아프가니스탄 케심-파이자베드간 도로복구사업 해외설계 사례 (Overseas Design Introduction of Road Rehabilitation Project in Keshim~Faizabad, Afghanistan)

  • 정동호;김우선;김기백;정원준;이승우
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2008년도 추계 학술발표회
    • /
    • pp.569-580
    • /
    • 2008
  • If slope height was more than 20 meters, we conducted an analysis of stereographic projection and limit equilibrium at this slope. We proposed reduction of slope face angle and reinforcement of rock bolt depending on analysis. Blasting design : Standard pattern based on result of local test blasting was made for blasting design. Vibration criterion was set for less than 3.0mm/s because of outworn buildings and inhabitants opinions. Production blasting and Controlled blasting has been done as Construction standard pattern. After Vibration Monitoring has been done, so that we can control of complement. "Bidding Document" and AASHTO 2001 "A Policy on Geometric Design of Highways and Streets" were so for design criteria of earthwork but they were different actual design criteria and left something to be desired in Afghanistan. Therefore, although "Bidding Document" and "AASHTO 2001" were basic design criteria, domestic design criteria was reflected in this design criteria for complement by discussion with supervisor. Drainage design : For stability ratio, ditch of arch block and stonework was designed by rainfall data for the 13 years and discussion with supervisor. Pavement was designed as flexible pavement. Because these days in Afghanistan postwar repair works, especially urgent repairing of roads and newly making of roads, are very highly in progress, I think that Afghanistan is the region about which our construction technical experts should have great concerns.

  • PDF

터널굴착에서 다단식 발파기에 의한 전단면 발파의 적용성 연구 (Application of Full-Face Round by Sequential Blasting Machine in Tunnel Excavation)

  • 조영동;이상은;임한욱
    • 터널과지하공간
    • /
    • 제4권2호
    • /
    • pp.132-143
    • /
    • 1994
  • Many methods and techniques to reduce ground vibrations are well known. Some of them are to adopt electric millisecond detonators with a sequential blasting machine or an initiating system with an adequate number of delay intervals. The types of electric detonators manufactured in korea include instantaneous, decisecond and millisecond delays but numbers of delay intervals are only limited from No.1 to No.20 respectively. It is not sufficient to control accurately millisecond time with these detonators in tunnel excavation. Sequential fire time refers to adding an external time delay to a detonators norminal firing time to obtain sequential initiation and it is determined by sequential timer setting. To reduce the vibration level, sequential blasting machine(S.B.M) with decisecond detonators was adopted. A total of 134 blasts was recorede at various sites. Blast-to-structure distances ranged from 20.3 to 42.0 meter, where charge weight varied from 0.24 to 0.75 kg per delay. The results can be summarized as follow: 1. The effects of sequential blasting machine on the vibration level are discussed. The vibration level by S.B.M are decreased approximately 14.38~18.05% compare to level of conventional blasting and cycle time per round can be saved. 2. The empirical equations of particle velocity were obtained in S.B.M and conventional blasting. V=K(D/W1/3)-n, where the values for n and k are estimated to be 1.665 to 1.710 and 93.59 to 137 respectively. 3. The growth of cracks due to vibrations are found but the level fall to within allowable value.

  • PDF

지하공간 BIM 기반 발파진동 영향 시각화 기술 (BIM-based visualization technology for blasting in Underground Space)

  • 서명배;최수미;오성종;김성욱;신정훈
    • 스마트미디어저널
    • /
    • 제12권11호
    • /
    • pp.67-76
    • /
    • 2023
  • 본 논문에서는 도심지 지하 발파에 대한 영향 분석을 효율적으로 하기 위해 터널 굴착 시 발파영향에 대해 계측데이터와 연계하여 3차원 BIM 모델 데이터를 작성한 후 인프라 전체의 상호 영향을 고려한 시각화 방안을 제안한다. 이를 위해 시각화에 필요한 BIM 모델링 수준을 정의하였고 GTX-A구간 대상으로 진동계측 데이터 수집, 지형 및 구조물 BIM 작성, 발파진동추정식을 활용한 계측데이터 시각화 방식을 개발하였다. 발파영향원 시각화를 위해 구 형태의 발파영향원 라이브러를 개발하였고 Revit Dynamo 자동화 로직 연동이 가능한 제원표를 구성하였으며 이를 통해 발파진동 영향분석을 3차원으로 쉽게 시각화 하는 방안을 제시하였다. 텍스트 중심의 발파진동 영향분석을 3D로 시각화된 입체적인 방식으로 검토할 수 있어 발파진동 설계 및 민원대응에 용이할 것으로 판단된다.

암반 경계표면의 진동속도 (Vibration Velocity of Rock Mass Boundary Surface)

  • 김일중;김영석
    • 화약ㆍ발파
    • /
    • 제15권4호
    • /
    • pp.11-17
    • /
    • 1997
  • Impulsive vibration velocity is monitored at the surface and the boundary surface of rocks as various impulsive forces of horizontal and vertical directions were given to rocks which had difference in uniaxial compressive strength for investigate to the vibration velocity of rocks according to the impulsive direction and the monitoring site. The vibration velocity of the boundary surface of rocks was about 2.9 times or much larger than that of the surface at the same scaled distance in the case of horizontal impulsive forces, and was above 4.2 times in the case of vertical impulsive forces. The attenuation exponents of the vibration velocity equations in the surface and the boundary surface of rocks make a vast difference with the impulsive directions, but is makes little difference in the case of the same impulsive direction. The ratio of vibration constants of the surface to the boundary surface of rocks is that square and cube root scaled equation is a range of 2.7∼3.0 and 4.9∼5.0 respectively in the case of horizontal impulsive forces, and is a range of 4.2∼5.7 and 7.7∼11.5 respectively in the case of vertical impulsive forces.

  • PDF

진동 지반다짐 공법에 대한 장기간 진동계측 사례 (Vibration monitoring at Vibrating Compaction Works for Ground Improvement)

  • 김덕영;김선웅
    • 화약ㆍ발파
    • /
    • 제33권2호
    • /
    • pp.40-43
    • /
    • 2015
  • 본 연구에서는 싱가폴 창이 국제공항 신규 터미널(5번) 확장 지반 보강공사에 적용된 진동다짐공법을 소개하고 이에 따라 발생되는 진동을 장기간 실시간으로 측정하기 위하여 최적의 진동 분석 S/W 개발을 완료하였다. 아울러 이와 유사한 파일항타 작업 진동이나, 방파제 설계를 위한 주기적 반복적으로 발생하는 파도에 의한 진동이나 초고층 건물, 터널, 교량 등 대형구조물에서 발생하는 진동을 장시간에 걸쳐 실시간으로 측정이 가능함을 알아보고자 하였다.

Plasma파암 실험토론회 (The discussion on the Plasma blasting Experimentation)

  • 박철화
    • 화약ㆍ발파
    • /
    • 제16권3호
    • /
    • pp.35-48
    • /
    • 1998
  • 지난 3월 27일 코롱건설(주) 회의실에서 그간 (주)수상중공업에서 새로 개발한 Plasma파암장비에 대한 수차에 걸친 실험결과를 가지고 개발자인 제환영 박사, 개발 DATA에 대한 분석을 맡았던 한국자원연구소 유창하 박사, 실험시 Plasma 파암의 파종별 식별 및 유사 기종과의 비교 등을 검토한 바 있는 허전박사, 그리고 Plasma 암비를 가지고 처음부터 끝까지 현장실험을 맏아 본 박철화 화학비관이기사(전문건설(주) 차장) 등 토론회에서 발표한 내용이다.

  • PDF

비전기 뇌관의 발파와 기본 설계 및 시공 (Blasting Utilizing Non-electric Detonator and Its Principle Planning and Operation)

  • 최영천
    • 화약ㆍ발파
    • /
    • 제22권4호
    • /
    • pp.23-29
    • /
    • 2004
  • 비전기 뇌관은 전기뇌관의 단점을 보완하기 위하여 개발한 뇌관이다. 외부전기로 인한 기폭위험으로부터 전기뇌관보다 더욱 안전한 뇌관으로 각광을 받고 있으며. 또한 정밀한 시차, 발파진동, 소음의 감소효과와 노천 및 터널 발파에서 다량발파에 이용되고 있는 비전기 뇌관의 기폭시스템 및 기본적인 사용방법과 설계 및 시공사례를 소개함으로써 국내발파 기술향상에 도움이 되고자 한다.

지하 관 시설물과 인접한 소규모 단면 터널의 발파굴착 사례 (Blast Excavation of Small Diameter Tunnel near Underground pipe lines)

  • 원연호;김강규
    • 화약ㆍ발파
    • /
    • 제28권1호
    • /
    • pp.40-54
    • /
    • 2010
  • 메사쉴드공법은 주로 풍화토 또는 풍화암 구간의 소규모 굴착단면에 적용되며 대부분 인력굴착으로 이루어지나 막장면에 암반이 노출되면 유압력을 이용한 할암공법이나 발파공법의 적용이 불가피하다. 본 연구에서는 메사쉴드공법이 적용된 소규모 굴착단면 터널에서 터널상부에 상수도관 및 가스관 등이 근접되고, 강도가 높은 암반 노출로 인해 할암공법 대신에 125g의 최소장약량으로 심발공에서 초기진동을 제어하는 발파공법을 소규모 굴착단면 터널에 적용한 사례이다.

유한요소법을 이용한 구조물의 발파해체 붕괴거동 및 지반진동 모사에 관한 연구 (Simulation of Blasting Demolition of Reinforced Concrete Structures and Ground Vibration using Finite Element Method)

  • 최주희;정재웅;전석원
    • 터널과지하공간
    • /
    • 제19권3호
    • /
    • pp.190-202
    • /
    • 2009
  • 발파해체는 다른 해체방법과는 달리 실패에 따라 발생할 수 있는 인적 물적 자원의 손실이 매우 크기 때문에, 이를 사전에 예측 방지 할 수 있는 수치해석을 이용한 시뮬레이션 개발이 필수적이라 할 수 있다. 본 연구에서는 기둥 보 접합부의 특성구현 및 철근과 콘크리트의 강도 구현 등에 관하여 유한 요소법에 바탕을 둔 상용코드인 LS-DYNA를 이용하여, 실제 발파대상 구조물이 가지고 있는 복잡한 철근 배근을 단순화하여 고려하는 기법을 제안 하였으며, 또한 본 연구에서 제안한 기법을 이용하여 축소모형 실험 및 실제 구조물의 발파해체의 모사를 통해 검증하였다.

다변량 통계기법을 이용한 K및 n의 산정에 관한 연구 (A Study on the Estimation of Coefficients K and n Using Multivariate Data Analysis)

  • 백용진;최재성;배동명;김경진
    • 한국소음진동공학회논문집
    • /
    • 제13권8호
    • /
    • pp.583-590
    • /
    • 2003
  • For the preestimate of the vibration level of the ground next to a dwelling, a multivariate statistical analysis on the experiment data acquired from a variety of construction sites was performed, and then a new estimate model for the value of K and n that can be applied in the diagnosis of the damage was offered. The results maybe summarized as follows : First, the $K_{95}$ and n showed high correlation at P$\leq$0.05. Specially the correlation coefficient about $W_{max}$, S were higher in $K_{95}$ than in n. indicating that $K_{95}$ is generally associated with source conditions. Second, the factor analysis permitted to identify two major sources in each fraction. These sources accounted for at least 73 % of valiance of $K_{95}$. Third, the multiple regression model for the estimate of $K_{95}$ was developed from Fac1 which depend upon the source conditions and Fac2 which depend upon the transmission conditions. The n value is able to determine from the correlation relationship associated with $K_{95}$./.