• Title/Summary/Keyword: Boundary line

Search Result 819, Processing Time 0.024 seconds

Correction of Signboard Distortion by Vertical Stroke Estimation

  • Lim, Jun Sik;Na, In Seop;Kim, Soo Hyung
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.7 no.9
    • /
    • pp.2312-2325
    • /
    • 2013
  • In this paper, we propose a preprocessing method that it is to correct the distortion of text area in Korean signboard images as a preprocessing step to improve character recognition. Distorted perspective in recognizing of Korean signboard text may cause of the low recognition rate. The proposed method consists of four main steps and eight sub-steps: main step consists of potential vertical components detection, vertical components detection, text-boundary estimation and distortion correction. First, potential vertical line components detection consists of four steps, including edge detection for each connected component, pixel distance normalization in the edge, dominant-point detection in the edge and removal of horizontal components. Second, vertical line components detection is composed of removal of diagonal components and extraction of vertical line components. Third, the outline estimation step is composed of the left and right boundary line detection. Finally, distortion of the text image is corrected by bilinear transformation based on the estimated outline. We compared the changes in recognition rates of OCR before and after applying the proposed algorithm. The recognition rate of the distortion corrected signboard images is 29.63% and 21.9% higher at the character and the text unit than those of the original images.

Tests of Land Boundary Using Orthoimages (정사영상을 이용한 토지경계설정 실험)

  • Lee, Young-Jin;Ryu, Su-Hyun;Kim, Ho-Young;Park, Jung-Hwan
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2010.04a
    • /
    • pp.289-290
    • /
    • 2010
  • Orthoimage, digital map, cadastral map, and areas and district were converted and overlaid so as to apply legal restrictions on boundaries set by a land object concept restriction line and to analyze boundaries formed by overlaying areas and districts and characteristics of restrictions. With the restriction lines made on the basis of orthoimage.

  • PDF

Boundary Line Analysis of Rice Yield Responses to Meteorological Conditions for Yield Prediction 1 . Boundary Line Analysis and Construction of Yield Prediction Model (최대경계선을 이용한 벼 수량의 기상반응분석과 수량 예측 1. 최대경계선 분석과 수량예측모형 구축)

  • 김창국;이변우;한원식
    • Proceedings of The Korean Society of Agricultural and Forest Meteorology Conference
    • /
    • 2001.06a
    • /
    • pp.109-112
    • /
    • 2001
  • 농작물의 생육 및 작황은 내적으로는 품종 자체의 고유 특성과 외적으로는 재배기술, 토양환경, 기상환경 등에 크게 영향을 받는다. 이중 온도, 일조시수 등의 기상조건은 생육과 수량 형성에 직접적인 영향을 미치게 되며 작물의 고유특성인 출수기, 수량구성요소 등도 기상환경에 따라 변이를 나타낸다.(중략)

  • PDF

Line segment grouping method for building roof detection in aerial images (항공영상에서 건물지붕 검출을 위한 선소의 그룹화 기법)

  • Ye, Cheol-Su;Im, Yeong-Jae;Yang, Yeong-Gyu
    • 한국지형공간정보학회:학술대회논문집
    • /
    • 2002.11a
    • /
    • pp.133-140
    • /
    • 2002
  • This paper presents a method for line segment grouping used for detection of various building roofs. First, by using edge preserving filtering. noise is eliminated and then images are segmented by watershed algorithm, which preserves location of edge pixels. To extract line segments between control points from boundary of each region, we calculate curvature of each pixel on the boundary and then find the control points. Line linking is performed according to direction and length of line segments and finally the location of line segments is adjusted using gradient magnitudes of all pixels of the line segment. The algorithm has been applied to aerial imagery and the results show accurate building roof detection.

  • PDF

A Study on Delay Time and Capacitance Calculation for Interconnection Line in Multi-Dielectric Layer (다층 유전체에서의 Interconnection Line에 대한 커패시턴스와 지연시간 계산 방법에 관한 연구)

  • 김한구;곽계달
    • Journal of the Korean Institute of Telematics and Electronics A
    • /
    • v.29A no.9
    • /
    • pp.46-55
    • /
    • 1992
  • This paper propose how to calculate the capacitance for VLSI interconnection lines in multi-dielectric layer. The proposed method is a expansive form of 3-dimensional direct intergral method developed in single-dielectric layer. We took into consideration the effect of multi-dielectric layer by using additional boundary condition instead of modified Green's function. It is used the potential equations in line surface and the electric field equations in dielectric interface as the boundary condition. RC delay time for interconnection line of multi-dielectric layer is obtained from the calculated capacitance value. At this time, we are used Al and WSiS12T as interconnection materials.

  • PDF

Line-Source Scattering from Slant Strips

  • Ock, Jang-Soo;Eom, Hyo-Joon
    • Journal of electromagnetic engineering and science
    • /
    • v.9 no.4
    • /
    • pp.229-231
    • /
    • 2009
  • Electromagnetic scattering from slant strips excited by a line source is investigated. Boundary conditions are applied to obtain simultaneous equations for discrete modal coefficients. Computations are performed to illustrate the effects of line-source scattering on radiation patterns.

Calculating Mutual Impedance between Power-Line and Communication-Line with Earth Return Current (대지귀로 전류에 의한 전력선과 통신선의 상호임피던스 해석)

  • Lim, Yong-Hun;Hyun, Duck-Hwa
    • Proceedings of the KIEE Conference
    • /
    • 2003.11a
    • /
    • pp.269-271
    • /
    • 2003
  • A method for calculation of mutual inductance from the parallel power-line and earth conduct to communication-line is studied in the paper. The solution for the electromagnetic field produced by an overhead power-line is derived using Maxwell's equations and treating the as a boundary value problem. Total mutual inductance from direct current and image current to communication-line is used Carson's formula for infinitely long parallel conductors.

  • PDF

Efficient Link Aggregation in Delay-Bandwidth Sensitive Networks (지연과 대역폭이 민감한 망에서의 효율적인 링크 집단화 방법)

  • Kwon, So-Ra;Jeon, Chang-Ho
    • Journal of Internet Computing and Services
    • /
    • v.12 no.5
    • /
    • pp.11-19
    • /
    • 2011
  • In this paper, Service Boundary Line approximation method is proposed to improve the accuracy of aggregated link state information for source routing in transport networks that conduct hierarchical QoS routing. The proposed method is especially useful for aggregating links that have both delay and bandwidth as their QoS parameters. This method selects the main path weight in the network and transports the data to the external networks together with the aggregation information, reducing information distortion caused from the loss of some path weight during aggregation process. In this paper, the main path weight is defined as outlier. Service Boundary Line has 2k+5parameters. k is the number of outliers. The number of storage spaces of Service Boundary Line changes according to the number of outliers. Simulation results show that our approximation method requires a storage space that 1.5-2 times larger than those in other known techniques depending on outlier selection method, but its information accuracy of proposed method in the ratio between storage space and information accuracy is higher.

Perspective on Maritime Boundary Delimitation through Oil and Gas Development Dispute between China and Japan in the East China Sea (동중국해 중.일 유전 개발 분쟁을 통해 본 양국의 해양경계획정에 대한 입장 연구)

  • Yang, Hee-Cheol;Park, Seong-Wook;Park, Se-Hun
    • Ocean and Polar Research
    • /
    • v.28 no.2
    • /
    • pp.175-186
    • /
    • 2006
  • There are disputes for oil and gas development between China and Japan in the East China Sea. These involve the area where China is already carrying out activities of oil and gas development and where Japan is proclaiming its EEZ. China insists that the Chinese activities on oil and gas development area are being carried out within the Chinese jurisdictional waters even if the median line principle of Japanese proclamation is applied in delimitation. Indeed, the permit for Japanese development is causing disputes between China and Japan because its permit allows development in the waters adjacent to Chinese development area. h the event, the core of this dispute around the oil and gas field in the East China Sea relates to issues of maritime boundary delimitation and issues of resources acquisition with both states. Chinese policy on oil and gas development is to first consider development issues in accordance with a median line principle where waters toward to China from the median line should be developed by China and the area toward Japan from the median line within the Chinese continental shelf should be jointly developed. However, the Japanese position is that the East China Sea should be jointly developed, and Japan hopes to eventually convince China to accept its median line delimitation. With on-going development of such issues, Korea should establish a strategy of negotiation based on analyses of resource distributional conditions and other strategic factors in the Korean delimitation area. In particular, Korea should prepare and make the best use of joint development zone established in an agreement between the ROK and Japan concerning the development of the southern part of continental shelf adjacent to both states.

A numerical study of the influence of rock mass classes boundary on tunnel stability (암반 등급 경계가 터널 안정성에 미치는 영향에 관한 수치해석적 연구)

  • Kim, Gyeomyeon;Jung, Chanmook;Lee, Yongjun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.6
    • /
    • pp.825-835
    • /
    • 2019
  • When the tunnel is designed, the ground is classified into several grades and the corresponding support system is applied according to the support pattern table. However, a simple pattern application based on rock grade does not take into account the longitudinal stress transitions occurring at rock grade boundaries. In this study, three-dimensional numerical analysis was performed to estimate the stress change in the longitudinal rock grade change of NATM tunnel, and the influence zone of load transfer was investigated using the influence line and trend line. As a result, the downward change of rock grade in the direction of tunnel excavation occurs in the range of 0.35~0.7D from low-strength rock to high-strength rock around the grade change boundary. It is necessary to apply a downward pattern of about 1.0D to the safety direction in consideration of the influence range of 0.35D to 0.7D.