• Title/Summary/Keyword: Benefit Estimation

Search Result 235, Processing Time 0.028 seconds

Tensor-Based Channel Estimation Approach for One-Way Multi-Hop Relaying Communications

  • Li, Shuangzhi;Mu, Xiaomin;Guo, Xin;Yang, Jing;Zhang, Jiankang
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.9 no.12
    • /
    • pp.4967-4986
    • /
    • 2015
  • Multi-hop relaying communications have great potentials in improving transmission performance by deploying relay nodes. The benefit is critically dependent on the accuracy of the channel state information (CSI) of all the transmitting links. However, the CSI has to be estimated. In this paper, we investigate the channel estimation problem in one-way multi-hop MIMO amplify-and-forward (AF) relay system, where both the two-hop and three-hop communication link exist. Traditional point-to-point MIMO channel estimation methods will result in error propagation in estimating relay links, and separately tackling the channel estimation issue of each link will lose the gain as part of channel matrices involved in multiple communication links. In order to exploit all the available gains, we develop a novel channel estimation model by structuring different communication links using the PARAFAC and PARATUCK2 tensor analysis. Furthermore, a two-stage fitting algorithm is derived to estimate all the channel matrices involved in the communication process. In particular, essential uniqueness is further discussed. Simulation results demonstrate the advantage and effectiveness of the proposed channel estimator.

The Potential Cost-Benefit Analysis on the Disability Discrimination Act in Korea (장애인차별금지법의 잠재적 비용-편익 분석: 고용영역을 중심으로)

  • Yu, Dong-Chul
    • Korean Journal of Social Welfare
    • /
    • v.57 no.2
    • /
    • pp.297-320
    • /
    • 2005
  • This study was attempted to give aids in making 'the Disability Discrimination Act' by estimating the potential Cost-Benefit in case that the discrimination on the disabled is removed. The potential benefits from this Disability Discrimination Act are calculated considering the income increase of the people with disabilities from additional employment for them and the decrease of employment levies and the public assistance benefits. The potential cost was made focusing on the following 2 expenses- the extra expenditures that the owners of companies had to invest from the employment of the disabled and the managing expenses for correcting discrimination organizations. As the result of this estimation, the potential net present value under the 7% discount rate is very high as 12,700,301 million won and the cost-benefit ratio is also great as 96.8. The consequence of the sensitive analysis in changing the discount rate also does not have great changes. As the result of these estimating results, it is known that when the discrimination is solved by the 'Disability Discrimination Act', the pure benefit of our society will become tremendous. After all, it could be said that the need for 'the Disability Discrimination Act' is emphasized and should be emphasized.

  • PDF

Calculation of Total Benefit by the Contingent Valuation Method for Cost-Benefit Analysis: Focusing on Income and Distance-Decay Effects (비용편익분석을 위한 조건부가치측정법에서의 총편익 산정: 소득효과 및 거리-소멸 효과를 중심으로)

  • Lee, Jongyearn
    • KDI Journal of Economic Policy
    • /
    • v.36 no.1
    • /
    • pp.43-80
    • /
    • 2014
  • This study suggests a model for calculating total benefit rigorously to use the contingent valuation method (CVM) in cost-benefit analysis (CBA). Estimating households' willingness to pay through survey method, the study attempts to demonstrate if a respondent's income and the distance between a respondent's residence and the location of a target facility affect her willingness to pay. The estimation results from a structural model show that income and distance-decay effects exist and that the calculated total benefit varies largely when these effects are ignored. The study emphasizes the effects of income and distance-decay on the total benefit must be carefully considered in using CVM for CBA. Even though the total project cost is precisely estimated, the benefit/cost (B/C) ratio may differ largely when the total benefit is not correctly calculated. Also, an ad hoc model generates significantly different estimates from the utility difference model this study adopted. The difference in estimates suggests that the total benefit has to be estimated by a structural model. Finally, simulations are performed to check the validity of the model as well as to predict consequences when income and distance-decay effects are not properly treated. The results from simulations reveal it is not desirable to ignore those effects considering the perspectives of balanced regional development.

  • PDF

Application of Constrained Bayes Estimation under Balanced Loss Function in Insurance Pricing

  • Kim, Myung Joon;Kim, Yeong-Hwa
    • Communications for Statistical Applications and Methods
    • /
    • v.21 no.3
    • /
    • pp.235-243
    • /
    • 2014
  • Constrained Bayesian estimates overcome the over shrinkness toward the mean which usual Bayes and empirical Bayes estimates produce by matching first and second empirical moments; subsequently, a constrained Bayes estimate is recommended to use in case the research objective is to produce a histogram of the estimates considering the location and dispersion. The well-known squared error loss function exclusively emphasizes the precision of estimation and may lead to biased estimators. Thus, the balanced loss function is suggested to reflect both goodness of fit and precision of estimation. In insurance pricing, the accurate location estimates of risk and also dispersion estimates of each risk group should be considered under proper loss function. In this paper, by applying these two ideas, the benefit of the constrained Bayes estimates and balanced loss function will be discussed; in addition, application effectiveness will be proved through an analysis of real insurance accident data.

Maximum Likelihood (ML)-Based Quantizer Design for Distributed Systems

  • Kim, Yoon Hak
    • Journal of information and communication convergence engineering
    • /
    • v.13 no.3
    • /
    • pp.152-158
    • /
    • 2015
  • We consider the problem of designing independently operating local quantizers at nodes in distributed estimation systems, where many spatially distributed sensor nodes measure a parameter of interest, quantize these measurements, and send the quantized data to a fusion node, which conducts the parameter estimation. Motivated by the discussion that the estimation accuracy can be improved by using the quantized data with a high probability of occurrence, we propose an iterative algorithm with a simple design rule that produces quantizers by searching boundary values with an increased likelihood. We prove that this design rule generates a considerably reduced interval for finding the next boundary values, yielding a low design complexity. We demonstrate through extensive simulations that the proposed algorithm achieves a significant performance gain with respect to traditional quantizer designs. A comparison with the recently published novel algorithms further illustrates the benefit of the proposed technique in terms of performance and design complexity.

Robust Pilot-aided Frequency Offset Estimation Scheme for OFDM-based Broadcasting System with Cyclic Delay Diversity

  • Shin, Won-Jae;You, Young-Hwan
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.7 no.12
    • /
    • pp.3055-3070
    • /
    • 2013
  • This paper proposes an improved carrier frequency offset (CFO) and sampling frequency offset (SFO) estimation scheme for orthogonal frequency division multiplexing (OFDM) based broadcasting system with cyclic delay diversity (CDD) antenna. By exploiting a periodic nature of channel transfer function, cyclic delay and pilot pattern with a maximum channel power are carefully chosen, which helps to enable a robust estimation of CFO and SFO against the frequency selectivity of the channel. As a performance measure, a closed-form expression for the achievable mean square error of the proposed scheme is derived and is verified through simulations using the parameters of the digital radio mondiale standard. The comparison results show that the proposed frequency estimator is shown to benefit from properly selected delay parameter and pilot pattern, with a performance better than the existing estimator.

A Method to Determine the Purchasing Limits of Reservior Flooding Area by Rainfall Data Hydrologric Estimation (강우기록 및 수문계획에 의한 정수지수설지의 용지 현수험 결정방법)

  • 김주영
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.11 no.3
    • /
    • pp.1742-1748
    • /
    • 1969
  • This is a method to determine the boundary line of reservoir flooding area which will be purchased. Until now, flood water level was used as the boundary line. By lowering this line from flood water level, purchasing cost of reservoir flooding area can be cut down. Sometimes, temporary flooding of arable land outside the boundary occurs. During the life of reservoir, flood damage to crop product on of this land must be indemified with net berefit from arable land between the bovndary line and normal water level. Following is the basic formula to determine the line. (Estimated flood damage to crop production of land outside the boundary line $\leqq$ Estimated net beneift from land between the boundary line and normal water level.) Minimum difference between both sides is needed to minimize the purchasing area. Flood damage and net benefit are estimated by hydrologic estimation with rainfall data and crop production estimation.

  • PDF

A Study on Cost-Benefit Analysis of BIM-based Integrated Design Process in Korean Architectural Offices (국내 설계사무소의 BIM기반 통합설계프로세스 도입에 따른 비용효과분석에 관한 연구)

  • Seo, Ji-Hyo;Choo, Seung-Yeon
    • Korean Journal of Computational Design and Engineering
    • /
    • v.15 no.4
    • /
    • pp.261-270
    • /
    • 2010
  • These days, architectural projects are becoming larger and more complex. And lots of information occurs through each phases and areas. For these reason, it is emphasized that collaboration with other parts. Therefore we need more effective architectural design process. However, it is difficult to collaborate in early stage with existing design process and it causes unnecessary spending of time and cost because of 2D-based working system. For solving these problem, we should introduce BIM-based Integrated Design Process which makes it possible to collaborate with other parts from early stage. Now the AEC industry in Korea has been trying to introduce BIM, and promoting variety of related business. However, for actual application of this system, it is unfortunately necessary to change various system throughout the construction industry. And this will cause lots of effort and expense. It is essential that scientific analysis and evaluation of efficiency and validity about this investment, because estimation of the investment and accompanying effects will provide reasonable standard of judgment for investment decision. Thus, this research conducted Cost-Benefit Analysis about BIM-based Integrated Design Process compared to existing design process. It is expected that this paper can be used for preliminary data in the future BIM market.

Economic-based approach for predicting optimal water pipe renewal period based on risk and failure rate

  • Kim, Kibum;Seo, Jeewon;Hyung, Jinseok;Kim, Taehyeon;Kim, Jaehag;Koo, Jayong
    • Environmental Engineering Research
    • /
    • v.24 no.1
    • /
    • pp.63-73
    • /
    • 2019
  • This study suggests a method for calculating the benefits of water pipe renewal based on an estimate of the water supply suspension risk. The proposed method based on five benefit items is more direct and specific than other benefit estimation methods. In addition, a methodology evaluating the economics of pipe renewal based on pipe failure rate is proposed for estimating the optimal renewal point from an economic perspective. By estimating the optimal renewal period based on a yearly benefit cost ratio per pipe in a case study area, it was possible to draft an optimal renewal plan for the subject region from an economic perspective. Compared with other methodologies, a reasonable optimal renewal period was derived from an economic point of view. The result of this study may be used to develop future water pipe renewal plans. Moreover, the proposed methodologies and results derived from this study can be applied to asset management plans.

An Economic Evaluation of an Integrated Service Platform of Open Access Research Papers (오픈액세스논문 통합서비스플랫폼의 경제성 평가)

  • Kwon, Nahyun;Pyo, Soon Hee;Lee, Jungyeoun;Kim, Wan Jong;Moon, Sunung
    • Journal of the Korean Society for Library and Information Science
    • /
    • v.56 no.3
    • /
    • pp.265-290
    • /
    • 2022
  • An economic evaluation was conducted using cost-benefit analysis for an integrated service platform of open access research articles. The data needed for benefit measurement were collected by conducting a series of surveys to service beneficiaries, including 1,313 academic researchers, 49 bio-industry researchers, and 102 researchers in various industries. Cost-benefit analysis and sensitivity analysis were conducted after estimating the total costs for system construction and operations, anticipated direct and indirect benefits. With respect to the cost-benefit analysis limited to direct benefits, the estimated benefit was KRW 82 billion, which is about 14 times of the total costs for eight years of the entire business period. With respect to the cost-benefit analysis for both direct and indirect benefits, BCR was estimated to be about 98.9 and NPV to be KRW 538.8 billion, indicating that economic feasibility of the project was sufficiently secured. The results of this analysis may help securing the investment to the integrated service platform for OA research products, and the benefit estimation model developed in this study would be utilized as an assessment tool during the rest of this project.