• 제목/요약/키워드: Block pavement construction

검색결과 22건 처리시간 0.022초

스톤 블럭을 이용한 보.차도 포장의 적용성 평가 (A Study on Evaluation of Sidewalk / Roadway Pavement Using Stone Block)

  • 윤원섭;김종국;박상준;조철현;채영수
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2008년도 춘계 학술발표회 초청강연 및 논문집
    • /
    • pp.259-266
    • /
    • 2008
  • Recently, the maintenance period of sidewalk pavement proposed in Ministry of Construction & Transportation to be extended by more than 10 years. Therefore it takes many interests in Durability and the maintenance. Beside sidewalk pavement, block pavement happened problems in parking and road less than 20km/hr about bearing capacity and durability, the maintenance. It interests about importance of environmentally friendly sidewalk pavement. It compared engineering characteristics about strength and durability through general pavement comparison with stone block pavement. It estimate bearing capacity in actual si-tu site and test site. It experimented plate bearing test and field density test. It verified about durability of pavement by construction availability of geosynthetics that is constructed by purpose of filter. Stone block pavement evaluated about application of sidewalk/road pavement on the basis of result.

  • PDF

조경용 투수성 블록 포장의 열환경 특성 (Thermal Environment Characteristics of Permeable Block Pavements for Landscape Construction)

  • 한승호;류남형;강진형
    • 한국조경학회지
    • /
    • 제34권2호
    • /
    • pp.18-25
    • /
    • 2006
  • This study aims to measure and to analyze the thermal environment characteristics of the various permeable pavement materials such as grass pavement (GREEN BLOCK PARK), stone and grass pavement (GREEN BLOCK STEP), stone pavement (GREEN BLOCK MOSAIC) and wood pavement (WOOD BLOCK) under the summer outdoor environment. The thermal environment characteristics measured in the study includes the changes of surface temperature during the day, changes of the temperature on each pavement layer, and long and short wave radiation of each pavement surface. The experimental condition is based on the data on the hottest temperature (August 5, 2005, $34.0^{\circ}C$) of the you. Some of main findings are: 1) The heat environment was worse on the wood pavements than on the stone pavement. This is mainly due to the low albedo of the wood pavements (0.37) while the albedo value of stone pavements is 0.41. Small heat capacity of the wood pavements also contributes to this difference. 2) The heat environment was worse on the stone pavements than on the turf pavements. This was mainly due to the evapotranspiration of the plant growth layer of the turf pavements. 3) The peak surface temperature was the highest on the wood pavements ($56.1^{\circ}C$). The peak surface temperatures on the stone pavements, the stone-grass pavements and the grass pavements were $43.1^{\circ}C,\;40.1^{\circ}C\;and\;37.9^{\circ}C$, respectively. 4) To improve the thermal environments in the urban area, it is recommended to raise the albedo of the pavements by brightening the surface color of the pavement materials. Further studies on the pavement materials and the construction methods which can enhance the continuous evapotranspiration from the pavements surface are needed.

아파트 단지 내 블록포장의 종류와 공간유형에 따른 하자분석 (Defect Analysis According to the Types and Spatial Type of Block Pavement in Apartment Complex)

  • 박근혜;정성관;장철규
    • 한국환경복원기술학회지
    • /
    • 제23권3호
    • /
    • pp.91-104
    • /
    • 2020
  • This study was conducted to analyze the characteristics of defects according to the type of block and spatial type by quantitatively examining defects occurring in block pavement in apartment complex. According to the research results, depending on the type of block, defects have occurred 1,394.3ea/100㎡ in interlocking paver blocks, 464.8ea/100㎡ in clay brick paver blocks, and 235.1ea/100㎡ in shot blasted paver blocks. By space type, the defects were occurred 1,576.0ea/100㎡ on the access road paved by interlocking paver blocks and the defects were found 1,139.6ea/100㎡ in interlocking paver blocks, 235.1ea/100㎡ in shot blasted paver blocks, and 797.1ea/100㎡ in clay brick paver blocks, on the sidewalk. Also the defects are occurred 455.6ea/100㎡ on the resting space and 403.2ea/100㎡ on the gym space paved by clay brick paver blocks. Through the size analysis of the defects in the block paver, in the case 'peeling', the largest volume of 2,539.0㎣ on the sidewalk paved with shot blasted paver blocks, and 'Subsidence' occurred at the widest area of 2,096.0㎠ on the sidewalk where interlocking paver block was constructed. The difference in defect occurrence according to the type of block is considered to be influenced by the block production process, and the space type is considered to be caused the difference in the occurrence of defects according to the cause of construction and the usage pattern of residents. This study conducted a survey on defects in block and analyzed the defect characteristic according to paver material and space type. Base on this, it is judged that it can be used as an efficient basic data for material replacement, improvement, paver planning and construction in the future.

보도용 블록포장 유지보수 공사 원가산정기준 개정 연구 (A Study on the Revision of the Cost accountingfor Sidewalk Block Pavement Maintenance and Repair Work)

  • 오재훈;안방율
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 봄 학술논문 발표대회
    • /
    • pp.271-272
    • /
    • 2021
  • The maintenance and repair work of sidewalk block pavement is a construction that requires a large amount of budget to be invested every year. It is important to establish an appropriate standards for estimating construction cost to ensure proper budgeting and quality. In this study, the standards for estimating the cost of maintenance and construction work for sidewalk blocks that can be applied to the construction volume classified according to the site conditions, construction type, and equipment use differentiated from new construction was established. As a result, the daily construction volume was presented by reflecting excavator and truck as equipment in the combination of paver and common worker. The re-installation was applied by separating the construction volume of sections with general blocks and induction/raised blocks based on the installation of sidewalk blocks after demolition. Generally if block cutting is necessary, the precision construction conditions using a cutting machine were taken into consideration to secure the construction quality. In addition, it has been revised to apply classified construction volume into A and B-Type depending on the park and site conditions.

  • PDF

차도포장용 투수블록의 재료특성 및 투수성능 평가 (Evaluation of Field Permeability and Material Characteristics of Permeable Block for Roadway Pavement)

  • 박대근;정원경;정두원;백종은;이진욱
    • Ecology and Resilient Infrastructure
    • /
    • 제3권2호
    • /
    • pp.110-116
    • /
    • 2016
  • 급속한 산업화가 진행되면서 건물과 인공 포장된 도로의 급격한 증가하고 있다. 이로 인한 도심 집중강우에 따른 도로침수, 포장체 파손 등이 발생하고 있다. 이에 대한 해결책으로 도심지 내 투수성 포장의 필요성이 대두되고 있다. 본 연구는 투수블록의 차도포장 적용 가능성 현장 평가를 하기 위하여 공용기간 동안 차도용 투수블록의 투수성능을 평가하였다. 평가결과 줄눈재 및 받침안전층은 품질관리기준을 만족하였으며 휨강도는 1개소만이 5.29 MPa로 기준을 만족하였다. 실내투수지속성시험의 결과는 4개 제품중 1등급 1개, 2등급 1개, 3등급 2개로 평가되었으며 현장투수 및 현장 침투능은 각 제품의 9개월 간의 추적 조사 결과 1개 제품을 제외한 모든 제품에서 0.1 mm/s 이상의 품질기준을 만족하였다.

조경용 투수성 블록포장의 열특성 (Thermal Characteristics of Permeable Block Pavements for Landscape Construction)

  • 한승호;류남형;윤용한;김원태;강진형
    • 한국환경과학회지
    • /
    • 제17권5호
    • /
    • pp.573-580
    • /
    • 2008
  • This study aims to measure and to analyze the characteristics of thermal environment of the various permeable pavement materials such as a break stone pavement (Green block cubic), soil protection pavement (Soil tector), soil cement pavement and ceramic brick pavement under the summer outdoor environment. The thermal environment characteristics measured in the study includes the changes of surface temperature during the day, and long and short wave radiation of each pavement surface. The experimental condition is based on the data on the hottest temperature (August 9, 2006, $37.1^{\circ}C$) of the year. The albedo was the highest on the break stone pavement(0.8) from 12:00 to 14:00. The albedo of the ceramic brick pavement, a soil tector pavement and soil cement pavement were 0.35, 0.29 and 0.27 from 12:00 to 14:00, respectively. The peak surface temperature and long wave radiation was the highest on the soil protection pavements($56.6^{\circ}C$/627 W/$m^2$). The peak surface temperatures and long wave radiation on the ceramic brick pavement, a stone brick pavement and soil cement pavement were $51.7^{\circ}C$/627 W/$m^2$, $48.8^{\circ}C$/607 W/$m^2$ and $45.9^{\circ}C$/582 W/$m^2$, respectively. The heat environment was better on the break stone pavement than on the other pavements. This is mainly due to the high albedo of the break stone pavement(0.8) while the albedo value of a ceramic brick pavement, a soil tactor pavement and soil cement pavement were 0.35. 0.29 and 0.27. Large heat capacity($2,629kJ/m^3{\cdot}K$) of the stone brick pavements also contributes to this difference. The heat environment was better on the soil cement pavement than the soil tector pavement. This is mainly due to the evaporation of the soil cement pavement while the active evaporation of the soil tactor pavement was not continued after two days from the rainfall event. To improve the thermal environments in the urban area, it is recommended to raise the albedo of the pavements by brightening the surface color of the pavement materials. Further studies on the pavement materials and the construction methods which can enhance the continuous evapotranspiration from the pavements surface are needed.

잔디주차장 시공을 위한 잔디블록 활용방안 (Practical Use of Vegetated Porous Pavement for the Construction of Grass Parking Lot)

  • 한승호;강진형;최준수;양근모;윤용한;구태익;김원태
    • 한국환경과학회지
    • /
    • 제18권9호
    • /
    • pp.1011-1015
    • /
    • 2009
  • The vegetated porous pavement can be installed as an alternative way to replace the traditional pavement, which contributes less to the water circulation system in the urban area. This study aims to an investigation based on the shadow and pressure of the vehicle system, where the turfgrass get grown and the green block get constructed on the grassy parking lot. This study might achieve these conclusions, in the case of use 'green block' makes grass parking lot, plant a kind of 'zenith' and takes sod thickness 40 mm are more efficient for turfgrass growth in the early times. In the case of parking over 8 hours in a day, after 5 weeks turfgrass growth would come into reduce. So over 4 hours parking and after 9 weeks, we need consider to setting up green block in grassy parking lot. The grassy ground would get pressured by the vehicles' load and it would bring into some damage due to the load after 3 weeks. So we should put the grass's growth root point under the designed a top of 'green block' level. When the vehicle amounts and parking density is in a low level, it could be an environmentally friendly product.

혼합정수계획법을 활용한 도로포장 보수구간 선정 최적화 연구 (Optimal Road Maintenance Section Selection Using Mixed Integer Programming)

  • 조건영;임희종
    • 한국도로학회논문집
    • /
    • 제19권3호
    • /
    • pp.65-70
    • /
    • 2017
  • PURPOSES : Pavement Management System contains the data that describe the condition of the road. Under limited budget, the data can be utilized for efficient plans. The objective of this research is to develop a mixed integer program model that maximizes remaining durable years (or Lane-Kilometer-Years) in road maintenance planning. METHODS : An optimization model based on a mixed integer program is developed. The model selects a cluster of sectors that are adjacent to each other according to the road condition. The model also considers constraints required by the Seoul Metropolitan Facilities Management Corporation. They select two lanes at most not to block the traffic and limit the number of sectors for one-time construction to finish the work in given time. We incorporate variable cost constraints. As the model selects more sectors, the unit cost of the construction becomes smaller. The optimal choice of the number of sectors is implemented using piecewise linear constraints. RESULTS : Data (SPI) collected from Pavement Management System managed by Seoul Metropolitan City are fed into the model. Based on the data and the model, the optimal maintenance plans are established. Some of the optimal plans cannot be generated directly in existing heuristic approach or by human intuition. CONCLUSIONS:The mathematical model using actual data generates the optimal maintenance plans.

포장재료의 심리적 특성 분석 (Psychological Character Analysis of Pavement Materials)

  • 김대현
    • 한국조경학회지
    • /
    • 제32권5호
    • /
    • pp.43-51
    • /
    • 2004
  • Recently, the importance of choosing correct pavement materials has been increasing in urban spaces and streets. Much research regarding the pavement theory and construction method have been conducted, but analysis in terms of human psychological character has not yet been performed. The purpose of this study is to investigate the psychological characters to 12 pavement materials, that are commonly used in our urban spaces and streets. The results of the psychological character for each pavement material can be summarized as follows: 1. The psychological characters to each pavement material were as follows: ① Clay embodies a natural, traditional, soft and intimate psychological character; ② Pebble stone has a natural, hard, cool and intimate psychological character; ③ Turf grass incorporates an intimate and soft psychological character; ④ Ceramic brick has an artificial and hard psychological character; ⑤ Tile pavement has a modern, artificial, hard and cool psychological character; ⑥ Water permeable concrete has a modern and artificial psychological character; ⑦ Flag stone has a natural psychological character; ⑧ Granite has a modern and artificial psychological character; ⑨ Portland concrete has an artificial and hard psychological character; ⑩ Small compacted brick has an artificial, dynamic and modern psychological character; ⑪ Wood block pavement has a natural and traditional psychological character; ⑫ Asphalt concrete pavement has a modern, hard and artificial character. 2. On the results of the cluster analysis regarding psychological indexes for 12 pavement materials, pavement materials were categorized in 3 clusters. Among them, one cluster was mainly used as the most popular pavement material in our urban spaces and streets. From this point of view, psychological character for pavement material in our urban spaces and streets was not as various as we expected. 3. In conclusion, the proper selection of pavement materials was very important and the factors affecting the human psychological character should be considered in the design of urban spaces and streets.

단지내 도로포장별 생애주기 비용 분석(LCCA) 사례 연구 (A Case Study of Life Cycle Cost Analysis on Pavements in Apartment Complex)

  • 정종석;박용부;손정락
    • 토지주택연구
    • /
    • 제5권4호
    • /
    • pp.297-303
    • /
    • 2014
  • 최근, 공동주택 단지내 투수성 포장 및 블록포장 등과 같은 포장이 많이 시공되고 있으나 품질관리와 공용성 평가에 관한 기준이 미비하여 하자 교체 및 교체주기 시기 결정 등에 어려움이 많은 실정이다. 따라서, 본 연구에서는 공동주택에 많이 적용되고 있는 투수성포장 및 블록 포장의 합리적 선정기준을 제안하기 위해 교체주기, 초기 공사비, 유지교체비용 등을 고려한 포장공법별 생애주기 비용 분석(LCCA)을 실시하였다. 생애주기비용 분석결과는 교체주기 20년이상인 인터록킹 콘크리트 블록포장이 최적의 대안이지만, 보도 포장의 교체기준 10년을 기준으로 하였을 경우 최적의 대안은 일반적인 아스팔트 콘크리트 포장임을 알 수가 있다. 따라서, 교체주기가 대안의 선정 및 생애주기비용 분석에 많은 영향을 미치므로 향후, 교체주기의 객관적인 정량화에 필수적인 공용성 지수 개발이 필요하다.