• Title/Summary/Keyword: Build transfer lease project

Search Result 55, Processing Time 0.021 seconds

Comparison of infiltation rate for separate sewer system and combined sewer system in sewer maintenance areas (하수관로정비 지역의 분류식과 합류식 하수관로의 침입율 비교)

  • Gu, Gwangmo;Chu, Shaoxiong;Lim, Bongsu
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.34 no.3
    • /
    • pp.191-200
    • /
    • 2020
  • This study is to improve the efficiency of BTL (Build Transfer Lease) project operation by comparing the infiltration rate based on the data of 5 years of infiltration of the separate sewer system and combined sewer system. In the survey site, the separate sewer system area consists of eight flowmeters in seven treatment basins, and the combined sewer system area consists of eight flowmeters in five treatment basins. The infillration rate was analyzed by night-time domestic flow evaluation method, and the average infiltration rates of the separate sewer system and combined sewer system were 13% and 16%, respectively. Combined sewer system was about 1.3 times higher than the separate sewer system. The average BOD of separate sewer system was 233 mg/L, which was about 2.4 times higher than the combined sewer system was 107 mg/L. In the comparison of the average pipe diameter-length infiltration of separate sewer system and combined sewer system, the separate sewer system and the combined sewer system were about 0.150 ㎥/d/mm/km and about 0.109 ㎥/d/mm/km, respectively. The floating population in mixed residential and commercial areas has been identified as the cause. Therefore, we propose a method to calculate the infiltration rate in consideration of the margin ratio in the area where the night active population is concentrated.

A Study on School Facilities Build Transfer Lease Project - Centering on the improvement of the assessment - (학교시설 임대형민자사업의 평가기준 개선연구)

  • Kwon, Byoung-Koo;Lee, Jae-Rim;Jo, Jin-Il
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.7 no.2
    • /
    • pp.30-46
    • /
    • 2008
  • In this study, were prepared after statistical analysis was conducted of assessment items and marks distribution for the selection of executors of the BTL project. When tests of the degree of dispersion and degree of appropriateness for each assessment item were analyzed, it was found that the degree of dispersion among assessment points has the power of discrimination since it is highly marked in the design field and operation management field. In contrast, 'business management plan' and 'investment composition for economic quality assessment' have a low level of the power of discrimination since points given to them have smaller difference between business projects.

  • PDF

A Study on Maintenance Bundle Alternatives of BTL Project for Educational Facilities Using Complete Linkage Algorithm (컴플리트 링키지 알고리즘을 이용한 교육시설물 BTL사업 유지관리번들 구성방안에 관한 연구)

  • Cho, Chang-Yeon;Son, Jae-Ho
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.15 no.3
    • /
    • pp.4-16
    • /
    • 2008
  • BTL(Build-Transfer-Lease) Project for Education Facilities is contracted as a package which consists of several education facilities and its maintenance period is 20 years. Thus, total cost variation largely depends on the accuracy of the maintenance cost forecasting in the early stage in the life cycle of the BTL Projects. This research develops a method using complete linkage algorithm and branch & bound algorithm to help in finding optimal bundling combination. The result of this research suggests more reasonable and effective forecasting method for the maintenance bundle in BTL projects.

A STUDY ON DEVELOPING THE CALCULATION SYSTEM OF DISBURSEMENT FOR GOVERNMENT ON THE BTL PROJRCTS

  • Chun-Kyong Lee;Tae-Keun Park
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.649-657
    • /
    • 2009
  • BTL projects, which has been 3 years since it was carried out in 2008, trigged the controversy on the adequacy in the calculation of disbursement for Government due to such problems as low earning rate and the burden of service level compared with the project suggestion. Thus, the purpose of this study is to offer a suggestion on the calculation system for the purpose of the standardized - expense appropriation by item and database including the antecedent study on the finance model and the feasibility in BTL projects. The system is composed of 4 steps - project management, basic database, an analysis on expense by item and the result, and an analysis on sensitivity, and it is possible to carry out a comparative analysis on single and multi alternatives by variable change along with the ground on expense calculation.

  • PDF

Value Management of Private Finance Initiative Projects (민간투자사업을 위한 VE 적용방안)

  • Lim, Jong-Kwon;Kim, Seoung-Il
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.123-130
    • /
    • 2006
  • Recently, Korean government promotes BTL(Build-Transfer-Lease) for their public construction project to apply private sector's experience and finance initiatives. Many of public buildings and civil infrastructure projects were planned to be delivered by BTL and it helps to continue public projects under tight budget conditions. Since the characteristics of BTL projects, creative ideas for the project function, performance and its LCC (Life Cycle Cost) become more important than usual public work project. This paper introduces the systematic "VE job Plan" application techniques for BTL project and shows the process. This study shows the application of "VE job Plan" for BTL project to help decision making and value improvement. Also, Project cost was estimated by LCC (Life Cycle Cost) analysis. Technical "FAST diagram"was developed and used to find major functions of the project. So, it helps to improve performance of functions and make creative ideas. FAST diagram also help to find relationships between functions and cost. A case study (Daegu Art Gallery BTL Project) was conducted using proposed "VE job Plan. Study demonstrates how value management helps save money and increase functional performance. Researcher found that project can save cost and improve performance of functions significantly by using appropriate VE analysis process at appropriate time.

  • PDF

Problems and Solutions of private university dormitory project with PFI (민간투자사업을 활용한 사립대 기숙사의 문제점 및 개선방안)

  • Kim, Jong-Soo;Song, Nak-Hyun;Lee, Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.471-474
    • /
    • 2008
  • The range of PFI project has been expanded from Road facilities, Hobor facilities to Education facilities, Military residence facilities since 2005. Especially, The dormitory project that one of the most lucrative facilities among education facilities was progressing but it has many problems with introducing PFI project. This object of research is deriving problems by introducing PFI project and solving problems by consulting with experts. The results of research have had problems that increasing rental fee, difficulty of retrieving the investment and shortage of government supports. The solutions concerning the problems are using organization, introducing various programs and relieving regulation of government. This paper was made by consulting with experts and is expecting to use the basic data when comparing and analyzing the cases used PFI.

  • PDF

A Study on Model Establishment of the Validity Evaluation for BTL Project Expenses Using an Analytic Hierarchy Process (계층분석법(AHP)을 이용한 BTT사업비 타당성 평가모형 정립에 관한 연구)

  • Jung, Young-Han
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.6
    • /
    • pp.155-160
    • /
    • 2008
  • The BTL project, 4 years since its operation. has benchmarked the PFI Project in Japan and has been introduced. Given the evaluation step to select a preferred bidder, in a technological factor, the basic plans are corrected and complemented, whereas in a price factor, the low price bidding system is being enforced. There is concern that how to select preferred bidders and how to operate project costs during operation and management period may be problematic. Thus, in this study, using the Analytic Hierarchy Process, the method of deciding the priority to select preferred bidders in an early stage of the project and the evaluation model to evaluate the validity of BTL project expenses in process of project enforcement are established. Targeting the group composed of experts who have experiences in the BTL project. Then, the levelling of evaluation factors and grouping have been carried out as following : LCC analysis and disbursement for government including two more detailed factors.

A Study on Deduction of Reasonable Inspection Time in Educational Facilities Based on Regression Analysis (회귀분석을 이용한 합리적인 교육시설물 점검시간의 산정 기준 도출에 관한 연구)

  • Seok, Hyun-Su;Cho, Chang-Yeon;Kim, Jae-On;Son, Jae-Ho
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.14 no.4
    • /
    • pp.34-42
    • /
    • 2007
  • The investment of BTL(Build-Transfer-Lease) projects for the educational facilities has been increased since 2005. However, many trial errors and problems have been occurring due to the lack of inspection criteria in maintenance cost for the lift cycle of the facilities. Thus, purpose of this study is to derive regression equation for the daily inspection and the regular inspection through analysis of CAD data in order to set the inspection criteria. It is possible to calculate economical maintenance cost of BTL project in educational facilities using criteria of inspection time through the regression equation developed in this study.

Key Factors and Analysis Models of the Preliminary Feasibility Study in u-City Construction by Attracting Private Investment (민간투자유치를 통한 u-City 구축에 있어서 사전 타당성 분석의 핵심요인과 분석모델)

  • Kim, Myung-Dong;Park, Kwang-Ho
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.35 no.3
    • /
    • pp.1-6
    • /
    • 2012
  • This paper aims to suggest a validity analysis model that would be helpful for local governments considering u-City construction projects and a methodology for them to promote build-transfer-lease (BTL) u-City projects. This methodology mainly uses quantitative and qualitative analysis based on the Value For Money (VFM) designed by the Public and Private Infrastructure Investment Management Center (PIMAC) under the Korea Development Institute (KDI). BTL projects requires a large amount of capital and involves long-term investments. Therefore, multi-faceted validity analysis is required for the success of a project. This study will enumerate various factors to be considered in the pre-analysis of validity of BTL projects and suggest a methodology to verify them. A case study of a BTL project promoted by Ansan City assisted in designing this study in detail.

Changes of Spatial Composition by Project Phase of Homebase and Media-space on Variation Type Middle and High Schools (교과교실제 중등학교 홈베이스와 미디어스페이스의 사업단계별 공간구성 변화)

  • Park, Im-Ho;Jung, Jin-Ju
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.21 no.2
    • /
    • pp.13-24
    • /
    • 2014
  • This study compared and analyzed middle and high school's homebase and media space which are installed along with the introduction of subject classroom system operation method, with regard to the position of arrangement, the type of arrangement, and the change of area, etc. which were changed and applied per the phase of project. For this, design competitions were implemented since 2006 targeting the cases which participated in design directly-indirectly in the researcher's architectural firm, present construction documents among the selected BTL(Build-Transfer-Lease) were completed, and the examples of 10 schools(design competitions 2 schools, BTL selected plans 8 schools) were analyzed, which were operating variation type.