• Title/Summary/Keyword: Bridge area

Search Result 748, Processing Time 0.027 seconds

The Research on the Bridge Design Development for the Improvement of Small City structures - Focusing on Wicheon-stream in Geochang County, Gyeongsangnam-do - (중소도시 구조물 개선을 위한 교량디자인 개발 연구 - 경남거창군 위천천을 중심으로 -)

  • Kim, KieSu
    • The Journal of the Korea Contents Association
    • /
    • v.14 no.10
    • /
    • pp.506-513
    • /
    • 2014
  • As a measure to overcome the limit of small city which is weak in spontaneous competitiveness and to improve the quality of environmental, cultural and economic life of dwellers, it analyzed the geographical characteristics of city, movement path, economic status and other simple problems comprehensively and produced the vague problem solutions for dwellers and the practical direction for design using the 3D simulation rendering in order to suggest the result to change the potential for urban policy into substantial alternative. Geochang-gun selected as research area is evaluated for the place with high symbolic value of bridge in terms of environment, and the new design development for this kind of public design can be the good measure to increase the competitiveness of the city. This research is to understand the direction of the bridge recreation project which provides the cultural space connecting with other areas and improves the competitiveness of small city and to suggest the appropriate bridge design in order to provide the reasonable maintenance direction related to the future development of public design and the achievement of the symbolism of the region and to suggest the examples of public design for the urban competitiveness. For this purpose, focusing on Wicheon-stream in Geochang County, Gyeongsangnam-do selected as the research and development area for bridge design, it is to design the concept design bridge newly emphasizing the symbolism of bridge-oriented city for the development of future city.

Geotechnical Engineering Progress with the Incheon Bridge Project

  • Cho, Sung-Min
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.133-144
    • /
    • 2009
  • Incheon Bridge, 18.4 km long sea-crossing bridge, will be opened to the traffic in October 2009 and this will be the new landmark of the gearing up north-east Asia as well as the largest & longest bridge of Korea. Incheon Bridge is the integrated set of several special featured bridges including a magnificent cable-stayed girder bridge which has a main span of 800 m width to cross the navigation channel in and out of the Port of Incheon. Incheon Bridge is making an epoch of long-span bridge designs thanks to the fully application of the AASHTO LRFD (load & resistance factor design) to both the superstructures and the substructures. A state-of-the-art of the geotechnologies which were applied to the Incheon Bridge construction project is introduced. The most Large-diameter drilled shafts were penetrated into the bedrock to support the colossal superstructures. The bearing capacity and deformational characteristics of the foundations were verified through the world's largest static pile load test. 8 full-scale pilot piles were tested in both offshore site and onshore area prior to the commencement of constructions. Compressible load beyond 30,000 tonf pressed a single 3 m diameter foundation pile by means of bi-directional loading method including the Osterberg cell techniques. Detailed site investigation to characterize the subsurface properties had been carried out. Geotextile tubes, tied sheet pile walls, and trestles were utilized to overcome the very large tidal difference between ebb and flow at the foreshore site. 44 circular-cell type dolphins surround the piers near the navigation channel to protect the bridge against the collision with aberrant vessels. Each dolphin structure consists of the flat sheet piled wall and infilled aggregates to absorb the collision impact. Geo-centrifugal tests were performed to evaluate the behavior of the dolphin in the seabed and to verify the numerical model for the design. Rip-rap embankments on the seabed are expected to prevent the scouring of the foundation. Prefabricated vertical drains, sand compaction piles, deep cement mixings, horizontal natural-fiber drains, and other subsidiary methods were used to improve the soft ground for the site of abutments, toll plazas, and access roads. Light-weight backfill using EPS blocks helps to reduce the earth pressure behind the abutment on the soft ground. Some kinds of reinforced earth like as MSE using geosynthetics were utilized for the ring wall of the abutment. Soil steel bridges made of corrugated steel plates and engineered backfills were constructed for the open-cut tunnel and the culvert. Diverse experiences of advanced designs and constructions from the Incheon Bridge project have been propagated by relevant engineers and it is strongly expected that significant achievements in geotechnical engineering through this project will contribute to the national development of the longspan bridge technologies remarkably.

  • PDF

Field Evaluation of Scour Countermeasure Using Geobag (지오백 세굴보호공법의 현장 적용성 평가)

  • Park, Jae-Hyun;Kwak, Ki-Seok;Lee, Ju-Hyung;Chung, Moon-Kyung
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.1251-1258
    • /
    • 2006
  • Field evaluation of new scour countermeasure using geobag and aggregate is performed to prepare for the basis of design and construction standard in Korea. Polyester non-woven geotextile is determined as a geobag material and tire cord is used to sew up the geobag which contain aggregate. Hwasang-gyo(bridge) is selected as a pilot test site through office review and field investigation. According to the design flood of Hwasang-gyo(bridge), the size and volume of geobag are calculated and construction area and required number of geobags are computed by considering the specification of the pier and foundation of the bridge. After construction, scour depth around geobag construction area is measured and the stability of geobag is ascertained by using pole and digital camera.

  • PDF

Analysis Method of the Damages to Rights of Light due to the Construction of the Bridge in Rural Areas (농촌지역에서 교량건설에 따른 일조 피해 분석 방법)

  • Lim, Jae-Han;Lee, Ji-Young;Jung, Jin-Ju
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.10 no.1
    • /
    • pp.67-74
    • /
    • 2008
  • Recently, construction of bridges in rural areas has been increased to preserve the natural environment. However this brings forth the disputes over rights of light in farmland. In urban areas, the disputes over rights of light have been settled on the authority of the national architectural law and only sunshine hours for winter solstice are considered. Basically, the point at issue is different between each case. The main issues of the dispute in rural area were the reduction of the crop cultivation and the increase of the heating cost in winter. The purpose of this study is to review the mediation process in national environmental dispute resolution commission to resolve these issues, and to set up the analysis method of rights of light and modelling equation of solar position. Furthermore, we aimed at analyzing the damaged hours of daylights in rural housing and the infringement rate of daylight in farmland through the case study. In conclusion, we estimated the sunshine hours during the whole damaged periods according to the elements of bridges, and presented the solution process of dispute over rights of light due to the construction of bridge in rural area.

  • PDF

Numerical simulation approach for structural capacity of corroded reinforced concrete bridge

  • Zhou, Xuhong;Tu, Xi;Chen, Airong;Wang, Yuqian
    • Advances in concrete construction
    • /
    • v.7 no.1
    • /
    • pp.11-22
    • /
    • 2019
  • A comprehensive assessing approach for durability of reinforced concrete structures dealing with the corrosion process of rebar subjected to the attack of aggressive agent from environment was proposed in this paper. Corrosion of rebar was suggested in the form of combination of global corrosion and pitting. Firstly, for the purposed of considering the influence of rebar's radius, a type of Plane Corrosion Model (PCM) based on uniform corrosion of rebar was introduced. By means of FE simulation approach, global corrosion process of rebar regarding PCM and LCM (Linear Corrosion Model) was regressed and compared according to the data from Laboratoire $Mat{\acute{e}}riaux$ et $Durabilit{\acute{e}}$ des Constructions (LMDC). Secondly, pitting factor model of rebar in general descend law with corrosion degree was introduced in terms of existing experimental data. Finally, with the comprehensive numerical simulation, the durability of an existing arch bridge was studied in depth in deterministic way, including diffusion process and sectional strength of typical cross section of arch, crossbeam and deck slab. Evolution of structural capacity considering life-cycle rehabilitation strategy indicated the degradation law of durability of reinforced arch bridges.

A Case Study of Degradation Characteristics for Rod-Insulator on Catenary System in Electric Railway (전기철도 전차선로 지지애자의 염해지역 열화특성 사례 연구)

  • Jung, Hosung;Park, Young
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.32 no.4
    • /
    • pp.263-266
    • /
    • 2019
  • In the Airport Railroad, the Yeongjong Bridge has a length of 4,420 m and connects Yeongjong Island with the mainland of Incheon City. The bridge is a two-level structure, consisting of a six-lane road at the upper level and a combination of a road and railroad at the lower level. The environmental conditions for the electric railway come mainly from the salt injury area and a heavy industry zone, and the maintenance cycles are determined differently depending on these conditions. This study analyzed the deterioration characteristics of long rod insulators produced with a movable ceramic bracket and polymer materials in the Yeongjong Bridge section of the Airport Railway operating in the salt injury area according to the material characteristics. Comparison of the corona measurements when the insulators were cleaned at the same time showed that the polymer insulator had a higher insulation performance than the ceramic insulator.

Vessel Traffic Safety Assessment for the Construction of the Mokpo Bridge (목표 연육교 건설에 따른 선박 통항 안전성 평가)

  • 양찬수;공인영
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2004.04a
    • /
    • pp.209-216
    • /
    • 2004
  • In A bridge which connects Mokpo North Harbor and Com Island is going to be constructed until 2009. For the bridges being built in the navigable water area, it is indispensible to carry out vessel traffic safety assessment from the viewpoint of shiphandlers, however, there exist no specific guidelines for the necessary conditions whim the bridge designers can rely on. In this paper, traffic safety assessment procedures for the layout of the bridge is briefly introduced, and the conditions whim should be taken into account at the initial design stage of the bridge is surveyed. For the safety assessment of the bridge design, ship navigation simulations, such as RTS(real time simulation} and FTS(fast time simulation), are carried out, the results of which are statistically analysed to estimate the probability of collision between the ship and the pier of the bridge.

  • PDF

Vessel Traffic Safety Assessment for the Construction of the Mokpo Bridge (목포 연육교 건설에 따른 선박 통항 안전성 평가)

  • Yang, Chan-Su;Gong, In-Young;Lee, Chang-Min
    • Journal of Navigation and Port Research
    • /
    • v.28 no.8
    • /
    • pp.735-743
    • /
    • 2004
  • A bridge which connects Mokpo North Harbor and Goha Island is going to be constructed until 2009. For the bridges being built in the navigable water area, it is indispensible to carry out vessel traffic safety assessment from the viewpoint of shiphandlers, however, there exist no specific guidelines for the necessary conditions which the bridge designers can rely on. In this paper, traffic safety assessment procedures for the layout of the bridge are briefly introduced, and the conditions which should be taken into account at the initial design stage of the bridge are surveyed For the safety assessment of the bridge design, ship navigation simulations, such as RTS( real time simulation) and FTS(fast time simulation), are carried out, the results of which are statistically analysed to estimate the probability of collision between the ship and the pier of the bridge.

Structural evaluation of all-GFRP cable-stayed footbridge after 20 years of service life

  • Gorski, Piotr;Stankiewicz, Beata;Tatara, Marcin
    • Steel and Composite Structures
    • /
    • v.29 no.4
    • /
    • pp.527-544
    • /
    • 2018
  • The paper presents the study on a change in modal parameters and structural stiffness of cable-stayed Fiberline Bridge made entirely of Glass Fiber Reinforced Polymer (GFRP) composite used for 20 years in the fjord area of Kolding, Denmark. Due to this specific location the bridge structure was subjected to natural aging in harsh environmental conditions. The flexural properties of the pultruded GFRP profiles acquired from the analyzed footbridge in 1997 and 2012 were determined through three-point bending tests. It was found that the Young's modulus increased by approximately 9%. Moreover, the influence of the temperature on the storage and loss modulus of GFRP material acquired from the Fiberline Bridge was studied by the dynamic mechanical analysis. The good thermal stability in potential real temperatures was found. The natural vibration frequencies and mode shapes of the bridge for its original state were evaluated through the application of the Finite Element (FE) method. The initial FE model was created using the real geometrical and material data obtained from both the design data and flexural test results performed in 1997 for the intact composite GFRP material. Full scale experimental investigations of the free-decay response under human jumping for the experimental state were carried out applying accelerometers. Seven natural frequencies, corresponding mode shapes and damping ratios were identified. The numerical and experimental results were compared. Based on the difference in the fundamental natural frequency it was again confirmed that the structural stiffness of the bridge increased by about 9% after 20 years of service life. Data collected from this study were used to validate the assumed FE model. It can be concluded that the updated FE model accurately reproduces the dynamic behavior of the bridge and can be used as a proper baseline model for the long-term monitoring to evaluate the overall structural response under service loads. The obtained results provided a relevant data for the structural health monitoring of all-GFRP bridge.

Behavior of a steel bridge with large caisson foundations under earthquake and tsunami actions

  • Kang, Lan;Ge, Hanbin;Magoshi, Kazuya;Nonaka, Tetsuya
    • Steel and Composite Structures
    • /
    • v.31 no.6
    • /
    • pp.575-589
    • /
    • 2019
  • The main focus of this study is to numerically investigate the influence of strong earthquake and tsunami-induced wave impact on the response and behavior of a cable-stayed steel bridge with large caisson foundations, by assuming that the earthquake and the tsunami come from the same fault motion. For this purpose, a series of numerical simulations were carried out. First of all, the tsunami-induced flow speed, direction and tsunami height were determined by conducting a two-dimensional (2D) tsunami propagation analysis in a large area, and then these parameters obtained from tsunami propagation analysis were employed in a detailed three-dimensional (3D) fluid analysis to obtain tsunami-induced wave impact force. Furthermore, a fiber model, which is commonly used in the seismic analysis of steel bridge structures, was adopted considering material and geometric nonlinearity. The residual stresses induced by the earthquake were applied into the numerical model during the following finite element analysis as the initial stress state, in which the acquired tsunami forces were input to a whole bridge system. Based on the analytical results, it can be seen that the foundation sliding was not observed although the caisson foundation came floating slightly, and the damage arising during the earthquake did not expand when the tsunami-induced wave impact is applied to the steel bridge. It is concluded that the influence of tsunami-induced wave force is relatively small for such steel bridge with large caisson foundations. Besides, a numerical procedure is proposed for quantitatively estimating the accumulative damage induced by the earthquake and the tsunami in the whole bridge system with large caisson foundations.