International Journal of Naval Architecture and Ocean Engineering
/
v.9
no.3
/
pp.282-291
/
2017
The main aim of this study is to investigate the effect of berm breakwater on wave run-up. A total of 200 numerical analysis tests have been carried out in this paper to investigate the effect of berm width, wave height, and wave period on the wave run-up, using an integrating technique of Computer-Aided Design (CAD) and Computational Fluid Dynamics (CFD). Direct application of Navier Stokes equations within the berm width has been used to provide a more reliable approach for studying the wave run-up over berm breakwaters. A well tested Reynolds-averaged Navier-Stokes (RANS) code with the Volume of Fluid (VOF) scheme was adopted for numerical computations. The computational results were compared with theoretical data to validate the model outputs. Numerical results showed that the simulation method can provide accurate estimations for wave run-up over berm breakwaters. It was found that the wave run-up may be decreased by increasing the berm width up to about 36 percent. Furthermore, the wave run-up may increase by increasing the wave height and wave period up to about 53 and 36 percent, respectively. These results may convince the engineers to use this model for design of berm breakwater in actual scale by calculating the Reynolds numbers.
Together with the wall stiffness, a berm has the role of deciding the stability of a temporary retaining wall before structure installation after excavation. Especially in case of loose or soft soil excavated ground, the role of berm is very important. In this study, the measurement data obtained from the temporary retaining wall in the bermed excavation site in urban and numerical analysis are used to investigate the effects of berm's dimension (width and slope), excavation depth and ground property on the maximum horizontal displacement of the temporary retaining wall. The measurement data indicated that the wall displacement varied to the berm's width. That is, as the berm width decreased, the wall displacement increased. As a result of numerical analyses, the maximum wall displacement increased as slope increased and berm width decreased. This means that the berm is effectively restrained to the wall displacement. As excavation depth increased, the effect of berm's slope and width increased. In case of the same berm condition, the wall displacement restrained as ground property increased.
Journal of the Korea Academia-Industrial cooperation Society
/
v.15
no.8
/
pp.5342-5348
/
2014
Slope stability analyses were conducted to investigate the limitations of application of the standard inclination of slope and the effects of the berm width on the slope stability. The standard slope inclination could be applied to the basic slope sections that were considered for the analyses, whereas additional slope stability analysis should be performed for the case of considering ground water. A comparison of the factors of safety between the case of installing a berm and the case of letting the grading have an equivalent section area with the case of installing the berm, the factors of safety in the case of installing a berm were greater than those for the case of allowing grading, and the differences between the factors of safety increase with increasing berm width. For all the sections considered in the analyses, the increments of the safety factor were proportional to the width of the berm and those corresponding to the embankment slope and cut slope with a berm width of 7m were 34.5% and 48%, respectively.
The purpose of this study is to estimate the behavior and the mechanism of debris flow at the end of mountain side when a berm was set on the inclined plane. The numerical model was performed by using the Finite Difference Method(FDM) based on the equation for the mass conservation and momentum conservation. In order to measure the behavior of the debris flow, the debris flow of a straight channel slope and the debris flow of channel slope with 3 types of berms were compared. First, the flow discharge and the sediment volume concentration at the downstream of the channel slope, depending on the various berm width and the different inflow discharges at the upstream of the channel were analyzed. The longer the berm width, the flow discharge at the downstream of the channel was decreased and the high flow fluctuation was reduced by a berm. And it means that a berm can effect for the delay of the debris flow. Through Root Mean Square ratio(RMS) comparison, the flow discharge of the channel slope with a berm was lower than that of a straight channel slope. The longer the berm width, for the sediment volume concentration, an inflection point did not show but mild curve. Because the low sediment concentration with water mixture by a berm continuously flow at the downstream end, it will be effect for reducing the disaster caused by debris flow. The results of this study will provide useful information in predicting and preventing disaster caused by the debris flow.
Proceedings of the Korea Water Resources Association Conference
/
2006.05a
/
pp.1919-1924
/
2006
In this study, the run-up of water waves on slopes of s-berm breakwaters was investigated by performing a series of hydraulic experiments. The run-up height was analyzed in detail by using the effects of wave steepness and surf similarity parameter. In general, the run-up heights were decreased as the height and the width of berm were increased. However, the variation of run-up height was small for change of wave steepness and surf similarity parameter.
Journal of Korean Society of Coastal and Ocean Engineers
/
v.18
no.2
/
pp.147-153
/
2006
In this study, the run-up of water waves on slopes of s-berm breakwaters was investigated by performing a series of hydraulic experiments. The run-up height was analyzed in detail by using the effects of wave steepness and surf similarity parameter. In general, the run-up heights were decreased as the height and the width of berm were increased. However, the variation of run-up height was small for change of wave steepness and surf similarity parameter.
This study was carried out to investigate the quarrying and restoration characteristics on quarry in Korea. We researched quarrying and restoration status, analyzed the relationship between restoration area and permitted period, permitted area, quarrying volume, pit slope width, height, and berm width from 55 quarry sites. Most of the quarries were located in the following conditions : mixed forest, average altitude of less than 300 m, average mountain slope of $61^{\circ}$<, hillside, granite and landslide hazard class. Major quarrying characteristics were permitted period of 6~10 years, permitted area of less than 10 ha, quarrying volume of less than $1,000,000m^3$, a stone type of aggregate, a quarrying type of terrace, pit slope of $61^{\circ}$< Most quarries were restored by themselves, and the main restoration type was slope greening. Also, area ratio of flatland, pit slope, and berm was 54.9:39.6:5.5. Ccorrelation analysis showed that quarrying area was positively correlate with quarrying volume (${\alpha}=0.01$), permitted area, pit width, and pit height (a=0.05).
Proceedings of the Korean Society of Coastal and Ocean Engineers Conference
/
1996.10a
/
pp.176-183
/
1996
In order to reduce wave reflection from a breakwater, a perforated wall caisson is often used. A conventional perforated wall caisson breakwater for which the water depth inside the wave chamber is the same as that on the rubble mound berm has less weight than a vertical solid caisson with the same width and moreover the weight is concentrated on the rear side of the caisson. (omitted)
Journal of Korean Society of Coastal and Ocean Engineers
/
v.22
no.6
/
pp.397-404
/
2010
Laboratory tests of wave overtopping rates for a rubble mound breakwaters armoured Tetrapod were carried out, with varying design waves, crest berm widths and crest freeboards. The objective of this study is to investigate overtopping performance and to examine the characteristics of the widely used overtopping prediction models through the results of laboratory tests. Laboratory tests show that structure slope and wave periods have a considerable influence on overtopping rates, but the difference of overtopping rates related to crest berm widths is slight. Owen(1980)'s prediction considerably overestimates compared to the measured valued. Prediction of Van der Meer et al.(1998) underestimates only for steep slope($cot{\alpha}$=1.5). Besley(1999)'s and Pedersen(1996)'s predictions have a relatively good agreement with the measured results for slopes with a broader crest berm width. In general, best agreement between measured and predicted overtopping rates is observed using modified Pedersen(1996)'s formula for all test conditions.
Earth berms are often left in place to support retaining walls or piles in order to eliminate horizontal struts in excavations of soft soil areas. However, if the excavation depth is relatively large, an earth berm-supported retaining system may not be applicable and could be replaced by a multi-bench retaining system. However, studies on multi-bench retaining systems are limited. The goal of this investigation is to study the deformation characteristics, internal forces and interaction mechanisms of the retaining structures in a multi-bench retaining system and the failure modes of this retaining system. Therefore, a series of model tests of a two-bench retaining system was designed and conducted, and corresponding finite difference simulations were developed to back-analyze the model tests and for further analysis. The tests and numerical results show that the distance between the two rows of retaining piles (bench width) and their embedded lengths can significantly influence the relative movement between the piles; this relative movement determines the horizontal stress distribution in the soil between the two rows of piles (i.e., the bench zone) and thus determines the bending moments in the retaining piles. As the bench width increases, the deformations and bending moments in the retaining piles decrease, while the excavation stability increases. If the second retaining piles are longer than a certain length, they will experience a larger bending moment than the first retaining piles and become the primary retaining structure. In addition, for varying bench widths, the slip surface formation differs, and the failure modes of two-bench retained excavations can be divided into three types: integrated failure, interactive failure and disconnected failure.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.