• Title/Summary/Keyword: Bim

Search Result 1,471, Processing Time 0.028 seconds

Development of BIM Library for Civil Structures based on Standardized Drawings-Focused on 2D Standard Drawings of The MOLIT (표준도 기반의 토목구조물 BIM 라이브러리 개발 -국토교통부 표준도를 대상으로)

  • Moon, HyounSeok;Ju, KiBum
    • Korean Journal of Computational Design and Engineering
    • /
    • v.19 no.1
    • /
    • pp.80-90
    • /
    • 2014
  • In architecture projects, BIM library has widely been using for prefabrication of products and design process. However, since the shape of structures is different by each project in civil engineering projects and a shape representation system is complicated, it is not easy to develop a standardized BIM library. To solve these issues, this study develops BIM library based on standardized 2D shop drawings for civil structures. The standardized shop drawings, which are the targets of the BIM library model, should be first selected. Besides, in order to define modeling scope with the level of general and shop drawings for each structure, LOD(Level of Detail) and breakdown structure are determined, and development methods of families of 3D object type including 2D profile and rebar through commercial software are established. With these, properties of BIM library are configured, and a utilization model of the BIM libraries is constructed for 3D modeling and a simulation using the BIM library. Therefore, this study can identify properties that are necessary when IFC schema is configured for civil engineering projects. For future, it is expected that easiness of BIM design for the civil engineering projects and generation, management, and analysis system of BIM library for road projects will be secured.

Benefit-Cost Analysis of BIM Application - Case Study on Osong Test Line Railway - (철도인프라 BIM 적용에 따른 비용편익 효과 분석 - 오송 철도종합시험선로 사례를 중심으로 -)

  • Kim, Hwan-Yong;Shin, Min-Ho;Han, Sang-Cheon;Choi, Young-Woo;Kim, Chang-Ho
    • Journal of KIBIM
    • /
    • v.8 no.4
    • /
    • pp.41-48
    • /
    • 2018
  • Recent technological improvements have made abundant changes in construction industry. In specific, some technical applications, such as Building Information Modeling (BIM) opens up many possibilities. Some studies have articulated the use of BIM and its advantages in construction, but most of them are theoretical, not practical. This study is to provide an insight to such obstacles in BIM research. By investigating a real project that could utilize BIM in planning and construction phases, the authors try to investigate a possible outline of advantages in BIM implementation. The study area was set to a railway construction site in South Korea. The site covers a multiple railway tracks, stations, telecommunication facilities, infrastructure facilities, railway structures, and so numerous. In the site, the authors have identified 12 errors in 7 projects that could be prevented if BIM was utilized before the construction.

Improvement of Bill of Quantities of Door and Window Work for BIM-based Cost Estimation (BIM 기반 견적을 위한 창호공사 내역 작성체계 개선 방안)

  • Kim, Mi-Hyeon;Jo, Chan-Won;Yun, Seok-Heon
    • Journal of KIBIM
    • /
    • v.10 no.2
    • /
    • pp.12-20
    • /
    • 2020
  • Recently, interest in BIM technology has been growing in the domestic construction market as the number of construction projects requiring the application of BIM technology has increased. The use of BIM allows the use of various visualization functions through 3D models as well as drawing interference review, quantity calculation and integrated management of information. In particular, estimates of construction costs based on BIM can increase work efficiency by reducing the burden of calculating construction costs and managing them. In order to increase the efficiency of BIM-based cost estimates, it is necessary to improve the correlation between the BoQ(Bill of Quantity) information and the BIM model. For this purpose, the ratio of the amount and item to the detailed construction of the current BoQ was analyzed, especially the problem of the calculation of construction cost in the window work in this study. In addition, we would like to suggest a method for systematically linking the BoQ information with the BIM model by improving the BoQ information structure of the window work. It is expected that this will increase the efficiency of the quantity calculation and analysis work of construction cost of window work. In addition, it is expected that this method will help to analyze and predict changes in construction cost of windows and doors by facility characteristics and type.

Development of an Integrated IaaS+PaaS Environment for Providing Cloud Computing Service in a BIM Platform for Harbor Facilities (항만 BIM 플랫폼의 클라우드 서비스를 위한 IaaS+PaaS 통합 환경 개발)

  • Moon, Hyoun-Seok;Hyun, Keun-Ju;Kim, Won-Sik
    • Journal of KIBIM
    • /
    • v.9 no.4
    • /
    • pp.62-74
    • /
    • 2019
  • Because the existing BIM platform is based on user services, the focus is on the development of SaaS (Software as a Service), which provides business services online. However, since a harbor is a security facility, the harbor BIM platform is preferably provided in a private form, rather than relying on the infrastructure environment provided by external cloud providers. Therefore, this study analyzes and reviews the main functions to be provided as SaaS services of the harbor BIM platform. The goal is to build a cloud-based harbor BIM platform that can provide this service to users. To this end, we built IaaS (Infrastructure as a Service) environment of the harbor BIM platform based on the open source Open Stack and integrate and develop PaaS environment with Open Shift applied with IaaS. We applied the GPU to the harbor BIM platform to verify the performance of the harbor BIM platform, and found that the rendering and loading times are improved. In particular, it is expected to reduce the cost of introduction and provide it as the basic cloud environment of similar BIM platform for infrastructure facilities.

A case study of digital twin construction based on geospatial building information modeling (GeoBIM) - Focusing on the case of Jaeamcheon-gul and Jeonggusu-gul in Jeju Island - (지하공간건설정보모델링(GeoBIM) 기반의 디지털 트윈 구축사례에 관한 연구 - 제주도 재암천굴, 정구수굴 사례를 중심으로 -)

  • Lee, Jong-Hyun;An, Joon-Sang;Choi, Jae-Woong;Baek, Yong
    • Journal of KIBIM
    • /
    • v.11 no.4
    • /
    • pp.20-30
    • /
    • 2021
  • In the era of the 4th industrial revolution, smart construction is actively researched, in the domestic construction field, and one of the key elements in this field is Building Information Modeling(BIM). In Korea, smart construction is being implemented through BIM-based digitization and intelligence. The geotechnical engineering field should also prepare for the introduction of BIM. In this study, the concept and application status of GeoBIM were identified, and the direction of future research was presented. This study is a part of the study "Establishment of GeoBIM-based Digital Twin Maintenance System" in the current "Technology Development for Establishment of Jeju Ground Collapse Response System for Safe Road Operation". The subject and scope of the study is continuous excavation at caves located under roads in Jeju Island, and initial research is being conducted on Jaeamcheon-gul and Jeonggusu-gul. This study aims to build a digital twin through individual data construction and integration processes such as cave shape modeling using laser scanners, 3D stratum modeling using borehole information and geophysical exploration data, and modeling of surrounding conditions using drones.

Development of Automation Technology for Modeling of Railway Infrastructure using BIM Library (BIM 라이브러리를 활용한 철도 인프라의 모델링 자동화 기술 개발)

  • Kim, Yun-Ok;Moon, So-Yeong;Yoon, Hee-Taek;Park, Young-Kon;Kim, Ji-Young
    • Journal of KIBIM
    • /
    • v.12 no.3
    • /
    • pp.18-29
    • /
    • 2022
  • Recently, research on the application of BIM has continuously been active not only in architecture but also in civil engineering in order to improve work efficiency across the project's planning, design, construction and maintenance phases. However, the empirical applications of BIM targeting to civil engineering scope of construction sites still lags compared to architectural sized projects. This is because BIM tools are mainly based upon vertical structures of architecture, thereby most of them have difficulties and limitations to get utilized on horizontal structures of civil engineering. Therefore, this study intends to propose automation technology of design using BIM library and to indicate its field availability through case application on a railway project representing linear infrastructure. In addition, it put forward the utilization plan of the automation technology upto 4D and 5D by continue making use of the BIM model created in the project's design stage up through the maintenance stage. The novel method of the technology proposed in this paper incorporates the automatic creation of the BIM library based on two-dimensional tunnel cross-sections and sweeping of it over three-dimensional alignment to create a BIM model of linear infrastructure. The proposed technology is anticipated to improve the efficiecny of modeling process of railway projects based on linear structures.

Proposing a BIM Activation Plan in Civil Projects by Investigating Guidelines in Procurement Processes - Proposing Contents of Guidelines to Support BIM Project in the Road Sector - (국내 발주지침 보완을 통한 토목분야 BIM 활성화 전략 제안 - 도로분야 BIM 프로젝트 지원을 위한 과업지시서 구성요소 제안 -)

  • Choi, Go-eun;Lee, Jaewook;Hong, Chang Hee;Moon, Hyeonsuk;Kim, Do Young
    • Journal of KIBIM
    • /
    • v.13 no.2
    • /
    • pp.47-57
    • /
    • 2023
  • The purpose of this study is to propose a guideline to help the client and bidder operate the BIM project in the domestic road field. As BIM design is mandatory in the construction field, documents disclosed by the ordering agency must essentially include procedures and step-by-step requirements to support BIM. The purpose of this study is to propose the structure and components of the guidelines that practitioners need practically by utilizing the currently announced road field guidelines. The guidelines are analyzed based on the procurement documents that were pre-emptively shared overseas, and supplemented according to the domestic situation. Furthermore, the effectiveness of the revised guidelines is confirmed through expert consultation. This study aims to contribute to creating an environment in which construction practitioners who have no experience in BIM project can efficiently carry out BIM projects.

BIM IMPLEMENTATION STRATEGY AND TASKS FOR ARCHITECTURAL INDUSTRY IN KOREA

  • Ki Byung Yoon
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.88-92
    • /
    • 2011
  • Even though attempts are made to transform from 2D CAD to BIM representation for building design and construction, it were not so successful for practical implementation until recently in construction industry in Korea. However, there is a dramatic change for the use of BIM by collaboration among government, independent organizations as well as industry itself. Government reckons that BIM is an important tool for environment friendly construction and industry competitiveness. The government not only makes national BIM standards and push policies in order to make market environment. Independent organizations such as BuildingSMART Korea does active role to stimulate the transformation process successfully. They act as opinion leaders for the Government to consider BIM implementation for industry competitiveness issue. They make roadmap as well as technical standards and guidelines. It also leads technical developments and supports for its implementation. Government supports researches for the implementation of BIM. The research includes BIM standards, guidelines, linking with existing Architectural Administrative Information Systems, making libraries as well as education. Government makes policy for BIM as a compulsory data for bidding process of newly designed government buildings. Private sector not only agrees BIM as a tool to adapt but also essential methods for its survival in domestic and foreign construction market. Architectural design companies and constructions companies currently develop technical skills and implement BIM for new projects such as Dongdaemoon Plaza that cannot be successfully drawn by conventional methods.

  • PDF

Derivation of BIM Project Properties Through an Analysis of On-Line BIM Project Cases (온라인 BIM(Building Information Modeling) 사례 분석을 통한 BIM 프로젝트 속성정보 도출)

  • Lee, Kyungha;Uhm, Miyoung;Lee, Hwayeon;Lee, Ghang
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.194-195
    • /
    • 2015
  • When starting a new project, generally similar existing projet are searched. As Building Modeling Information(BIM) has short history and experience, the dependence on similar project is high. Small and medium sized design companies are depending on website search tool for information of BIM project besides companies maintaining the Database(DB) from lots of project experience. However, the information level and contents provided by websites differ drastically from each other which makes it difficult to utilize the information and apply cases. Furthermore, the different classification system of the sites makes the situation even worse. Therefore, we collected and analyzed over 100 BIM cases from 18 global websites, to develop a system for BIM case application. Result showed that over 90% of our subject pool provided basic information including the construction type, characteristics of the client (public/ private), location of the project, and detailed information such as primary usage. Moreover, the reasons for applying BIM where to solve problems of geometric design, building system like MEP and construction. Furthermore, there was a contrast between cases conducted only within Korea and cases conducted with other countries. While there was almost always helpful information regarding the administrative steps for Korean BIM cases, there was close to no information for projects carried out outside of Korea. These results could contribute to verifying the trend of information provision of the websites for BIM projects data, and this is believed to be helpful for developing an application system for BIM cases which have an organized information provision system and level as well as for bench marking.

  • PDF

Analysis of BIM Impact on Preventing Rework in Construction Phase (시공단계 BIM 적용에 의한 재시공 방지 효과분석)

  • Lee, Myung-Do;Cha, Min-Su;Lee, Ung-Kyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.2
    • /
    • pp.169-176
    • /
    • 2018
  • The purpose of this study is to analyze the effects of applying BIM to the construction phase on preventing rework. Previous studies have presented the contribution of BIM in various ways, but a more practical and reliable analysis methodology are required. In this study, a BIM effect analysis methodology was proposed after collecting requirements on BIM effect analysis from field professionals. In the case study, the rework prevention effect was analyzed based on the proposed methodology. As a result, it was found that BIM application produced the rework prevention effect of approximately KRW 370,519,593. In addition, a consultation with field professionals on the suitability of the proposed methodology and effect analysis results were revealed that the results were sufficiently reliable. The results of this study can be used as efficient basic materials for research on BIM performance measurement in the future.