• Title/Summary/Keyword: Boring methods

Search Result 95, Processing Time 0.035 seconds

Effect of Strength Properties of In-Situ Concrete Pile in Embankment Slopes on Embankment Materials and Boring Methods (성토사면에 타설된 현장 콘크리트 말뚝의 강도특성에 미치는 성토재료 및 타설 방법에 대한 영향)

  • Hwang, Moo-Suk;Jeoung, Jae-Hoon;Park, Seung-Ki;Lee, Chang-Soo;Park, Chan-Gi
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.50 no.5
    • /
    • pp.73-81
    • /
    • 2008
  • This study evaluated the applicability of in-situ concrete pile as a stabilization materials of embankment slopes including agricultural reservoir and rural road etc. The experimental embankment slopes was constructed to investigate the strength properties of in-situ concrete pile with embankment materials and boring methods. The test variable were applied the boring method(driving and augering) and water-cement ratio. In order to analyze the physical and mechanical properties of embankment materials, permeability and water contents test were was performed. Also, the freshly and harden of in-situ concrete properties were measured by the slump and compressive strength tests. The results showed the water content and permeability of embankment materials and boring methods affected on compressive strength of in-situ concrete pile.

Observations of Boring Behaviour and the Drilling Mechanism of Lunatia fortunei (Gastropoda: Naticidae) in Western Korea

  • Chung, Ee-Yung;Kim, Sung-Han;Back, Yong-Hae
    • The Korean Journal of Malacology
    • /
    • v.27 no.3
    • /
    • pp.253-259
    • /
    • 2011
  • Boring behaviour and drilling mechanism were investigated by visual observations. In this study, of two kinds of holes (the outer and inner holes) which are formed by drilling of boring gastropod Lunatia fortunei (Naticidae), the diameters of the outer holes are broader and larger than those of the inner holes, and their holes look like the crater in shape, as seen in all valves of bivalves bored by Naticidae species. Two kinds of glands (the accessory boring gland and accessory salivary gland) on the foots of boring gastropods have been investigated. Of them, it has been confirmed that only the accessory salivary glands on the foots secreted sulphuric (acidic) components in the mucus (secretion), while the accessory boring glands on the foots did not secrete their components. In this study, we confirmed that L. fortunei possess the accessory boring gland on the foot, as seen in most species in Naticidae. Accoeding to the results of the experiment of the blue litmus paper tests of the mucus (secretions) secreted from the accessory boring gland the color of the blue litmus paper did not turn red in color because chemical components of mucus (secretion) secreted from the accessory boring gland on the foot of L. fortunei (boring gastropod) were not acidic components. It is supposed that the mucus, which is secreted from the accessory boring gland, contained gelatin-like substances or enzymes without acidic components, as already reported in Naticidae species. Therefore, these substances may be involved in softening the surface of the valves of M. veneriformis. Consequently, it is assumed thar L. fortunei bores holes through the shells of molluscs by means of following 3 methods: (1) a softening of the calcareous shells of M. veneriformis with chemical secretions (including gellatin-like substances or enzyme except for acidic components) from the accessory boring glands, (2) mechanical rasping with the radula, (3) a combination of both. In this study, particularly, acidic components, which are involved in softening the surface of the shells, are not associated with the boring mechanism of L. fortunei because chemical acidic components were not detected in the mucus (secretion), as found in Naticidae species.

Development of Environment-Friendly Demolition Methods of RC Pier (콘크리트 교각의 친환경적 해체공법 개발)

  • Lee, Chang-Soo;Kwon, Jae-Ken;Chung, Bong-Jo;Kim, Tae-Hwan
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.8 no.4
    • /
    • pp.97-105
    • /
    • 2004
  • As modern society has been progressed, the demolition method of concrete structure that satisfy the condition of safety, economic efficiency, and environment-friendliness is required. This study investigated problems of existing demolition methods and developed modified method minimizing cooling water and sludge for demolition job. It was also verified the validity of this method based on the finite element methods. A analysis parameters as a number, depth and size of boring, and self weight were introduced for this study, and gave optimal condition for the demolition job and analysis.

Development of a GUI Program for the Design of a Vibration Control Boring Bar with a Tube-Type Structure (튜브 타입 제진용 보링바 구조설계를 위한 GUI 프로그램 개발)

  • Guo, Yang-Yang;Park, Jong-Kweon;Hong, Jun-Hee;Song, Doo-Sang
    • Journal of the Korean Society of Manufacturing Technology Engineers
    • /
    • v.25 no.4
    • /
    • pp.295-300
    • /
    • 2016
  • In the design of passive and active boring bars, the structural dimensions and shape of the vibration control boring bar are modified depending on the diameter and depth of the workpiece, which changes the dynamic behavior. Thus, the natural frequency, effective mass, and stiffness for the main structure of a tube-type boring bar need to be reset for each vibration control case. However, commercial finite element method (FEM) software and experimental modal analysis are mostly used at present despite being too time-consuming. To overcome the weaknesses of the two methods currently used for vibration control, we realized a graphical user interface (GUI) program for the modal analysis of a modified tube-type damping structure. The analysis results with the GUI program were compared to those with commercial FEM software in order to confirm the effectiveness of the former.

Design and Application of Subsurface Drainage Devices for Multipurpose Farmland

  • Jeon, Jong Gil;Choi, Yong Hun;Kim, Min Young;Kim, Young Gjin
    • Journal of Biosystems Engineering
    • /
    • v.42 no.4
    • /
    • pp.265-275
    • /
    • 2017
  • Purpose: This study aims to identify the most stable boring shape among the circle, square, and inverted-triangle types in order to be applied to the development of a tractor-pulled underdrain boring device. Methods: The underdrain boring devices designed with the circle, inverted triangle, and square types were analyzed by numerical analysis, and they were evaluated by soil moisture and underground water level in the test field. Results: The results of the numerical analysis indicated that the increases in displacement, and strain when a uniform load is placed on the surface soil with soil weight were in the order of the inverted-triangle type, square type, and circle type. The soil moisture content and the underground water level after rainfall showed the largest difference in the order of the circle type, square type, and inverted-triangle type, indicating that the circle type had the largest drainage effects after rainfall. Conclusions: The overall findings of this study show that the circle type is the most stable among the circle, square, and inverted-triangle types.

Several models for tunnel boring machine performance prediction based on machine learning

  • Mahmoodzadeh, Arsalan;Nejati, Hamid Reza;Ibrahim, Hawkar Hashim;Ali, Hunar Farid Hama;Mohammed, Adil Hussein;Rashidi, Shima;Majeed, Mohammed Kamal
    • Geomechanics and Engineering
    • /
    • v.30 no.1
    • /
    • pp.75-91
    • /
    • 2022
  • This paper aims to show how to use several Machine Learning (ML) methods to estimate the TBM penetration rate systematically (TBM-PR). To this end, 1125 datasets including uniaxial compressive strength (UCS), Brazilian tensile strength (BTS), punch slope index (PSI), distance between the planes of weakness (DPW), orientation of discontinuities (alpha angle-α), rock fracture class (RFC), and actual/measured TBM-PRs were established. To evaluate the ML methods' ability to perform, the 5-fold cross-validation was taken into consideration. Eventually, comparing the ML outcomes and the TBM monitoring data indicated that the ML methods have a very good potential ability in the prediction of TBM-PR. However, the long short-term memory model with a correlation coefficient of 0.9932 and a route mean square error of 2.68E-6 outperformed the remaining six ML algorithms. The backward selection method showed that PSI and RFC were more and less significant parameters on the TBM-PR compared to the others.

A Case Study on Penetrating Hard Rock with Alternative Methods of Shield TBM for Weathered Layer in Subway Construction (지하철공사에서 풍화대용 쉴드 TBM의 경암 구간 굴진 시 대체공법에 대한 사례연구)

  • Park, Hyung-Keun;Ko, Won Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.6D
    • /
    • pp.623-629
    • /
    • 2010
  • Recently, the Shield TBM (Tunnel Boring Machine) construction method is used gradually to increase at the Tunnel Constructin site. However the design and application of the Shield TBM were carried out without sufficient investigation of the ground conditions in the construction site. Due to insufficient understanding to the corresponding equipment is frequently occurring unexpected construction cost and extension of a construction period. The most suitable alternative construction method was determined by analyzing tunneling rate, duration, construction cost of shield machine and tunneling data of alternative method. The result of the case study is suggested as follows. First, the accurate soil exploration on the construction site should be preceded to prevent from tunneling stoppage and schedule delay. Second, the most suitable selection of the shield machine to the ground conditions of the construction site should be executed based on the investigation. Third, the best alternative method for boring of hard rock section is 'hard rock blasting after open cut and cover method'.

Comparison of the RMR Ratings by Tunnel Face Mappings and Horizontal Pre-borings at the Fault Zone in a Tunnel (터널 단층대에서 수평시추와 막장관찰에 의한 RMR값의 비교 분석)

  • Kim Chee-Hwan
    • Tunnel and Underground Space
    • /
    • v.15 no.1 s.54
    • /
    • pp.39-46
    • /
    • 2005
  • The RMR ratings, one by horizontal pre-boring in a tunnel and another by tunnel face mapping, are compared at the fault zone in a tunnel. Generally. the horizontal pre-borings were so effective as to forecast reasonably the supporting patterns after tunnel excavation. But the maximum difference in RMR ratings estimated by two methods was about 50 at a certain section of a tunnel. The differences were analyzed on each parameter of the RMR system: the rating differences were 24 in the condition of discontinuities, 15 in the RQD and 13 in the uniaxial compressive strength of rock. To minimize the gap between RMR by pre-borings and by face mappings, it is necessary to select the horizontal pre-boring location where tunnel stability could be critical and to evaluate in detail the sub-parameters of the condition of discontinuities.

Electrical resistivity tomography survey for prediction of anomaly in mechanized tunneling

  • Lee, Kang-Hyun;Park, Jin-Ho;Park, Jeongjun;Lee, In-Mo;Lee, Seok-Won
    • Geomechanics and Engineering
    • /
    • v.19 no.1
    • /
    • pp.93-104
    • /
    • 2019
  • Anomalies and/or fractured grounds not detected by the surface geophysical and geological survey performed during design stage may cause significant problems during tunnel excavation. Many studies on prediction methods of the ground condition ahead of the tunnel face have been conducted and applied in tunneling construction sites, such as tunnel seismic profiling and probe drilling. However, most such applications have focused on the drill and blast tunneling method. Few studies have been conducted for mechanized tunneling because of the limitation in the available space to perform prediction tests. This study aims to predict the ground condition ahead of the tunnel face in TBM tunneling by using an electrical resistivity tomography survey. It compared the characteristics of each electrode array and performed an investigation on in-situ tunnel boring machine TBM construction site environments. Numerical simulations for each electrode array were performed, to determine the proper electrode array to predict anomalies ahead of the tunnel face. The results showed that the modified dipole-dipole array is, compared to other arrays, the best for predicting the location and condition of an anomaly. As the borehole becomes longer, the measured data increase accordingly. Therefore, longer boreholes allow a more accurate prediction of the location and status of anomalies and complex grounds.

A STUDY ON THE SAFETY ANALYSIS OF ROCK FILL DAM (1) (필댐의 안정성 해석 연구 (1))

  • HoWoongShon;DaeKeunLee
    • Journal of the Korean Geophysical Society
    • /
    • v.6 no.3
    • /
    • pp.165-177
    • /
    • 2003
  • The purpose of this paper is to analyze the behavior and to study the safety evaluation of the Unmun Dam located in Cheongdo-Gun of GyeongBuk Province, Korea. For this purpose, soil analyses including boring data, geophysical surveys were conducted. In this paper, especially many geophysical methods were adopted to configure out the subsurface situation of dam. Applied geophysical methods were: 1) electric resistivity survey, 2) high frequency magnetotelluric (HFMT) survey, 3) ground penetrating radar (GPR) survey, 4) seismic refraction survey, 5) seismic cross-hole tomography survey, and 6) high frequency impedance (ZHF) survey. Each of geophysical surveys were analyzed and joint analyses between geophysical surveys were also performed to deduce the more reliable subsurface information of Dam by using the features and characteristics of each geophysical survey. Since many defects, such as gravel and weathered rock blocks in the dam core, and lots of amounts of leakage, by boring analyses were found, reinforcement by compaction grouting system (CGS) has been conducted in some range of dam. Some geophysical data and data of geotechnical gauges were also used to confirm the effects of reinforcement. Electric resistivity, EM, GPR, ZHF, seismic refraction and seismic tomography surveys show that left side of dam is weak, which means the possibility of existence of gravel, rock block, water and cavities in the core of dam. This result coincides with the boring data. Especially, electric survey after reinforcement shows that even the right side of the dam has been deformed by the strong pressure during the reinforcement itself. As a conclusion, some problems in the dam found. Especially, the dam near spillway shows the high possibility of leakage. It should be pointed out that only the left side of he dam has not a leakage problem. As a whole, the dam has problems of weakness, because of unsatisfactory construction. It is strongly recommended that highly intensive monitoring is required.

  • PDF