-1461
    • /
    • 2004
  • Companies of Build-to-Order(BTO) strive to achieve customer responsiveness and cost efficiency simultaneously. The success of BTO depends upon the high volume production based on product plat form and delayed differentiation principle on the one hand, and upon the rapid estimation of delivery and cost for the customer orders on the other hand. Expeditious processing of a specific order requires the rearrangement of production resources and the schedule, which results in increased cost. This paper describes a cost estimation method using activity-based costing depending on the schedule change caused by urgent customer orders.

  • PDF

Output Behavior of Build-Up Force Measuring System (BUILD-UP 힘측정 시스템의 출력거동)

  • 강대임;송후근;홍창선
    • Transactions of the Korean Society of Mechanical Engineers
    • /
    • v.19 no.9
    • /
    • pp.2194-2205
    • /
    • 1995
  • In order to reduce the systematic error of a build-up system, we have proposed a new test procedure in which all force transducers in a build-up system are rotated by 90.deg. with a base platen fixed on a force standard machine. The setting positions of force transducers on the output of a build-up system were investigated using an orthogonal array. The effects of the parallelism of a build-up system and of the bending moment sensitivity of a force transducer were considered. The experimental results show that the setting position of the base platen hardly affects the output of the build-up system, but the setting positions of force transducers affects it strongly. It reveals that the new test procedure reduces effectively the systematic error of a build-up system.

Approaches to Build-to-Order Manufacturing System (주문 맞춤형 생산시스템에의 접근 방법)

  • 홍태영;강무진;박세형;이상봉
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2002.05a
    • /
    • pp.587-590
    • /
    • 2002
  • Build-to-Order (BTO) capabilities enable manufacturing firms to design, produce, and deliver a high volume of differentiated products that meet specific customer needs in timely manner as well as at close to mass-production prices. Aim of BTO is to simultaneously achieve customer responsiveness, cost efficiency, and high volume production. This paper attempts to define the BTO system and suggests the critical components for its realization. A case study is also described to show the impact of a successful BTO implementation.

  • PDF

Study of Cure Properties in Photopolymer for Stereolithography using Various Laser Bean Size (레이저빔 직경변화에 대한 광경화성 수지의 경화특성 고찰)

  • 이은덕;김준안;백인환
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2001.04a
    • /
    • pp.1089-1092
    • /
    • 2001
  • In the stereolithography process, build parameters are laser power, scan velocity, scan width, bean diameter, layer thickness and so on. These values are determined according to product accuracy and build time. Build time can be reduced by improving of scan velocity, laser power, layer thickness, hatching space and so on. But variation of these parameters influence part accuracy, surface roughness, strength. This paper observed cure properties in various beam diameter. In order to examine these, relationships of scan velocity and cure depth, scan velocity and cure width according to various beam diameter in one scan line are measured. And cure thickness is measured according to beam diameter and scan velocity in scan surface of one layer. For reduction of build time, beam diameter and scan velocity is proposed in stereolithography process.

  • PDF

Improvement of the Design-Build Bidding in the Domestic Construction Industry (국내 설계시공일괄입찰방식 개선방안)

  • Kim Su-Hyun;Jeon Min-Jeong;Koo Kyo-Jin;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.410-413
    • /
    • 2003
  • In order to build up competitive power in construction market and to cope with international policy, Design-Build bidding is one of the viable bidding system, encouraging collaboration between design office and building construction firm. Design-Build is a promising delivery system to help expediting schedules, saving costs, and improving Quality. However, the problems of Design-Build project in the domestic construction industry are not to be able to take advantages of fast-tracking and value engineering process, because of the problems of inappropriate system and participants' inexperience. The purpose of this study is to suggest alternatives for Design-Build bidding of public sector in the domestic construction industry in the costs, quality and time aspect.

  • PDF