The Corresponding Plan for Integrated Environment-the Lowest Cost Bid and The Current Cost Estimate System (최저가입찰제 및 실적공사비적산 환경에서의 대응방안)

  • Kim, Byeong Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.5D
    • /
    • pp.849-859
    • /
    • 2006
  • Earnings of domestic enterprises are expected a serious damage because the lowest cost bid system and the current cost estimate system. In 2005 average successful bid rate for the lowest cost bid project is below 60%, this is not reach at the operating budget of enterprise. Many problems such as illegal construction, low price subcontract, chain enterprise loss com in to practice because of low successful bid rate. In addition earnings of the enterprises expected to be the minimum, because of enlarge execution of the current cost estimate system. This study tries to lend assistance by giving alternative for the construction enterprise by presenting the bid system, investigate and compare foreign system with domestic and analyze correlation of the lowest cost bid and the current cost estimate system.

EVALUATION OF COST-TIME RELATIONSHIPS FOR CONTRACTORS PARTICIPATING IN COST-PLUS-TIME BIDDING

  • Saeed Abdollahi Sean Pour;Hyung Seok David Jeong
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.479-487
    • /
    • 2013
  • State Highway Agencies (SHAs) have started utilizing cost-plus-time bidding (A+B bidding) since Federal Highway Agency (FHWA) declared it operational on May 4, 1995. Although this technique has successfully accelerated many projects by incorporating construction time in the bidding competition, a framework to illustrate the interactions of incentive/disincentive (I/D) rates on the competitiveness of contractors participating in the bid competition is yet to be developed. In a previous research, authors indicated that for each bid competition there is an efficient cap for I/D rates which are dictated by the capabilities of contractors in project acceleration. However, the results of previous study were based on the assumption that there is a statistically significant relationship between cost and time. In this study, the entire cost-plus-time projects implemented by the Oklahoma Department of Transportation (ODOT) were investigated. Then the significance of relationship between cost and time were analyzed for each contractor utilizing Analysis of Variance (ANOVA) technique, and the price-time function of each contractor was determined by regression analysis. The results of the analysis indicate that there is a significant relationship between cost and time for the majority of contractors. However, a quadratic relationship is not always significant and for some contractors a linear price-time relationship is significant. The results of this project can be used not only by ODOT to optimize the incentive/disincentive rates but also by contractors to determine the most competitive strategies of other bid participants.

  • PDF

Assignment-Change Optimization for the Problem of Bid Evaluation (입찰 평가 문제의 배정-변경 최적화)

  • Lee, Sang-Un
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.21 no.4
    • /
    • pp.171-176
    • /
    • 2021
  • This paper deals with bid evaluation problem that chooses the vendors and quantity with minimum purchasing cost for bid information of setup cost and unit price. For this problem, the branch-and-bound(BB) and branch-and-cut(BC) methods are well-known. But these methods can be fail to obtain the optimal solution. This paper gets the initial feasible solution with procuring quantity assignment principle in accordance with the unit price or setup cost rank-first. Then procuring quantity moving optimization(vendor change) is execute take account of unit price or setup cost rank. As a result of experimentation, the propose algorithm is significantly lower compared to BB and BC.

Spatiotemporal Visualization of Unit Price Data of Highway Projects

  • Jain, Deepanshi;Shrestha, K. Joseph;Jeong, H. David
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.77-81
    • /
    • 2015
  • The unit price contracting is the standard contracting method for highway projects in the U.S. As a result, state highway agencies have collected a large amount of historical bid data that they can use to determine engineer's estimates for future projects. The estimator must carefully consider various characteristics of a new project such as its location to determine an engineer's estimate as accurate as possible before bid letting. Higher cost estimates can result in the loss of the available budget and lower cost estimates may lead to deferral and delay of projects. The study uses the historical bid data obtained from Iowa Department of Transportation and develops a Geographic Information System (GIS) tool to visually show the variation of unit prices over the map using a spatial interpolation technique. The interpolation map can be used to estimate the unit price of the item at any location across Iowa. This noble method allows the estimator to effectively and fully utilize the historical bid data in a very time efficient manner and determine more accurate cost estimation.

  • PDF

A Study on the Time Series Analysis of the Actual Unit Cost based on the Bid Prices (시계열을 이용한 실적단가 예측방안에 관한 연구)

  • Park, Won-Young;Seo, Jong-Won;Kang, Sang-Hyeok;Choi, Bong-Joon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.50-57
    • /
    • 2009
  • The Korea Standard of Estimate which has been used as the only basis of Cost estimate of public construction projects is failed to reflect the fluctuation of current construction cost. Therefore, the government decided to gradually introduce historical construction cost into cost estimate of public construction projects from 2004 and to reduce the use of Korean Standard of Estimate. This paper presents a series of process and the methodology for computing Actual Cost and analyzing the fluctuation patterns based on not only previous contract prices which made a successful bid but also all of the other bid prices. Also, this paper mainly handles a device for extracting strategic bid price such as low price bid for assuring reliable data and for predicting the construction cost which is built by Wavelet Analysis of Time series Analysis data and Neural Network. It is anticipated that the effective use of the proposed process for estimating actual unit cost would make the cost estimation more current and reasonable.

Application of Probabilistic Risk Analysis for Profitability-Evaluation of Apartment Reconstruction Projects (아파트 재건축사업의 수익성평가에 대한 확률적 위험도 분석 모형 적용방안)

  • Woo, Kwang-Min;Lee, Hak-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.167-176
    • /
    • 2006
  • It was found that Korean Standard of Estimate which has been used as the only basis of cost estimate of public construction projects had some side effects such as jerry-build construction and over-estimation because it failed to reflect the current price and the state-of-the-art construction methods in a changing construction environment. Therefore, the government decided to gradually introduce historical construction cost into cost estimate of public construction projects from 2004. This paper presents analytic criteria and a process model for deducing more current and reasonable historical construction cost for contract items from not only previous contract prices but also all of the other bid prices that were not contracted. The procedure of estimating actual unit cost proposed in this paper focuses on the removal of abnormal values including strategically too low or high prices and the time correction. In addition, basic research is conducted for the correction of actual unit cost through the analysis of fluctuation of bid price depending on bidding types and rates of successful bid. It is anticipated that the effective use of the proposed process model for estimating actual unit cost would make the cost estimation more current and reasonable.

Whole Life Performance Bid Evaluation in the Korean Public Sector

  • Park, Kenneth Sungho;Lim, Hyoung-Chul
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.6
    • /
    • pp.682-700
    • /
    • 2012
  • Over the last several years, Korea has increasingly adopted design-build for public construction projects. There is a much greater awareness of the need to change to a system based on 'Value for Money', which is high on the government's agenda. A whole life performance bid evaluation model is proposed to aid decision makers in the selection of a design-builder. This is based on the integration of a framework using an analytic hierarchy process, as the bid awarding system is being changed from one based on the lowest price to one based on best value over the life-cycle. Key criteria such as whole life cost, service life planning and design quality are important through the key stages of the evaluation process. The model uses a systematic and holistic approach, which enables the public sector client to make better decisions in design-builder selection, which will deliver whole life benefits based on long-term cost-effectiveness.

A Study on Estimating Method for Actual Unit Cost Based on Bid Prices in Public Construction Projects (시설공사 입찰단가를 활용한 실적단가의 산정 방안에 관한 연구)

  • Kang, Sang-Hyeok;Park, Won-Young;Song, Soon-Ho;Seo, Jong-Won
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.159-166
    • /
    • 2006
  • It was found that Korean Standard of Estimate which has been used as the only basis of cost estimate of public construction projects had some side effects such as jerry-build construction and over-estimation because it failed to reflect the current price and the state-of-the-art construction methods in a changing construction environment. Therefore, the government decided to gradually introduce historical construction cost into cost estimate of public construction projects from 2004. This paper presents analytic criteria and a process model for deducing more current and reasonable historical construction cost for contract items from not only previous contract prices but also all of the other bid prices that were not contracted. The procedure of estimating actual unit cost proposed in this paper focuses on the removal of abnormal values including strategically too low or high prices and the time correction. In addition, basic research is conducted for the correction of actual unit cost through the analysis of fluctuation of bid price depending on bidding types and rates of successful bid. It is anticipated that the effective use of the proposed process model for estimating actual unit cost would make the cost estimation more current and reasonable.

Improvement the bidding system in domestic construction engineering procurement (국내 건설 엔지니어링 입 ${\cdot}$ 낙찰 제도 개선방안 연구)

  • Choi, Bong-Gun;Park, Sung-Je;Joh, Hoon-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.632-637
    • /
    • 2006
  • Our country's bidding system had made the lowest price successful bid system in foundation before introducing eligibility review system at July, 1995, and a averaged- price successful bid system or the restrictive-lowest price successful bid system had been enforced by repletion. However, they were introduced as dumping that do not reach in direct cost level of construction cost is generalized and worry about illegal construction practices rises by the lowest price successful bid system. According as they had not been promoted construction company's technical development effort or cost reduction effort, vicious circle that advocate competition principle again and recur as the lowest price successful bid system is repeated last 50 years. Therefore, I present improvement direction that can satisfy all Global Standard and real condition of our country through foreign countries example analysis to cope with the rapidly changing building circumstances socially and economically to correspond actively to the construction industry's reorganization to reconsider domestic construction engineering's competitive power.

  • PDF

Automatic Generation of Reserve Prices and Bid Prices for a Group Buying System (공동 구매 시스템에서의 낙찰 예정가 및 입찰가 자동 생성)

  • 김신우;고민정;박성은;이용규
    • The Journal of Society for e-Business Studies
    • /
    • v.7 no.2
    • /
    • pp.55-68
    • /
    • 2002
  • Internet group buying systems have been widely used recently. In those systems, because the reserve price is provided by the buyer, the success rate can be decreased if the reserve price is set too low compared with the normal price. Otherwise, an unsuitable successful bid can be made if the reserve price is set too high based on inaccurate information. Likewise, the seller's providing too high a bid price can deteriorate his/her own successful bid rate, whereas a successful bid with too low a price may make no profit in the sale. Therefore, pricing agents that recommend adequate prices based on the past buying and selling history data can be helpful. In this paper, we propose two kinds of agents. One suggests reserve prices to buyers based on the past buying history database of the system. The other recommends bid prices to a seller based on the past bidding history data of the company using the cost accounting theory. Through performance experiments, we show that the successful bid rate can increase by preventing buyers from making unreasonable reserve prices. Also, we show that, for the seller, the rate of successful bids with appropriate profits can increase. Using the pricing agents, we design and implement an XML-based group buying system.