• Title/Summary/Keyword: Bed change simulation

Search Result 85, Processing Time 0.029 seconds

Simulation of Change in Physical Habitat of Fish Using the Mobile Bed Model in a Downstream River of Dam (댐 하류 하천에서 하상변동 모델을 이용한 어류 물리서식처 변화 모의)

  • Kim, Seung Ki;Choi, Sung-Uk
    • Ecology and Resilient Infrastructure
    • /
    • v.2 no.4
    • /
    • pp.317-323
    • /
    • 2015
  • This study investigated the impact of the morphological change on a physical fish habitat in the downstream reach of a dam using long-term mobile bed simulation. The quasi-steady model was used for hydraulic simulation and the habitat suitability index model was applied for physical habitat simulation. For simulating long-term morphological change of the stream bed, The Exner equation was used. Sorting of bed material was also considered. The results of simulation showed that erosion and armoring process occurred in a reach downstream of the dam and change of physical habitat for Zacco platypus followed. These results indicate that channel morphology and substrate conditions effected the physical habitat for considering long-term investigation.

Rigorous dynamic simulation and determination of initial operating conditions for two-bed PSA processes (두 탑 PSA공정의 상세 동적모사 및 초기운전조건 결정)

  • Hwang, Deok-Jae;Moon, Il
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1997.10a
    • /
    • pp.1520-1523
    • /
    • 1997
  • A rigorous dynamic simulation was performed in binary gas mixture H$_{2}$/CO (70:30 vol.%) to determinate start-up operating conditions of PSA(Pressure Swing Adsorption) processes. The rigorous dynamic model for the PSA process contains an Ergun equation for expressing the pressure drop in a bed, and valve equations to compute the boundary pressure change of the bed. As the result of the continuous dynamic simulation of 100 operating cyles in various initial conditions, the unsteady-state appeared in the early period and the cyclic steady-state came out about 20th cycle in feed condition and vaccum condition, and 30th cycle in pure H$_{2}$ condition. As time goes by valve equations made change the pressure at each end of the bed in ressurization, countercurrunt-depressurization and pressure equalization steps. The H$_{2}$ purity and the recovery is 99.99% and 86.73% respectively, which is slightly higher than the experimental data. Main contributiion of this study includes supplying fundamental technologies of handling combined variables PSA processes by developing rigorous models.

  • PDF

Tumor bed volumetric changes during breast irradiation for the patients with breast cancer

  • Chung, Mi Joo;Suh, Young Jin;Lee, Hyo Chun;Kang, Dae Gyu;Kim, Eun Joong;Kim, Sung Hwan;Lee, Jong Hoon
    • Radiation Oncology Journal
    • /
    • v.31 no.4
    • /
    • pp.228-233
    • /
    • 2013
  • Purpose: The aim of this study was to evaluate changes in breast tumor bed volume during whole breast irradiation (WBI). Materials and Methods: From September 2011 to November 2012, thirty patients who underwent breast-conserving surgery (BCS) followed by WBI using computed tomography (CT) simulation were enrolled. Simulation CT scans were performed before WBI (CT1) and five weeks after the breast irradiation (CT2). The tumor bed was contoured based on surgical clips, seroma, and postoperative change. We retrospectively analyzed the factors associated with tumor bed volumetric change. Results: The median tumor bed volume on CT1 and CT2 was 29.72 and 28.6 mL, respectively. The tumor bed volume increased in 9 of 30 patients (30%) and decreased in 21 of 30 patients (70%). The median percent change in tumor bed volume between initial and boost CT was -5%. Seroma status (p = 0.010) was a significant factor in tumor bed volume reduction of 5% or greater. However, patient age, body mass index, palpability, T stage, axillary lymph node dissection, and tumor location were not significant factors for tumor bed volumetric change. Conclusion: In this study, volumetric change of tumor bed cavity was frequent. Patients with seroma after BCS had a significant volume reduction of 5% or greater in tumor bed during breast irradiation. Thus, resimulation using CT is indicated for exquisite boost treatment in breast cancer patients with seroma after surgery.

Parameter Calibration and Sensitivity Analysis for Numerical Modeling of Flow and Bed Changes near the Opening Gate for Sediment Release (배사구 유입부 흐름 및 하상변동 수치모의를 위한 매개변수 검정 및 민감도 분석에 관한 연구)

  • Jang, Eun-Kyung;Lim, Jong-Chul;Ji, Un;Yeo, Woon-Kwang
    • Journal of Environmental Science International
    • /
    • v.20 no.9
    • /
    • pp.1151-1163
    • /
    • 2011
  • The bed change analysis near the opening gate of a dam or weir to release deposited sediments have been conducted mostly using the numerical models. However, the use of unverified input parameters in the numerical model is able to produce the different results with natural and real conditions. Also, the bed changes near the opening gate of a dam or weir calculated with a numerical model could be varied depending on the geometry extent included the downstream area with supercritical flow in the model. In addition, the different time steps could provide different results in the bed change calculation, even though other conditions such as input parameters, geometries, and total simulation time were same. Therefore, in this study, hydraulic experiments were performed to validate the eddy viscosity coefficient which is the one of important input parameters in the RMA2 model and relevant to variation of simulation results. The bed changes were calculated using the SED2D model based on flow results calculated in the RMA2 model with the verified and selected eddy viscosity coefficient and also compared with experimental results. The bed changes near the opening gate were underestimated in the numerical model comparing with experimental results except only the numerical case without the modeling section of sediment release pipe and downstream area where the supercritical flow was produced. For the simulation of minimum time steps, different shapes of scour hole were produced in numerical and physical modeling.

Simulation of River Bed Change using GSTARS model (GSTARS 모형을 이용한 하상변동 모의)

  • Ahn, Sang-Jin;Yoon, Seok-Hwan;Yeon, In-Sung;Kwark, Hyun-Gu
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2002.10a
    • /
    • pp.297-300
    • /
    • 2002
  • Semi-two dimension numerical models were applied to study on the hydraulic and sedimentologic characteristics of upstream and downstream channel section in Dal stream. The feature of this paper is (1) to analyse the effects of bed changes by sediment transport formulas, (2) to analyse the effects of bed changes by stream tube. The simulation results of Meyer-peter and Muller formula for long-term bed changes are good when compared to the measured data.

  • PDF

Numerical Simulation of Bed Change at the Confluence of the Gamcheon and Mihocheon (합류부에서 하상변동 수치모의 연구: 미호천 및 감천 합류부를 대상으로)

  • Park, Moonhyung;Kim, Hyung Suk
    • Ecology and Resilient Infrastructure
    • /
    • v.6 no.4
    • /
    • pp.328-338
    • /
    • 2019
  • This paper presents the numerical simulations of future river bed changes using CCHE2D, a two-dimensional numerical model, for river confluences at the confluences of the Nakdong River and Gamcheon as well as Geum River and Mihocheon. The numerical simulations of future river bed changes were conducted for three years using hydrological data from August 30, 2012, to August 29, 2015 after the Four Major River Restoration Project. The simulation results demonstrated that river bed changes occurred actively near the confluence where sediment deposition was concentrated, resulting in the possibility of point bar formation. Through the numerical simulations, the characteristics of future river bed change was evaluated by investigating the characteristics of bed changes, average bed elevation changes, and the difference between deposition and erosion in the target section. The two-dimensional numerical model is expected to be used in the future to prepare effective stabilization plans for the tributary confluence.

An Analysis of Bed Change Characteristics by Bed Protection Work (바닥보호공 설치에 따른 하상변동 특성 분석)

  • Son, Ah Long;Kim, Byung Hyun;Moon, Bo Ram;Han, Kun Yeun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.4
    • /
    • pp.821-834
    • /
    • 2015
  • This study presents the analysis of flow and bed change characteristics considering bed protection work built on the immediate downstream of weir to protect river bed from scouring. The study area is 37km reach from Hyunpoong station to Masuwon station including Hapcheon- Changryoung multi-function weir in the Nakdong river. CCHE2D model is calibrated and validated for evaluating the flow and bed change characteristics during Typhoon Kompasu in 2010. Three simulation conditions are set up: Case 1 is a natural channel without installation of weir. Case 2 involves an installation of weir in the natural channel. Case 3 involves an installation of weir with bed protection in the natural channel. Flood frequency (50, 100 and 200yr) is applied to each scenario to analyze the effects of bed protection work. While the sediment rate is increased in the downstream of fixed gate and sluice-type gate, river bed scouring rate is increased in the downstream of lift-type gate in Case 2 comparing with the results of Case 1. The river bed scouring is not occurred in the immediate downstream of weir (~30m) due to the effect of bed protection, but larger amount of sediment is occurred in the downstream of weir (60m~) which the bed protection is not installed comparing with the results Case 1. Through the results of simulation considering bed protection work, this study would be helpful to expect bed change and operate the weir as well as manage.

An Analysis of Streambed Changes Downstream of Daecheong Dam

  • Seo, Hyeong-Deok;Jeong, Sang-Man;Kim, Lee-Hyung;Choi, Kyu-Ho
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.8 no.1
    • /
    • pp.103-108
    • /
    • 2008
  • Riverbed change is greatly influenced by artificial factors such as dam construction, gravel collection, and river improvement. This study simulated a long-term bed change based on the GSTARS3 model using actual data from the area downstream of the Geum River Daecheong Dam and compared the estimation with a section of the actual measurement. As a result, it was found that the section of the actual measurement was far lower than the result of the simulation in terms of long-term bed change. While the area downstream of Daecheong Dam displayed approximately an average of 2.29 m of streambed degradation on average while the upper stream area showed approximately 0.63 m of bed degradation over 24 years. In the simulation of the area downstream of Daecheong Dam based on the GSTARS3 model, similar bed degradation was observed. However, a great difference was detected between the result and the actual measurement. According to the cause analysis, the riverbed in the area downstream of Daecheong Dam has continuously degraded due to the dam construction and mass collection of gravel. The mass collection of gravel was the main cause of riverbed change. It was found that about 76% of all riverbed degradation was caused by the mass collection of gravel.

Sensitivity Analysis of Bed Changes for Different Sediment Transport Formulas Using the HEC-6 Model - The Lower Nakdong River (HEC-6 모형을 이용한 유사량 공식에 따른 하상변동 민감도 분석 - 낙동강 하류를 대상으로)

  • Jeong, Won-Jun;Ji, Un;Yeo, Woon-Kwang
    • Journal of Environmental Science International
    • /
    • v.19 no.10
    • /
    • pp.1219-1227
    • /
    • 2010
  • In this study, the sensitivity analysis of bed changes due to the various sediment transport equations have been conducted for 80 km reach of the Lower Nakdong River using the HEC-6 which is one dimensional numerical model. The bed elevation changes according to the different sediment transport formulas were compared and analyzed quantitatively. As a result of the numerical simulation, the final bed elevation calculated by Engelund and Hansen(1967), Ackers and White(1973), and Yang(1979) formulas was similar to one another in configuration. The bed change simulated by Engelund and Hansen(1967) were greatest among them, for example, 5.5 m deposition and 2.9 m erosion for 100 years. Also, in the case of Toffaleti (1969) equation, the maximum bed deposition of 8.04 m after 100 years was induced at the 73 km location upstream of the Nakdong River Estuary Barrage. Meyer-Peter-M$\ddot{u}$ller(1948) and Wilcock(2001) formulas produced the deposition only at the upstream end and there was little bed change in the downstream area. The unreal bed configuration of continuously up and down pattern was simulated by Laursen(1958) transport equation.

Numerical analysis of flow and bed change at a confluence of the Namhan River and the Seom River using a two-dimensional model (2차원 수치모형을 이용한 남한강과 섬강 합류부 구간의 흐름 및 하상변동 해석)

  • Park, Moonhyung;Kim, Hyung Suk;Baek, Chang Hyun
    • Journal of Korea Water Resources Association
    • /
    • v.51 no.12
    • /
    • pp.1273-1284
    • /
    • 2018
  • The flow and bed change were analyzed using the CCHE2D model, which is a two-dimensional numerical model, at a confluence of the Namhan River and Seom River where deposition occurs predominantly after the "Four Major Rivers Restoration Project." The characteristic of the junction is that the tributary of Seom River joined into the curved channel of the main reach of the Namhan River. The CCHE2D model analyzes the non-equilibrium sediment transport, and the adaptation lengths for the bed load and suspended load are important variables in the model. At the target area, the adaptation length for the bed load showed the greatest influence on the river bed change. Numerical simulation results demonstrated that the discharge ratio ($Q_r$) change affected the flow and bed change in the Namhan River and Seom river junction. When $Q_r{\leq}2.5$, the flow velocity of the main reach increased before confluence, thereby reducing the flow separation zone and decreasing the deposition inside the junction. When $Q_r$>2.5, there was a high possibility that deposition would be increased, thereby forming sand bar. Numerical simulation showed that a fixed sand bar has been formed at the junction due to the change of discharge ratio, which occurred in 2013.