• Title/Summary/Keyword: Breaker Failure

Search Result 61, Processing Time 0.03 seconds

A Study on Leakage Current Detecting System for Automatic Waterer Using Livestock Barn (축산용 자동급수기의 누전감지시스템에 관한 연구)

  • Kim, Doo-Hyun;Kim, Sung-Chul;Yoo, Sang-Ok;Kim, Sang-Ryull;Kim, Yoon-Bok
    • Journal of the Korean Society of Safety
    • /
    • v.26 no.4
    • /
    • pp.34-40
    • /
    • 2011
  • This paper is purposed to develop an leakage current detecting system(LCDS) which can prevent electrical fires on breaker capacity expansion as well as ruptures of XL(Extra long) pipelines and power failure by operation of ELB(Earth leakage breaker) at auto water machine in winter. In order to develop LCDS, this paper studied field state investigation, field state experiment, development of leakage alarm system and verification experiments. Field states investigation at livestock companies(10 companies) in cheong-won location to deduce the problems of auto water machine is analyzed. The field state experiment is conducted at B livestock company in cheong won location. The field state experiment method is measured with leakage current when ELB tripped by environment factor(fine, cloudy, and rainy day). The LCDS is developed as MCU(Micro Control Unit) part applied leakage current values at B livestock company. Verification experiments for the leakage current detecting system were conducted by two methods of current supply and field test. Results show that LCDS suggested in this paper are valuable and usable in auto water machine based on environment factor, which will prevent severe damage to human beings and properties and reduce the electrical fires in livestock.

Development of DC Arc Generator to protect against Malfunctions and Fires caused by Arcing (아크 발생에 따른 고장 및 화재를 보호하기 위한 직류 아크 Generator 개발)

  • Yoon, Yongho
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.21 no.6
    • /
    • pp.123-128
    • /
    • 2021
  • As the spread of DC power distribution systems increases, the occurrence of failures and fire accidents are also increasing. In particular, the ESS fire accident, which is a component of the smart grid, and the fire accident of the solar power system, which is a direct current system, are caused by problems in the electrical connection between system components as the supply of new and renewable energy rapidly increases and old facilities increase. An arc that can cause a direct fire by releasing the induced light and heat has been pointed out as one of the causes of fire. Therefore, the problem of such an arc defect is that it is impossible to block an arc accident in advance with the existing overcurrent circuit breaker and earth leakage circuit breaker. In this paper, we intend to develop a test equipment that satisfies international standardization and to develop a DC arc generator to protect against failure and fire caused by arcing.

Analysis of Electrical Accident for Outlet Circuit of Laboratory on ETA (ETA를 통한 연구실험실 콘센트회로의 전기재해 분석)

  • Kim, Doo-Hyun;Kim, Sung-Chul;Park, Jong-Young;Kim, Sang-Chul
    • Journal of the Korean Society of Safety
    • /
    • v.32 no.2
    • /
    • pp.27-33
    • /
    • 2017
  • This study is intended to identify issues on the basis of investigating the actual state of laboratory environment and outlet circuit, and derive end states by expressing sequences from the initiating event of disaster to accident in leakage current, poor contact and overload through ETA(event tree analysis). To this end, this study investigated the actual state of electric equipment of laboratory at universities in all parts of country. And it is shown that most of them are failure in electric work and user negligence in the investigation of actual state. It is found that there is earth fault and defect in wire diameter in the failure of electric work and the problem of partial disconnection due to wire bundling and poor contact in user negligence. Outlet-related component, failure rate and initiating events are composed of a total of 41 initiating events, i.e., 30 internal initiating events and 11 external initiating events. And end states are composed of a total of 15 parts, i.e., 3 electric power parts and 12 safety parts. Earthing class 3 is the most important safety device against leakage current (initiating event). And in case of poor contact, it is necessary for manager to check thoroughly because there is no safety device. In case of overload/overcurrent, when high-capacity equipment is connected, a molded case circuit breaker, safety device, worked. However, in most cases, it is verified that this doesn't work. This study can be utilized as electric equipment safety guide for laboratory safety manager and managers.

Design and Development of Distorted Source Device for Circuit Breakers Failure Analysis (차단기류 오동작 분석을 위한 전원왜형장치 설계 및 개발)

  • Lee, Sang-Ick;Yoo, Jae-Geun;Park, Jong-Chan;Choe, Gyu-Ha
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.11 no.5
    • /
    • pp.480-488
    • /
    • 2006
  • Up to recently the harmonic generation has deteriorated the quality of electricity and affected the performance on the electrical installation including OA, FA, IT devices and so on. Some studies of harmonic affects in diagnosis and the cause of accident has not done by the experimental data of harmonic source but merely by presumption according to qualitative analysis. So, in order to research the harmonic affect on the electrical installation according to quantitative analysis and gather reliable data over and over again, it is necessary to develop an AC power source which is capable of generating some harmonics. In this paper, we described about realization of AC power source which can produce and compose harmonics for the analysis of accident due to harmonics.

A Study on the Safety Assessment and Damage Pattern of Water Purifier Compressors (정수기용 압축기의 안전성 평가 및 소손 패턴 분석에 관한 연구)

  • Choi, Chung-Seog
    • Journal of the Korean Society of Safety
    • /
    • v.28 no.2
    • /
    • pp.21-25
    • /
    • 2013
  • The purpose of this study is to provide basic data for the safety assessment of a water purifier when water leaks due to inappropriate maintenance and the examination of the cause of accidents related to the leak. Due to its inspection and management by non-specialists, if a leak occurs in a water purifier with the water level controller being inclined, it may result in the failure of the compressor, power supply line, PCB, etc. The analysis of the thermal diffusion pattern of water purifier compressors using a thermal image camera shows that its maximum temperature was approximately $80^{\circ}C$. In addition, its operating current was a maximum of 13 A and the system's operating current was approximately 1.7 A after the compressor was charged. It was found that the housing type power cable cover of the compressor had the effect of preventing electric shock but has poor flame resistance. Furthermore, the performance of the overload protector, PTC relays, etc., was excellent but they have potential for problems as metallic terminals were exposed, resulting in the potential of a safety related accident. The terminals and their surface damaged by the tracking showed a trace of carbonization and the resistance between terminals was measured to be approximately $8{\Omega}$. In addition, while the tracking was proceeding, the fuse and circuit breaker installed for system protection did not operate.

Performance verification on the Impedance Relay Method using Failure Simulator of AT Feeding System (AT 급전계통 고장 모의시험장치를 활용한 임피던스 계전방식의 성능검증)

  • Kim, Wan-il;Lee, Kye-Seung;Jung, No-Geon;Kim, Jae-Moon
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.67 no.2
    • /
    • pp.325-330
    • /
    • 2018
  • In this paper, we investigated the impedance method for searching fault detection point in case of an accident in the AC electric railway AT feeding system. For this purpose, simulation circuit modeling and prototype hardware are made based on the known numerical analysis. As a result of simulation modeling of the feeding system based on the numerical analysis of the impedance method confirmed that the modeling was properly implemented with an average error rate of 0.07%. Also, as a result of fault event by hardware simulator, it was confirmed that the breaker operation time is shortened and the fault current is decreased while the voltage is close to the supply voltage in the transient state as the point of the fault accident moves away from the substation(SS).

Reliability-Centered Maintenance Model for Maintenance of Electric Power Distribution System Equipment (배전계통 기기 유지보수를 위한 RCM 모델)

  • Moon, Jong-Fil;Shon, Jin-Geun
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.58 no.4
    • /
    • pp.410-415
    • /
    • 2009
  • With the implementation of electric power industry reform, the utilities are looking for effective ways to improve the economic efficiency. One area in particular, the equipment maintenance, is being scrutinized for reducing costs while keeping a reasonable level of the reliability in the overall system. Here the conventional RCM requires the tradeoff between the upfront maintenance costs and the potential costs of losing loads. In this paper we describe the issues related to applying so-called the "Reliability-centered Maintenance" (RCM) method in managing electric power distribution equipment. The RCM method is especially useful as it explicitly incorporates the cost-tradeoff of interest, i.e. the upfront maintenance costs and the potential interruption costs, in determining which equipment to be maintained and how often. In comparison, the "Time-based Maintenance" (TBM) method, the traditional method widely used, only takes the lifetime of equipment into consideration. In this paper, the modified Markov model for maintenance is developed. First, the existing Markov model for maintenance is explained and analyzed about transformer and circuit breaker, so on. Second, developed model is introduced and described. This model has two different points compared with existing model: TVFR and nonlinear customer interruption cost (CIC). That is, normal stage at the middle of bathtub curve has not CFR but the gradual increasing failure rate and the unit cost of CIC is increasing as the interruption time is increasing. The results of case studies represent the optimal maintenance interval to maintain the equipment with minimum costs. A numerical example is presented for illustration purposes.

The Effect of Regenerative Energy Storage System on Stabilization of Electro-Pneumatic Braking Blending (회생에너지 저장시스템이 제동 브랜딩 안정화에 미치는 영향)

  • Kim, Kyu-Joong;Lee, Keun-Oh
    • Journal of the Korean Society of Safety
    • /
    • v.25 no.5
    • /
    • pp.15-21
    • /
    • 2010
  • Regenerative Energy Storage System(ESS) is a system that saves regenerative energy which generated instantly in the regenerative braking of Electric Multiple Unit(EMU) and disappear, and reuse the stored energy when EMU is in powering. Such system related to a research field of renewable energy which emerged concerning climate change and high oil prices. In the case of existing domestic rolling stock, about 25% to 30% of generated regenerative energy is restored to power source and is regarded as direct factor of raising catenary voltage. Such rapid change of catenary voltage is a cause of the failure of EMU's electronic equipment and lowering its reliability and is also a cause of train's fault occurred by tripping circuit breaker. In this paper, we intend to investigate the effect on blending characteristics of electric-braking and pneumatic-braking whether the regenerative energy storage system is used or not in urban transit DC 1,500V feeding system, while trains run. And we also intend to investigate its effect on stabilization of the blending, fluctuation of catenary voltage and various electric equipments.

The Modernization of Automatic Control facilities of Hydro Power Plant (수력발전소 자동제어설비의 현대화)

  • Kwon, O-Geuk;Kwon, Young-June;Song, Young-Cheol
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.69-70
    • /
    • 2008
  • Automatic control systems(AVR, Governor, Synchronizer) installed $1970{\sim}1980$ in K-water were considered to be rehabilitated around 2000. Moreover, Korea Power Exchange market system was changed from PPA (Power Purchase Agreement) to a bidding system. Therefore, depending on the power quality, the power provider could achieve additional profits. It is the excitation system and governor that have the functions of enhancing power necessities. During the 20 to 30 years of generator operation, there were many major and minor problems. Examples are SCR burnout (Andong: Excitation system), hunting (Imha: governor), field circuit breaker failure (Chungju 1st: excitation system), the rise of leakage current (Chungju 2nd: excitation system), power supply burnout (Chungju 2nd: governor). These are the typical examples of malfunction which hindered the generator operation and, consequently, diminished the profit of power business. In order to satisfy the needs of the power market and prevent malfunctions mentioned above, the rehabilitation of AVRs and governors were executed. A new system was made to have the flexibility of ancillary service (GF, AGC, etc.), PSS function. With user friendly HMI software, it is more convenient for the operator to fulfill suitable maintenance. It was possible to connect SCADA system by opening protocol of AVR, governor for the efficiency of operation and maintenance.

  • PDF

A Study on Optimization of Electric Power Facilities Applied Matrix System at 25.8kV GIS (25.8kV급 GIS에 Matrix System을 적용한 전력설비 최적화 연구)

  • Lee, Yang-Mi;Nam, Jae-Woo;Kim, Chul-Hwan
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.66 no.3
    • /
    • pp.507-512
    • /
    • 2017
  • Recently, more electric power facilities have been miniaturized and it is noted that the facilities maintenance will be essential through operation optimization. In this paper we applied and examined the operation optimization of electric power facilities by applying Matrix system which can improve reliability to minimize outage and recover failure rapidly when blackouts happen at 25.8kV Gas Insulated Switchgear(GIS). The fundamental problem for facilities maintenance of GIS can happen due to indeterminable internal state in real time. Matrix optimization organizes action states in all containers which contain pressurized $SF_6$ Gas such as circuit breaker, disconnector switch, bus for utilizing them each area. Then, we connect it with power system to monitor and control internal state remotely in real time, and we can minimize blackout zone or outage. Considering above process, we improved stability of overall facilities.