• Title/Summary/Keyword: Build

Search Result 9,127, Processing Time 0.039 seconds

Wear characteristics of build-up weld metal using CH-90 Electrode (CH-90 용접봉을 이용한 육성 용접부의 마모 특성에 관한 연구)

  • Lee, Bo-Yeong;An, Dae-Hwan;Kim, Jae-Seong;Jin, Hyeong-Guk
    • Proceedings of the KWS Conference
    • /
    • 2006.10a
    • /
    • pp.225-227
    • /
    • 2006
  • As rail steel at a crossing area must undergo much higher loading than those at regular railway, Mn-alloyed steel is normally used for its high load-carrying capability and reduced wear rate. However, as these Mn-alloyed steel is tend to have casting defects, manufacturing cost to produce defect-free Mn-alloyed steel becomes quite expensive. Therefore, in order to replace Mn-alloyed steel, we performed build-up welding using CH-90 and investigated regarding to wear characteristics of build-up weld metal.

  • PDF

The Impact of Design-Bid-Build Procurement Methods on Project Performance in Libya

  • Ghadamsi, Alaeddin;Braimah, Nuhu
    • Journal of Construction Engineering and Project Management
    • /
    • v.6 no.2
    • /
    • pp.16-23
    • /
    • 2016
  • The use of inappropriate procurement methods to deliver construction projects has long been acknowledged as a major source of poor project performance and is particularly problematic for the Libyan Construction Industry. Poor procurement method selection has been recognised as a major contributory factor to frequent time and cost overruns. This paper offers a way of selecting specific procurement methods to maximize successful project performance. The methodology involves an intensive review of relevant literature, followed by a semi-structured questionnaire survey. The key findings of the study reveal that 11 out of its 12 common selection criteria exhibit a significant contribution to one or more project performance criteria (time, cost and quality). Project clients should therefore prioritise these criteria when selecting a design-bid-build method. Knowledge of the criteria that contribute positively to project performance will also enable clients to work out, prior to and during construction, the best measures and provisions for successful project outcomes.

Selection of Build Orientation for Reducing Surface Roughness with Stereolithography Parts (광조형물의 표면 거칠기 저감을 위한 성형방향의 선정)

  • 안대건;김호찬;이석희
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 1997.10a
    • /
    • pp.137-140
    • /
    • 1997
  • In general, stereolithography parts is not suitable for master pattern. Because of its bad surface roughness. Therefore, To reduce roughness it requires post-process that is depending on user skill and takes long time to do. This study aims to develop an expert system which can select an optimal build orientation, reduce roughness and shorten post-processing time. Genetic Algorithm was introduced for optimization. A simplified computation model was developed for real-time response. For accurate roughness estimation, mterpolation of experimental data was implemented.

  • PDF

Overlapping Design-Build-Test Cycles in Vehicle Development Process : System Dynamics Approach (시스템 다이나믹스를 이용한 자동차 개발 단계에서 Design-Build-Test Cycle의 중복에 대한 연구)

  • Lee, Sang-Don;Lim, Ik-Sung
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.29 no.3
    • /
    • pp.25-32
    • /
    • 2006
  • 자동차 개발 단계는, 본질적으로, 수차례의 개발 단계를 거치면서 설계 그룹들 간의 정보 전달과 교환이 여러 차례 반복적으로 발생하게 된다. 이러한 복잡한 상호 정보 교환 과정을 정확하게 이해하여 업무가 수행되지 못하면 불필요한 재작업을 야기시킬 수 있으며, 이는 비용 낭비 및 계획에 차질이 발생할 수 있다. 이 연구에서는 시스템 다이나믹 모델을 개발하여 빈번한 design-built-test 싸이클이 자동차 개발 단계에 미치는 영향 및 이점들을 고찰하였다.

Improvement Factors of Promoter Selection Evaluation Criteria for Build-Transfer-Lease Private Participation in Infrastructure Projects (BTL사업의 사업시행자 평가기준 개선 요인 분석)

  • Shin, Hyun-In;Park, Tae-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.310-316
    • /
    • 2006
  • Since 'Act on Private Participation in Infrastructure' were changed in January 2005, BTL(Build-Transfer-Lease) projects of Private Participation in Infrastructure was introduced in the domestic construction market for the purpose of providing public facilities with the public. Selecting the most qualified Promoter should be considered discreetly in BTL projects because BTL projects is for projects with approximately thirty year project life cycle, plan, construction, operating, maintenance and obviously the success of the project totally depends on the capability and role of Promoter. However, score for cost is likely to influence selecting Promoter to take the project. Accordingly, low bid contract with too much competition could decrease the quality of the construction plan and operating plan. Thus, this study did preliminary research and documents on problems of evaluation criteria for selecting Promoter in BTL projects, and proposed improvement factors by doing questionnaire over specialists of each field.

  • PDF

Optimum Radial Build of a Low Aspect Ratio Tokamak Reactor

  • Hong, B.G.;Hwang, Y.S.;Kang, J.S.
    • Proceedings of the Korean Vacuum Society Conference
    • /
    • 2011.02a
    • /
    • pp.397-397
    • /
    • 2011
  • In a low aspect ratio (LAR) tokamak reactor with a superconducting toroidal field (TF) coil, the radial build of TF coil and the shield play a key role in determining the size of a reactor. For self-consistent determination of the reactor components and physics parameters, a system analysis code is coupled with one-dimensional radiation transport code. Conceptual design study of a compact superconducting LAR tokamak reactor with aspect ratio less than 2.5 was conducted and the optimum radial build was identified. It is shown that the use of an improved shielding material and high temperature superconducting magnets with high critical current density opens up the possibility of a fusion power plant with compact size and small re-circulating power simultaneously at low aspect ratio, and that by using an inboard neutron reflector instead of breeding blanket, tritium self-sufficiency is possible with outboard blanket only and thus compact sized reactor is viable.

  • PDF

Case Analysis of Program Outcomes Depending on Teaching Methods in Engineering Design Course (공학설계 교과목에서 교수-학습 방법에 따른 학습성과 분석 사례)

  • Kim, In-sook;Kang, Tae-wook
    • Journal of Engineering Education Research
    • /
    • v.19 no.2
    • /
    • pp.8-13
    • /
    • 2016
  • This paper is concerned with the development case of CEA(Course-Embedded Assessment) design tool for engineering education accreditation operations department for CEA system implemented. Each university or programs are already devoting efforts to build research and CEA system for CEA applied to. In order to effectively apply the CEA studies for each program it is required and particularly, the preferred way to build an operating system is considered a difficult situation of the course unit. Therefore, this case study and to propose a method and procedures required to assessment the design basis for curriculum and program assessment unit in terms of the applicability of CEA, proposes a virtual application results. The information proposed in this case study is determined that could be used in the design for the outcomes and assessment of a variety of programs as one of the steps to build the CEA systems.

Ontology-based Conceptual Model Building Framework for Discrete Event Simulation (온톨로지를 이용한 이산 사건 시뮬레이션의 개념적 모델 구축 지원에 관한 연구)

  • Park, Jisung;Jeong, Sunghwan;Sohn, Mye
    • Korean Journal of Computational Design and Engineering
    • /
    • v.19 no.1
    • /
    • pp.29-40
    • /
    • 2014
  • Conceptual Modeling is the process of abstracting a model from a real or proposed system. It is probably the most important aspect of a simulation study. Relate works show that the elementary developers devoted little time to understanding how the systems actually worked, namely they didn't build appropriate conceptual model. Thus, the result of simulation is inconsistent because it depends on developer's competence. Although many researchers suggested various techniques enabling developer to build conceptual model, there were several limitations. In this study, to overcome the limitations of existing techniques, we proposed COMBINE-DES (COnceptual Model BuildINg framEwork using ontology for Discrete Event Simulation). The COM-BINE-DES supports expediting the conceptual modeling with Solution ontology generated by Domain ontology and Simulation ontology. Moreover, it provides consistent simulation result regardless of repeated modeling.

SRAM Reuse Design and Verification by Redundancy Memory (여분의 메모리를 이용한 SRAM 재사용 설계 및 검증)

  • Shim Eun sung;Chang Hoon
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.30 no.4A
    • /
    • pp.328-335
    • /
    • 2005
  • bIn this paper, built-in self-repair(BISR) is proposed for semiconductor memories. BISR is consisted of BIST(Buit-in self-test) and BIRU(Built-In Remapping Uint). BIST circuits are required not oがy to detect the presence of faults but also to specify their locations for repair. The memory rows are virtually divided into row blocks and reconfiguration is performed at the row block level instead of the traditional row level. According to the experimental result, we can verify algorithm for replacement of faulty cell.

Determination of Part Orientation and Packing in SLS Process (SLS에서의 자동적인 조형자세 및 배치 결정에 관한 연구)

  • Hur, Sung-Min;Chang, Pok-Keun;Choi, Kyung-Hyun;Lee, Seok-Hee
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.16 no.11
    • /
    • pp.139-147
    • /
    • 1999
  • Rapid Prototyping has made a drastic change in all industries which needs to reduce the time for the development of new products. Orientation and packing in rapid prototyping is considered as the most important factors to maximize the utilization of space in the build chamber and reduce build time. However, the decision of these parameter is mainly dependant on the operators's experience. This paper presents the methodology to find the optimal build layout considering an orientation and packing of multiple parts in SLS processing. Each part is represented as a voxel structure to deal with the inefficiency in a bounding box approach. Test results show that the adapted BL algorithm with a genetic algorithm(GA) can be applicable to a real industry.

  • PDF