• 제목/요약/키워드: Blasting vibration velocity

검색결과 127건 처리시간 0.022초

건설 현장에서 안전성 향상을 위한 지반진동.소음.비산먼지 측정자료의 분석에 관한 연구 -영남지역의 퇴적암.화성암층에서의 발파 및 항타작업을 중심으로- (A Study on Data Analysis of Ground Vibration.Noise Dust Dispersion Measurement for Enhancing Safety at the Construction Sites - Focussed on Blasting and Piling in Sedimentary and Igneous Rocks in the Youngnam Area -)

  • 안명석;류창하;박종남
    • 화약ㆍ발파
    • /
    • 제19권3호
    • /
    • pp.91-104
    • /
    • 2001
  • As in Korean environments with mountainous and hilly areas, the rock generally has to be removed in construction or civil engineering work in tunnelling or excavation for development in urban area. Explosives should be used for blasting, which may cause serious problems on local people for their claim for compensation due to ground vibration, noise. For safe and economic blasting, geology and engineering characteristics of rocks such as discontinuities of rock or weathering are very important factors, together with site characteristics for prediction of ground vibration. In this study, conducted were the detailed study for major rocks most widely distributed in the South-east area, in-situ geological survey, geological and geochemical analysis, and further laboratory uniaxial rock stress, seismic velocity of core samples together with in-situ seismic velocity measurements. Regulations on ground vibration and noise were reviewed for assessing their adaptabilities, and a total of 4,856 measured blasting vibration data were examined for enhancing the confidence level in estimating the predictive formulation using scaled distance statistically.

  • PDF

터널 발파에서의 저폭속폭약과 일반폭약의 혼용장약법 (The Mixed Charging Method with Low-velocity Explosives and Normal Explosives in Tunnel Blasting)

  • 강대우;안봉도
    • 터널과지하공간
    • /
    • 제20권4호
    • /
    • pp.252-259
    • /
    • 2010
  • 도심지 터널 즉 터널의 상부 근접한 거리에 보안물건이 존재하는 경우 일반적인 폭약만을 사용해서는 발파진동을 규제치내에서 조절이 불가능하여 폭약공법이 아닌 무진동, 미진동 공법을 사용해야 한다. 하지만 무진동 공법들은 터널굴착공사비가 크게 증가 하게 되며, 또 공사기간도 길어진다. 일반적으로 노천채굴에서는 폭속이 약2,000 m/s 정도인 저폭속폭약이 응용 사용되어 왔으나 터널발파에는 사용되지 않았다. 본 연구에서는 저폭속폭약을 일반 폭약과 공내에서 혼용장약하여 발파작업을 한 결과 일반 폭약으로 발파하는 것보다 진동이 25~30%정도가 감소하였다. 도심지터널 및 보안물건 근접한 터널에서는 진동규제치내에서 미진동으로 시공할 수 있는 저폭속폭약과 일반폭약을 혼용 사용하는 발파 방법을 사용하는 것이 효과적인 것으로 나타났다.

발파진동속도와 진동레벨과의 관계식 연구 (A Study on the Related Equation of the Blast Vibration Velocity and the Vibration Level)

  • 김일중;기경철;조영동
    • 화약ㆍ발파
    • /
    • 제27권1호
    • /
    • pp.79-87
    • /
    • 2009
  • 발파진동속도(PVS, PPV, $V_V$)와 진동레벨과의 관계식을 산출하기 위해서 동일한 위치에서 동시에 측정한 진동속도와 진동레벨의 자료를 회귀분석 하였다. 회귀분석결과 발파진동속도와 진동레벨과의 상관관계는 좋았다. 이 연구결과 진동레벨과 진동속도와의 관계식들은 환경진동의 평가 및 관리에 유용하게 적용할 수 있을 것으로 판단된다.

공내 매질이 구조물의 발파이격거리에 미치는 영향에 관한 연구 (A Study on the Effect of the Stemming Hole medium to the Blasting Separation Distance of Structure)

  • 강희섭;정중규;방명석
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제21권1호
    • /
    • pp.100-108
    • /
    • 2017
  • 최근에 도시화와 산업화 및 교통망의 지속적인 확보로 인하여 발파공사를 시행하는 공사장이 증가하고 있다. 발파공사는 주변 주민들의 주거환경과 인접시설물들의 안전에 큰 영향을 미치므로 이에 대한 대책이 필요하다. 본 연구에서는 발파피해를 줄이기 위한 방법 중에서 발파공내의 발파메커니즘을 규명하고 개선하였다. 일반적인 공법에서 발생하는 천공경과 폭약경 사이의 차이로 인한 공간에서 디커플링효과를 규명하고, 이 공간의 매질을 변화시킴으로서 발파 시 진동발생의 규모를 규명하였다. 발파시험은 도로, 철도, 산업단지에서 실시하고, 발파진동을 측정하였다. 측정된 진동속도를 회귀분석하여 발파진동추정식을 산정하고 이를 이용하여 이격거리를 산정하였다. 공내 매질이 공기보다는 물처럼 비중이 큰 경우에 충격력은 크나 폭발 지연시간이 짧아 진동전달거리가 작아 이격거리를 크게 확보할 수 있다.

노천굴발파의 진동특성과 입지상수 결정에 관한 연구 (On the Vibration Characteristics and Determination of Site Constants for Surface Blasting)

  • 양형식;주재성
    • 화약ㆍ발파
    • /
    • 제8권4호
    • /
    • pp.23-29
    • /
    • 1990
  • Some surface blasting vibration was measured to determine site constants and vibration frequency was analyzed. The results are summarized as follows; 1) Design method to predict particle velocities was introduced using the logarithmic normal distribution characteristics of peak particle velocities. 2) Scaled distance diagram to determine limiting charge was presented. 3) Line fitness between particle velocity and scaled distance didn't depend on dominant component of vibration. Prevail fitness was in the order of transverese, peak, vertical and radial component. 4) Dominant component of particle velocity didn't related to drilling direction. Frequency was lowered as distance enlarged. Duration time of vibration was shortened as charge decreased.

  • PDF

발파진동의 크기가 양생콘크리트의 강도와 물성에 미치는 영향 (Effects of Blasting Vibrations on Strength and Physical Properties of Curing Concrete)

  • 박근순
    • 화약ㆍ발파
    • /
    • 제16권4호
    • /
    • pp.18-28
    • /
    • 1998
  • Effects of blasting vibrations on curing concrete have not been well studied. As a result, unreasonable and strong blasting vibration constraints have been placed on blasting when it occur in the vicinity of curing concrete. To study the effects of blasting on curing concrete blocks of $33.3{\times}27.7{\times}16.2cm$ were molded and placed on the quarry. Several sets of concrete blocks were subjected separately to peak vibrations of 0.25, 0.5, 1.0, 5.0 and 10cm/sec. The impulses of blasting vibrations were applied with thirty-minute intervals. Along with unvibrated concrete blocks, the vibrated concrete samples cored with 60.3mm in diameter were measured for elastic moduli, sonic velocity and uniaxial compressive strength. Test results can be summarized as follows; 1. The blasting vibrations between 6 and 8 hours after pour generally lowered on the uniaxial compressive strength of the concrete. 2. A low blasting vibration of 0.25cm/sec did not affect the uniaxial compressive strength. As the magnitude of the blasting vibration increases, compressive strength of concrete is decreased. 3. Physical properties of the P-wave velocity, Young’s modulus, and Poisson's ratio showed a weakly decreasing trend in the concrete blocks vibrated between 6 and 8 hours after pour.

  • PDF

발파진동이 양생 콘크리트의 물성에 미치는 영향 (Effects of Blasting Vibrations of Physical Properties of Curing Concrete)

  • 정동호
    • 자연, 터널 그리고 지하공간
    • /
    • 제1권1호
    • /
    • pp.81-87
    • /
    • 1999
  • Effects of blasting vibrations on curing concrete have not been well studied. As a result, unrealistic and costly blasting vibration constraints have been placed on blasting when it occurs in the vicinity of curing concrete. To study the effects of blasting, concrete blocks of $30\times20\times20cm$ were molded and placed on the quarry Different sets of concrete blocks were subjected to peak vibrations of 0.25, 0.5, 1.0, 5.0, and 10cm/sec. The impulses of blasting vibrations were applied at thirty minutes intervals . Along with unvibrated concrete blocks, the vibrated concrete samples with 60.3mm in diameters were measured for elastic moduli, sonic velocity and uniaxial compressive strength. Test results can be summarized as follows : 1) The blasting vibrations between 6 and 8 hours after pour generally have exerted bad influences on the uniaxial compressive strength of the concrete 2) Under low vibration of 0.25cm/sec variations of the uniaxial compressive strength were not shown. As the magnitudes of blasting vibration increased, compressive strength of concrete decreased. But under the vibrations between 5 and 10cm/sec decreases in strength were almost same. 3) Physical properties of the p-wave velocity, Young's modulus, and Poisson's ratio appeared to decrease for the concrete blocks subjected to vibration for 6 to 8 hours.

  • PDF

인공발파진동실험을 이용한 흙댐 축조재료의 전단파속도 산정 (Estimation of Shear Wave Velocity of Earth Dam Materials Using Artificial Blasting Vibration Test)

  • 하익수;김남룡;임정열
    • 대한토목학회논문집
    • /
    • 제33권2호
    • /
    • pp.619-629
    • /
    • 2013
  • 본 연구의 목적은 인공 발파진동실험을 이용하여 흙댐 축조재료의 전단파속도를 추정하고 산정 방법의 실효성을 확인하는 것이다. 이를 위하여 운영 중인 성덕댐에 대하여 국내 최초로 실대규모 근접 발파진동 실험을 수행하였다. 장약량과 발파 시추공심도를 4가지 유형으로 달리한 발파진동을 유발시키고, 각 유형별 발파 시에 폭원에 인접한 기반암노두와 댐 정상부에서 가속도를 각각 계측하였다. 발파진동실험으로부터 댐 정상부에서 얻어진 계측기록을 주파수 분석하여 대상댐의 고유진동수를 산정하고, 계측된 가속도기록으로 산정한 고유진동수와 기반암에서 계측한 발파파 가속도를 입력하중으로 한 반복적인 동적수치해석을 수행하여 계산한 고유진동수를 일치시키는 방법으로, 흙댐 성토재료의 심도별 전단파속도를 추정하였다. 산정된 대상댐 성토재료의 전단파속도는 발파유형에 영향을 받지 않고 일관성 있는 결과를 산정함을 확인하였고, 기존의 경험적 연구결과와 비교하여 그 실효성도 확인하였다. 이로부터 지진계가 설치되지 않아 실지진 계측기록을 이용할 수 없는 중소규모 댐의 경우, 인접발파에 따른 발파진동계측기록에 대한 분석으로도 댐 축조재료의 전단파속도를 실효성 있게 추정할 수 있음을 확인하였다.

수중발파로 인한 과압 및 진동 전파에서 메쉬크기의 영향에 대한 수치해석 연구 (Numerical Study on Effect of Mesh Size on Vibration and Overpressure Propagation Induced by Underwater Blasting)

  • 정호영;손한암;김수한;김열우
    • 터널과지하공간
    • /
    • 제31권6호
    • /
    • pp.578-592
    • /
    • 2021
  • 본 연구에서는 수중발파에서 발생하는 과압, 충격량, 진동의 전파 특성을 평가하기 위하여 수행되었다. 육상에서의 발파와 비교하여 수중발파에서의 소음 및 진동의 전파 특성은 주로 물을 매개체로 하여 전파되는 차이를 가지고 있으며, 경우에 따라 다양한 매질(암반, 물, 공기 등)을 통과하면서 전파양상이 변화하는 특성도 지니고 있다. 본 연구에서는 AUTODYN을 이용하여 수중에서의 발파과정을 모사하고 발파로부터 생성된 과압, 충격량, 발파진동의 전파 특성에 대하여 분석하였다. 특히 메쉬크기가 수중발파해석으로부터 획득되는 과압, 충격량, 최대입자속도에 미치는 영향을 중점적으로 평가하였다. 전체적으로 과압과 최대입자속도는 메쉬의 크기가 증가함에 따라 감소하는 경향성을 나타내었고, 충격량은 메쉬의 크기와 함께 증가하는 경향을 보였다. 또한 본 연구의 결과로부터 메쉬 크기에 대한 의존성은 장약량과 환산거리에 따라서도 다르게 나타날 수 있다는 것을 확인하였다.

광산 발파 시 인근지역에 미치는 발파영향에 대한 환경적 접근 (Environmental Approach to Blasting Effect on the Surrounding Area when the Mine Blasting)

  • 정병훈;이승호
    • 한국지반환경공학회 논문집
    • /
    • 제16권12호
    • /
    • pp.5-12
    • /
    • 2015
  • 발파소음은 충격음이기 때문에 인체에 갑작스런 충격을 주며, 발파진동과 같은 경우에는 지반을 따라 진동이 이동하여 인근 주변의 노화된 건물, 가축과 인체에도 큰 피해를 끼칠 수 있다. 본 연구에서는 광산 굴착 시 발생하는 발파영향이 인근지역에 미치는 영향에 대하여 분석하였다. 연구대상 지역의 지반현황을 파악하기 위해 지질조사, 현장시험과 실내시험 등의 지반조사를 수행하였다. 발파진동소음에 대해서는 국내 외 적용사례와 각 기관별 허용기준을 비교하여 현장조건에 가장 적합한 기준을 설정하였다. 발파영향을 검토하기 위해 발파진동 추정 식은 현장에서 시험발파를 수행하여 측정된 발파진동 값을 활용하였다. 발파진동 추정 식을 활용한 영향원의 검토는 발파지점을 보안물건(농장, 민가 등)으로부터 최단거리로 정하여 보안물건에 미치는 영향을 검토하였다. 또한 3차원 수치해석을 수행하여 발파진동 영향검토를 수행하였다. 3차원 수치해석은 동적 발파하중에 대한 구조물의 거동을 해석하기 위해 시간이력해석을 수행하였으며, 3방향에 대한 발파진동 값을 구하였다. 시험발파에 따른 발파진동 추정 식을 이용한 발파진동 영향원 검토 결과와 발파영향에 대한 3차원 수치해석 값을 비교 분석한 결과, 유사한 결과 수치를 확인하였다.