• Title/Summary/Keyword: Breakdown & repair

Search Result 54, Processing Time 0.022 seconds

A Study on Forecasting the Repair Time Range of the Building Components in the Apartment Housing (공동주택 구성재의 예상수선시기 범위 설정 연구)

  • Lee Kang-Hee
    • Journal of the Korean housing association
    • /
    • v.17 no.2
    • /
    • pp.19-26
    • /
    • 2006
  • Building would be deteriorated with time elapse, influenced by its geographic situation, climate and other environmental conditions. In addition, the systematic maintenance could be provided to keep the resident a recent living condition. The existing breakdown maintenance will be changed into the preventive maintenance. The preventive maintenance is required to get the repair time, the repair scope and frequency. In this paper, it aimed at providing the repair time range over the building components, utilizing the relation between the determination curve and the performance recovery through repair. Results of this study are as follows : First, the forecast of the repair time over the building components could be calculated and equalized with the deterioration and performance degree. Second, the repair time range of building components would be provided into five categories and 3rd repair time. Results of this study will set up the long-term repair plan of building, and finally keep an housing condition comfortable.

Analysis of a Repair Time Preparation for the Preventive Maintenance in a Public Rental Housing Types (공공임대주택 유형별 구성재 사전예방보전 수선시기 설정연구)

  • Lee, Kang-Hee;Park, Guen-Soo;Chae, Chang-U
    • KIEAE Journal
    • /
    • v.12 no.5
    • /
    • pp.35-42
    • /
    • 2012
  • The rental housing has been a main role to supply a living space to the household who can not be available for the home-owner. Specially, the public rental housing is targeted for the low-income household and supplied with low rental fee. Therefore, the rent owner should manage and maintain the housing condition decently with a systematically maintenance plan which includes a repair time and scope, a repair cost. Among them, the repair time is important to make a repair plan. The repair time would be explained with two types, which is divided into a breakdown maintenance and a preventive maintenance. Each of them has a advantage in a repair cost, maintenance of the living condition and provision of the repair scope and method. In this paper, it aimed at providing the repair time in 12 components of the public rental housing which is reflected from a preventive maintenance. This study shows that overall, a permanent rental housing has a longer repair time than any other rental housing in 12 housing components. A public rental housing is closer to the a permanent rental housing then a redevelopment rental housing in repair time. On the other hand, the repair time of the 12 housing components is different form the rental housing. This leads to further study in difference of the repair time according to a tenant type.

Identification of Breakdown Structure for Infrastructure Maintenance, Repair, and Rehabilitation Technologies using Comparative Case Study (비교사례 연구를 통한 인프라 유지관리 기술 분류체계 도출)

  • Kim, Du Yon;Cha, Yongwoon;Park, Wonyoung;Park, Taeil
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.10
    • /
    • pp.248-258
    • /
    • 2020
  • This study proposed a breakdown structure for maintenance and management technologies under the concept of comprehensive asset management at the life cycle level of infrastructure based on benchmarking with other developed countries. For this purpose, a comparative case study was performed to review and analyze the existing definitions and hierarchies for infrastructure maintenance, repair, and rehabilitation (MR&R) systems under major industrialized countries and South Korea. In accordance with the ratio of maintenance costs to GDP, the U.S., U.K, and Japan were selected to review their systems. The classifications and definitions of MR&R technologies under the laws were analyzed. The result showed that most developed countries differentiate maintenance and repair from improvement and constitute a system centered on preventive maintenance activities. On the other hand, Korea's system for facility management is not definitely classified and still focused on reactive structures, which need to be improved. In this study, as proposed, a breakdown structure established the concept of Maintenance and Management, Maintenance & Repair, and Performance Improvement. Consequently, this study could be used as the basis for the implementation of preventive MR&R activities and reasonable resource allocations from an asset management point of view.

The Communication Repair Strategy Characteristics According to Communication Breakdown of Elderly Man With Alzheimer's Dementia (알츠하이머 치매 노인의 의사소통 단절에 따른 의사소통 회복전략 특성)

  • Kim, Sun-Young;Park, Hee-June
    • Therapeutic Science for Rehabilitation
    • /
    • v.8 no.4
    • /
    • pp.53-63
    • /
    • 2019
  • Objective : Many communication recovery strategies should be used when communication breakdowns occur for successful communication, however, communication problems increase due to inadequate use of such strategies in older people with dementia. The purpose of this study was to investigate the difference of recovery strategy between dementia and the elderly in conversational discourse. Method : The subjects were eight of Alzheimer's dementia and 10 general elderly. Conversation discourse tasks were conducted face-to-face with the subjects. Communication breakdown and communication recovery strategies were analyzed based on 200 utterances collected in the conversation discourse. Result : First, the AD group had more communication breakdown than the control group, but the recovery rate did not differ between the groups. Second, in the AD group, the nonspecific recovery strategy and the clarification demand strategy were used as the expression strategy. The recovery rate after using expressive strategy was more than 90% in explanation strategy, combined strategy, nonspecific repair strategy, and repetition confirmation strategy. The response strategy used a lot of paraphrase strategy and combined strategies, and the recovery rate after using the response strategy was 100% for the simplification strategy, repeat strategy and gesture strategy. Conclusion : The AD group showed more breakdown of research subjects and breakdown of researchers than control group, and it showed ability to use various expression strategy and response strategy though there was difference in repair rate between communication repair strategy. AD group used nonspecific repair strategy in expression strategy the most and paraphrase strategy in response strategy the most. This shows different characteristic from ordinary elderly people. Therefore, it is necessary to utilize this repair strategy for rehabilitation of AD elderly.

A Model of Work Breakdown Structure for being applied to Historical Data in BTL Project for Educational Facilities (교육시설 BTL 사업의 실적공사비 적용을 위한 작업분류체계(WBS) 구축)

  • Kim, Sung-Kyum;Cho, Chang-Yeon;Son, Jae-Ho;Kim, Jae-On
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.499-502
    • /
    • 2007
  • The government abolished the existing method to calculate the construction price by the quantity take-off and pricing. It has introduced a new estimating system which uses the actual cost data on the basis of actual contract unit price. However, in the case of the current method to calculate the estimate price of BTL educational facilities, it is difficult to prepare an accurate ground for calculating unit prices due to a lack of standardized work breakdown structure (WBS) and guidelines for the detailed bidding documents. Thus, this research aims to establish WBS using the actual construction price on the basis of the actual bidding documents for the previous construction of BTL educational facilities. This specific WBS can be differentiated from the general WBS which is not suited for construction of the educational facility. It makes possible to build the construction information classification system and it helps to systemize the maintenance and repair cost items.

  • PDF

A Study of the law-suit requesting the guarantee against defects in the Apartment Buildings (공동주택 하자보증금 청구소송의 연구)

  • Yoon, Hyung-In;Jo, Byung-Soo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.7 no.2 s.24
    • /
    • pp.67-76
    • /
    • 2007
  • The purpose of this study is to propose the efficient improvement in the lawsuit to request the guarantee against defect. This study points out several problems about related act and subordinate statue and judgement by analyzing the character of contract in apartment house, related laws and regulations, appraisals and judicial decisions. This study deduces the necessity of the establishment of the specification and the breakdown cost for repair and maintenance work to provide the standard for the detached judgement.

The Effects of Clarification Training in Barrier Game on Conversational Breakdowns and Repair Strategies of Children with ASD (장벽게임을 사용한 명료화 중재가 자폐범주성장애 아동의 대화단절 및 발화수정 전략에 미치는 효과)

  • Yoo, Ju-Hyun;Hong, Gyung-Hun
    • The Journal of the Korea Contents Association
    • /
    • v.18 no.6
    • /
    • pp.374-384
    • /
    • 2018
  • This study examined the effects of clarification training on conversational breakdowns and repair strategies of 3 school aged children with ASD. Clarification training provided to the participants during playing the barrier games. The results found that the occurrence of conversational breakdown was decreased in terms of overall and types. The occurrence and appropriateness rates of repair strategies were increased among all participants. Based on the results, 'clarification training' used in this study can be an effective method to train children with ASD for appropriate repair strategies in conversation.

Study on Reliability of Water Absorption Diagnosis through Precise Water Absorption Test

  • Kim, Hee-Soo;Bae, Yong-Chae;Kim, Hee-Dong
    • Journal of Electrical Engineering and Technology
    • /
    • v.7 no.5
    • /
    • pp.772-777
    • /
    • 2012
  • Accidents caused by water absorption in water-cooled generator stator windings often occur all over the world. The absorption into the insulator of the coolant, which is used to cool down the heat generated by stator windings during operation, leads to the deterioration of dielectric strength, and insulation breakdown. An insulation breakdown may cause not only an enormous economic loss but also a very serious grid accident that would compromise stable supply of electric power. More than 50 % of domestic generators have been in operation for more than 15 years, and water absorption tests performed on 50 water-cooled generator stator windings during a five-year planned preventive maintenance period beginning in 2006 identified water absorption problems in 10 of them, all of which required repair. Because the existing water absorption test detects this problem by utilizing stochastic methods after measuring the capacitances at the final positions of insulation breakdown, its accuracy is limited. This study demonstrates that water absorption can be more accurately diagnosed by utilizing method along with a more precise one.

Breakdown and Destruction Characteristics of the TTL IC by the Artificial Microwave (인위적인 전자파에 의한 TTL IC의 오동작 및 파괴 특성)

  • Hong, Joo-Il;Hwang, Sun-Mook;Huh, Chang-Su
    • Journal of the Korean Society of Safety
    • /
    • v.22 no.5
    • /
    • pp.27-32
    • /
    • 2007
  • We investigated the damage of the TTL ICs which manufactured five different technologies by artificial microwave. The artificial microwave was rated at a microwave output from 0 to 1000W, at a frequency of 2.45GHz. The microwave power was extracted into a standard rectangular waveguide(WR-340) and TTL ICs were located into the waveguide. TTL ICs were damaged two types. One is breakdown which means no physical damage is done to the system and after a reset the system is going back into function. The other is destruction which means a physical damage of the system so that the system will not recover without a hardware repair. TTL SN74S08N and SN74ALS08N devices get a breakdown and destruction occurred but TTL SN74LS08N, SN74AS08N and 74F08N devices get a destruction occurred. Also destructed TTL ICs were removed their surface and a chip conditions were analyzed by SEM. The SEM analysis of the damaged devices showed onchipwire and bondwire destruction like melting due to thermal effect. The tested results expect to be applied to the fundamental data which interprets the combination mechanism of the semiconductors from artificial microwave environment.

Analysis of the Breakdown repair time of the Building Components in Public Rental-Housing Types (공공임대주택 유형별 부재의 사후보전 수선시기 설정연구)

  • Lee, KangHee;Ahn, YoungHan;Chae, ChangU
    • KIEAE Journal
    • /
    • v.13 no.6
    • /
    • pp.129-136
    • /
    • 2013
  • The rental housing has played a key role to supply a decent living space for the low-income households. The owner of the rental housing should maintain and manage the building physical condition. On the other hand, rents should use the housing without any damage and pay a certain fare for the rent. A rent is classified into two types : private and public. The public rent is mainly to supply a living space for non-available home owner with a low-rent fare. Many of public rent are built and supplied by the public institution or local government. The supplier would take a responsibility to maintain the building and components, reflected by the maintenance plan and repair scope. In this paper, it aimed at providing the repair time in building components of the public rental housing such as lighting, electrical cable, paintings and etc.. The repair time is analyzed with three calculation methods which are solved by the probability and empirical approach. Results are as follows : First, the repair time of the electrical facilities are maintained with 11yr, 10yr and 7 in permanent, public and redevelopment rent respectively. The roof proof has a repair time with 14yr, 11yr and 8 in permanent, public and redevelopment rent housing respectively. Second, Most of the components has a prior length of the repair time in permanent, public and redevelopment rent sequently. There is a difference in repair time according to the rental types. Therefore, it would continue to research the difference in aspect of the living style, building physics, living consciousness and etc.