• Title/Summary/Keyword: Bend in channel

Search Result 71, Processing Time 0.025 seconds

Feasibility Calculation of FaSTMECH for 2D Velocity Distribution Simulation in Meandering Channel (사행하천의 2차원 유속분포 모의를 위한 FaSTMECH 모형의 적용성 검토)

  • Son, Geunsoo;You, Hojun;Kim, Dongsu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.6
    • /
    • pp.1753-1764
    • /
    • 2014
  • Numerical flow simulation models in the riverine environments have been widely utilized for analyzing flow dynamics in various degrees in researches and practical applications. However, most of the simulated results have been validated based on the data from indoor experimental models or very limited in-situ measurements. Therefore, it has been required to more accurately validate the performance of the numerical models in terms of the detailed field observations. In particular, it was also hard to validate the performances of the existing numerical models in the real meandered river channels that encompass more sophisticated flow and geometric structures. Recently, advancements of the modern flow measuring instrumentations such as acoustic Doppler current profilers (ADCPs) enabled us to efficiently acquire the detailed flow field in the broad range of river channels, thus that it became to be possible to accurately validate any numerical models with the field observations. In this study, based on the detailed flow measurements in a actual meandered river channel using ADCP, we validated FaSTMECH model in iRIC in terms of water surface elevation, which is relatively new but began to get highlighted in the research areas. As the validation site, a meandering channel in River Experiment Center of KICT was chosen, which has 6.5 m of width, 0.38m of flow depth, 1.54 m3/s of flow discharge, 0.61 m/s of mean flow velocity, and 1.2 of sinuosity. As results, whereas the FaSTMECH precisely simulated water surface elevation, simulated velocity field in the bend did not match well with ADCP dataset.

How effective has the Wairau River erodible embankment been in removing sediment from the Lower Wairau River?

  • Kyle, Christensen
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2015.05a
    • /
    • pp.237-237
    • /
    • 2015
  • The district of Marlborough has had more than its share of river management projects over the past 150 years, each one uniquely affecting the geomorphology and flood hazard of the Wairau Plains. A major early project was to block the Opawa distributary channel at Conders Bend. The Opawa distributary channel took a third and more of Wairau River floodwaters and was a major increasing threat to Blenheim. The blocking of the Opawa required the Wairau and Lower Wairau rivers to carry greater flood flows more often. Consequently the Lower Wairau River was breaking out of its stopbanks approximately every seven years. The idea of diverting flood waters at Tuamarina by providing a direct diversion to the sea through the beach ridges was conceptualised back around the 1920s however, limits on resources and machinery meant the mission of excavating this diversion didn't become feasible until the 1960s. In 1964 a 10 m wide pilot channel was cut from the sea to Tuamarina with an initial capacity of $700m^3/s$. It was expected that floods would eventually scour this 'Wairau Diversion' to its design channel width of 150 m. This did take many more years than initially thought but after approximately 50 years with a little mechanical assistance the Wairau Diversion reached an adequate capacity. Using the power of the river to erode the channel out to its design width and depth was a brilliant idea that saved many thousands of dollars in construction costs and it is somewhat ironic that it is that very same concept that is now being used to deal with the aggradation problem that the Wairau Diversion has caused. The introduction of the Wairau Diversion did provide some flood relief to the lower reaches of the river but unfortunately as the Diversion channel was eroding and enlarging the Lower Wairau River was aggrading and reducing in capacity due to its inability to pass its sediment load with reduced flood flows. It is estimated that approximately $2,000,000m^3$ of sediment was deposited on the bed of the Lower Wairau River in the time between the Diversion's introduction in 1964 and 2010, raising the Lower Wairau's bed upwards of 1.5m in some locations. A numerical morphological model (MIKE-11 ST) was used to assess a number of options which led to the decision and resource consent to construct an erodible (fuse plug) bank at the head of the Wairau Diversion to divert more frequent scouring-flows ($+400m^3/s$)down the Lower Wairau River. Full control gates were ruled out on the grounds of expense. The initial construction of the erodible bank followed in late 2009 with the bank's level at the fuse location set to overtop and begin washing out at a combined Wairau flow of $1,400m^3/s$ which avoids berm flooding in the Lower Wairau. In the three years since the erodible bank was first constructed the Wairau River has sustained 14 events with recorded flows at Tuamarina above $1,000m^3/s$ and three of events in excess of $2,500m^3/s$. These freshes and floods have resulted in washout and rebuild of the erodible bank eight times with a combined rebuild expenditure of $80,000. Marlborough District Council's Rivers & Drainage Department maintains a regular monitoring program for the bed of the Lower Wairau River, which consists of recurrently surveying a series of standard cross sections and estimating the mean bed level (MBL) at each section as well as an overall MBL change over time. A survey was carried out just prior to the installation of the erodible bank and another survey was carried out earlier this year. The results from this latest survey show for the first time since construction of the Wairau Diversion the Lower Wairau River is enlarging. It is estimated that the entire bed of the Lower Wairau has eroded down by an overall average of 60 mm since the introduction of the erodible bank which equates to a total volume of $260,000m^3$. At a cost of $$0.30/m^3$ this represents excellent value compared to mechanical dredging which would likely be in excess of $$10/m^3$. This confirms that the idea of using the river to enlarge the channel is again working for the Wairau River system and that in time nature's "excavator" will provide a channel capacity that will continue to meet design requirements.

  • PDF

Analysis of Channel Changes in Mountain Streams Due to Typhoon Hinnamnor Flood - A Case Study on Shingwangcheon and Naengcheon Streams in Pohang - (태풍 힌남노 홍수로 인한 산지 중소하천의 하도 변화 분석 - 포항 신광천 및 냉천을 사례로 -)

  • Chanjoo Lee;Seong Gi An;Eun-Kyung Jang
    • Ecology and Resilient Infrastructure
    • /
    • v.10 no.4
    • /
    • pp.97-106
    • /
    • 2023
  • This study analyzed morphological changes in the Singwangcheon and Naengcheon streams in Pohang caused by flooding due to Typhoon Hinnamnor. Analysis of the changes in river channel area from the past to recent times using aerial photos and drone-taken images showed that the river width had gradually decreased since the 1960s. However, after the flood, the river width increased again. Changes in the river cross-section before and after the flood show that a large amount of coarse sediment was deposited inside the river bend while the outer bank was eroded. The water levels calculated using HEC-RAS for the pre-flood cross-section based on the flood frequency discharges and estimated discharge from Oer Reservoir were significantly lower than the observed water level, which means that the cross-sectional change was not considered. The results of this study suggest that it is necessary to consider cross-sectional changes due to sediment transport when estimating the flood level of small and medium-sized mountain streams, and it is needed to investigate the geomorphic changes after floods.

Three-dimensional Numerical Analysis of Dam-break Waves on a Fixed and Movable Bed (고정상 및 이동상 수로에서 댐 붕괴파의 3차원 수치해석)

  • Kim, Dae Geun;Hwang, Gun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.4B
    • /
    • pp.333-341
    • /
    • 2011
  • This study analyzed the propagation of dam-break waves in an area directly downstream of a dam by using 3D numerical modeling with RANS as the governing equation. In this area, the flow of the waves has three dimensional characteristics due to the instantaneous dam break. In particular, the dam-break flows are characterized by a highly unsteady and discontinuous flow, a mixture of the sharp flood waves and their reflected waves, a mixture of subcritical and supercritical flow, and propagation in a dry and movable bed. 2D numerical modeling, in which the governing equation is the shallow water equation, was regarded as restricted in terms of dealing with the sharp fluctuation of the water level at the dam-breaking point and water level vibration at the reservoir. However, in this 30 analysis of flood wave propagation due to partial dam breaking and dam-break in channels with $90^{\circ}$ bend, those phenomena were properly simulated. In addition, the flood wave and bed profiles in a movable bed with a flat/upward/downward bed step, which represents channel aggradation or degradation, was also successfully simulated.

A REVIEW OF CANDU FEEDER WALL THINNING

  • Chung, Han-Sub
    • Nuclear Engineering and Technology
    • /
    • v.42 no.5
    • /
    • pp.568-575
    • /
    • 2010
  • Flow Accelerated Corrosion is an active degradation mechanism of CANDU feeder. The tight bend downstream to Gray loc weld connection, close to reactor face, suffers significant wall thinning by FAC. Extensive in-service inspection of feeder wall thinning is very difficult because of the intense radiation field, complex geometry, and space restrictions. Development of a knowledge-based inspection program is important in order to guarantee that adequate wall thickness is maintained throughout the whole life of feeder. Research results and plant experiences are reviewed, and the plant inspection databases from Wolsong Units One to Four are analyzed in order to support developing such a knowledge-based inspection program. The initial thickness before wall thinning is highly non-uniform because of bending during manufacturing stage, and the thinning rate is non-uniform because of the mass transfer coefficient distributed non-uniformly depending on local hydraulics. It is obvious that the knowledge-based feeder inspection program should focus on both fastest thinning locations and thinnest locations. The feeder wall thinning rate is found to be correlated proportionately with QV of each channel. A statistical model is proposed to assess the remaining life of each feeder using the QV correlation and the measured thicknesses. W-1 feeder suffered significant thinning so that the shortest remaining life barely exceeded one year at the end of operation before replacement. W-2 feeder showed far slower thinning than W-1 feeder despite the faster coolant flow. It is believed that slower thinning in W-2 is because of higher chromium content in the carbon steel feeder material. The average Cr content of W-2 feeder is 0.051%, while that value is 0.02% for W-1 feeder. It is to be noted that FAC is reduced substantially even though the Cr content of W-2 feeder is still very low.

Prediction of River Bed Change due to Yongdam Dam Discharge (용담댐 방류에 따른 하상변동 예측)

  • Kim, Young-Bok;Jung, Seung-Kwon;Shim, Soon-Bo
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.6 no.1 s.20
    • /
    • pp.69-81
    • /
    • 2006
  • The purpose of this study is to identify the downstream influences due to the dam discharge by using 2-dimensional model, SMS(Surface water Modeling System). RMA-2 and SED-2D in SMS were applied to Yongdam multipurpose dam watershed located in Gum river basin. Through the simulation, erosion and deposit quantitative analysis of sinuous channels and scour pattern analysis of bridges have been done. A differences erosion depths between deposit are simulated as $-102.4 mm{\sim}54.2 mm$ at No.176(1.4 km) and $-104.1 mm{\sim}28.9 mm$ at No.146(7.4 km), sinuous channel. The river bed at Kamdong bridge in straight channal is simulated as uniform erosion. However, the river bed at Dumdul bridge in sinuous channal has been shown as different erosion depths at each sides. Consequently, the parts that could not be simulated on the existing 1-dimensional model, can be improved results by using a 2-dimensional model, about weakness points for hydraulic modeling such as extreme bend, tributary confluence.

Numerical Analysis for Bed Changes at the Meandering Stream due to a Short Term Flood Event (단기 홍수사상으로 인한 사행하천의 하상변동 수치모의 분석)

  • Ji, Un;Jang, Eun Kyung;Lee, Chan Joo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.6
    • /
    • pp.1229-1236
    • /
    • 2015
  • In this study, flow characteristics and bed changes during a short term flood event were analyzed using the two-dimensional CCHE2D model for a meandering sand-bed river, the Naesung Stream. Flow and bed change simulation was carried along the three sub-reaches with sinuosity of 1.2, 1.6 and 2.2 for the 6-day flood event occurring in June 2011. The simulation results indicated that velocity variation due to flow concentration was larger along the sub-reach with the sinuosity less than 1.5 and bed erosion at the outside of the bend was increased by time. In the sub-reach with the sinuosity less than 1.5, the maximum flood discharge produced the maximum flow velocity over 1.6 m/s to 2 m/s locally.

Detailed Analysis for Secondary Flow Pattern Before and After Channel Bend in Actual River (실규모 하천 계측자료 기반 만곡 전후 2차류 흐름패턴 상세 분석)

  • Son, Geunsoo;Kim, Dongsu;Kim, Seojun;Kim, Jongmin
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2015.05a
    • /
    • pp.80-80
    • /
    • 2015
  • 만곡부가 연속적으로 발생하는 사행하천은 만곡의 영향으로 2차류가 발생한다. 이러한 2차류의 영향은 하상변동, 제방침식 등의 문제를 발생시켜 사행수로의 흐름특성을 분석하기 위한 많은 연구들이 진행되어 왔다. 하지만, 대부분의 연구들은 실규모 하천의 유속측정의 어려움, 측정이 가능한 시설 및 경제적 제한으로 인해 주로 실내실험에서 측정된 자료를 이용하여 분석을 수행하여 흐름조건이 상이한 실제 하천에서 적용성에 한계가 있어 왔다. 본 연구에서는 상세한 3차원 유속 측정이 가능한 최신 계측기기인 초음파도플러유속계(ADCP)를 활용하여 실제하천과 유사한 흐름 상태 및 지형을 재현한 한국건설기술연구원 안동하천실험센터의 사행도 1.2, 1.5, 1.7의 실규모 사행수로에서 횡단면 측정을 수행하였다. 또한 초음파지점유속계(ADV)를 사행도 1.2의 ADCP 측정 단면과 동일한 횡단면에서 측정하여 공간평균된 ADCP 유속자료를 이용한 흐름패턴 분석의 적용성을 검증하였다. 그 결과 공간평균된 ADCP 유속분포는 시간평균한 ADV 유속분포와 다소 크기의 차이는 발생하였지만 패턴은 매우 유사하게 나타났다. 따라서, 공간평균된 ADCP 유속분포를 이용하여 2차류에 의한 흐름패턴 분석을 수행하였다. 2차류 패턴은 만곡의 위치에 따라 매우 복잡한 형태로 나타났다. 2차류에 의한 최대유속선과 최대수심선의 발생위치를 분석한 결과, 만곡의 정점부를 기준으로 만곡 전인 유입부에서는 이격되고 만곡 후인 유출부에서는 유사한 경로를 나타내고 있었다. 이때의 2차류강도(Secondary Current Intensity; SCI)는 만곡의 정점부 부근에서 최대로 증가했다가 다시 감소하는 결과를 보였다.

  • PDF

Gradation and Transport Characteristics of Bed Materials in Pool-Riffle Sequence in the Gap Stream, Korea (갑천의 웅덩이-여울 연속구조에서 하상토의 입도 및 이동 특성)

  • Choi, Sung-Uk;Bae, Hye-Deuk
    • Journal of Korea Water Resources Association
    • /
    • v.44 no.1
    • /
    • pp.65-72
    • /
    • 2011
  • Natural streams meander, forming pools at the outer part of bend and riffles at the crossing. Pools are deep at a lower flow velocity, and riffles are shallow at a higher flow velocity. Attentions are being paid to pool-riffle sequences in meandering streams because pool-riffle sequences tend to increase biodiversity of the stream ecosystem. This study investigates the characteristics of distribution of bed sediment particles in the upstream reach of the Gap Stream, which is a tributary of the Geum River in Korea. The upstream part of the Gap Stream, the study reach, is a gravel-bed stream, showing a pool and three riffles due to meandering. The reach also includes pools at the upstream and downstream parts of the weir. The characteristics of bed sediment particles sampled at the wetland and in the side channel are studied, revealing that the median particle diameter in the riffle is about four times larger than that in the pool. In addition, flow simulations are carried out for ordinary discharge and design flood, and such parameters important to sediment transport as velocity, shear stress, dimensionless shear stress (or Shields number), and dimensionless shear velocity are provided to see the mobility of sediment particles in the pool-riffle sequence.

Modeling 2D residence time distributions of pollutants in natural rivers using RAMS+ (RAMS+를 이용한 하천에서 오염물질의 2차원 체류시간 분포 모델링)

  • Kim, Jun Song;Seo, Il Won;Shin, Jaehyun;Jung, Sung Hyun;Yun, Se Hun
    • Journal of Korea Water Resources Association
    • /
    • v.54 no.7
    • /
    • pp.495-507
    • /
    • 2021
  • With the recent industrial development, accidental pollution in riverine environments has frequently occurred. It is thus necessary to simulate pollutant transport and dispersion using water quality models for predicting pollutant residence times. In this study, we conducted a field experiment in a meandering reach of the Sum River, South Korea, to validate the field applicability and prediction accuracy of RAMS+ (River Analysis and Modeling System+), which is a two-dimensional (2D) stream flow/water quality analysis program. As a result of the simulation, the flow analysis model HDM-2Di and the water quality analysis model CTM-2D-TX accurately simulated the 2D flow characteristics, and transport and mixing behaviors of the pollutant tracer, respectively. In particular, CTM-2D-TX adequately reproduced the elongation of the pollutant cloud, caused by the storage effect associated with local low-velocity zones. Furthermore, the transport model effectively simulated the secondary flow-driven lateral mixing at the meander bend via 2D dispersion coefficients. We calculated the residence time for the critical concentration, and it was elucidated that the calculated residence times are spatially heterogeneous, even in the channel-width direction. The findings of this study suggest that the 2D water quality model could be the accidental pollution analysis tool more efficient and accurate than one-dimensional models, which cannot produce the 2D information such as the 2D residence time distribution.