• 제목/요약/키워드: Battery energy storage system (BESS)

검색결과 144건 처리시간 0.027초

태양광 발전 연계 수전해 시스템의 경제성 분석 (Techno-Economic Analysis of Water Electrolysis System Connected with Photovoltaic Power Generation)

  • 황순철;박진남
    • 한국수소및신에너지학회논문집
    • /
    • 제32권6호
    • /
    • pp.477-482
    • /
    • 2021
  • Hydrogen production, hydrogen production cost, and utilization rate were calculated assuming four cases of hydrogen production system in combination of photovoltaic power generation (PV), water electrolysis system (WE), battery energy storage system (BESS), and power grid. In the case of using the PV and WE in direct connection, the smaller the capacity of the WE, the higher the capacity factor rate and the lower the hydrogen production cost. When PV and WE are directly connected, hydrogen production occurs intermittently according to time zones and seasons. In addition to the connection of PV and WE, if BESS and power grid connection are added, the capacity factor of WE can be 100%, and stable hydrogen production is possible. If BESS is additionally installed, hydrogen production cost increases due to increase in Capital Expenditures, and Operating Expenditure also increases slightly due to charging and discharging loss. Even in a hydrogen production system that connects PV and WE, linking with power grid is advantageous in terms of stable hydrogen production and improvement of capacity factor.

제주지역 재생에너지 수용을 위한 HVDC 및 BESS 활용에 관한 연구 (A Study on HVDC and BESS Application for High Penetration of Renewable Energy Sources)

  • 곽은섭;민재현;정호철;문채주
    • 한국전자통신학회논문지
    • /
    • 제16권6호
    • /
    • pp.1339-1348
    • /
    • 2021
  • 재생에너지 출력제한은 송전용량과 전력계통 안정성 부족을 포함하여 다양한 원인이 있다. 제주도 지역에서는 태양광 및 풍력 발전설비의 증가로 이미 전력수요에 비해 공급이 많아지는 사례가 자주 발생하고 있으며, 이에 따라 풍력발전의 출력제한 횟수가 증가하고 있다. 본 연구에서는 제주도 전력공급의 핵심 역할을 담당하고 있는 HVDC(고전압 직류)와 BESS(배터리 에너지 저장장치) 설비를 활용하여 재생에너지의 효과적인 수용과 전력계통의 안정적 운영 방향을 찾는 것이다. 그리고 이 논문에서는 각 설비들의 실질적인 운전방안을 제시하고 향후 태양광 및 풍력 발전설비의 확대에 따른 육지 전력계통의 운영 방향을 제안한다.

OPAL-RT 기반의 Hardware-in-the-Loop Simulation (HILS) 시스템을 이용한 독립운전모드 마이크로그리드 시뮬레이션 (Islanded Microgrid Simulation using Hardware-in-the Loop Simulation (HILS) System based on OPAL-RT)

  • 유형준;김학만
    • 전기학회논문지
    • /
    • 제62권4호
    • /
    • pp.566-572
    • /
    • 2013
  • A microgrid is a small scale power system. The microgrid is operated in two operation modes, the grid-connected mode and the islanded mode. In the islanded mode, the frequency of a microgrid should be maintained constantly. For this, the balance between power supply and power demand during islanded mode should be met. In general, energy storage systems (ESSs) are used to solve power imbalance. In this paper, the frequency control effect of a Lithium-ion battery energy storage system (Li-ion BESS) has been tested on the hardware-in-the loop simulation (HILS) system environment.

풍력발전의 전력계통 동적 수용한계 산정 및 BESS 적용방안 분석 (Study on Calculation of Dynamic Penetration Limit of WTG and Applications of BESS in Power Systems)

  • Gwon, Han Na;Choi, Woo Yeong;Kook, Kyugn Soo
    • KEPCO Journal on Electric Power and Energy
    • /
    • 제1권1호
    • /
    • pp.29-32
    • /
    • 2015
  • 풍력발전기와 같은 신재생에너지원은 기존 동기화력발전기의 특성과 매우 다르기 때문에, 상정고장과 같은 가혹한 상황에서는 주파수 변동에 신속히 대응하지 못하므로 주파응답성능을 저하시킬 수 밖에 없다. 특히, 풍력발전의 수용률이 높은 상황에서 상정고장이 발생한 경우, 전력계통에 안정화를 위해서 풍력발전의 수용이 더욱 제한될 가능성이 잠재되어 있다. 이를 위해, 본 논문에서는 풍력발전의 전력계통 동적 수용한계를 산정하는 절차를 구현하고, 산출된 결과로부터 풍력발전의 동적 수용한계를 증대시키기 위한 BESS의 적용방안을 모색하였다.

Stand-Alone Wind Energy Conversion System with an Asynchronous Generator

  • Singh, Bhim;Sharma, Shailendra
    • Journal of Power Electronics
    • /
    • 제10권5호
    • /
    • pp.538-547
    • /
    • 2010
  • This paper deals with a stand-alone wind energy conversion system (WECS) with an isolated asynchronous generator (IAG) and voltage and frequency (VF) control feeding three-phase four-wire loads. The reference generator currents are estimated using the instantaneous symmetrical component theory to control the voltage and frequency of an IAG system. A three-leg voltage source converter (VSC) with an isolated star/delta transformer is used as an integrated VSC. An integrated VSC with a battery energy storage system (BESS) is used to control the active and reactive powers of the WECS. The WECS is modeled and simulated in MATLAB using the Simulink and the Sim Power System (SPS) toolboxes. The proposed VF controller functions as a voltage and frequency regulator, a load leveler, a load balancer and a harmonic eliminator in the WECS. A comparison is made on the rating of the VSC with and without ac capacitors connected at the terminals of an IAG. Simulation and test results are presented to verify the control algorithm.

가파도 마이크로 그리드에서의 카본 프리(Carbon-Free)를 위한 1MVA급 배터리 에너지 저장시스템 적용 및 실증 (The Application and Verification of the 1MVA Battery Energy Storage System for Carbon-Free in Micro-Grid of Gapa Island)

  • 서영거;손의권;정병창;이정민;최영준
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2014년도 추계학술대회 논문집
    • /
    • pp.93-94
    • /
    • 2014
  • 본 논문의 주제는 가파도 마이크로 그리드에 적용한 1MVA급 배터리 에너지 저장시스템(BESS-Battery Energy Storage System)을 소개하는 것이다. 에너지 저장장치가 디젤발전기와의 연계 및 독립운전 하여 탄소 배출 없이(Carbon-Free) 가파도 전체 부하에 전원을 공급하는 실증 사례를 살핀다.

  • PDF

Fuzzy Logic을 이용한 마이크로그리드의 독립운전 제어 (Control of Islanded Microgrid Using Fuzzy Logic)

  • 이흥석;박준호;구본길;김종율
    • 전기학회논문지
    • /
    • 제63권6호
    • /
    • pp.727-737
    • /
    • 2014
  • This paper presents the design of Fuzzy PI controller that is used at BESS(Battery Energy Storage System) charging and discharging process for islanded operation in microgrid. Most of the PI controllers have fixed PI gains, but real-time updated gains are applied to PI controller using Fuzzy logic in this paper. The performances of suggested Fuzzy PI controller are simulated by PSCAD/EMTDC. As a result, output characteristics of ESS applied real-time updated gains to PI controller are faster than those of using fixed gains.

산업용 수용가의 에너지저장장치 적용 (Application of Energy Storage System for Industrial Customer)

  • 홍종석;채희석;강병욱;김태형;김재철
    • 전기학회논문지
    • /
    • 제64권7호
    • /
    • pp.992-998
    • /
    • 2015
  • The ESS is composed of Battery Package, PCS(Power Conditioning System) Package, BCU(BESS Control Unit). In Jeju smart grid test-bed, we have developed a business model by ESS power system, renewable energy, transportation, such as customers, and have demonstrated above things. We have analyzed the EMS(Energy Management System) model of KPX where manages supply and demand of domestic electrical power system. We modified and launched EMS for microgrid but the cost was expensive and the system was large size. For releasing this system from industry as a whole, it is imperative to develop PMS(Power Management System) for microgrid. However, the cost of EMS for microgrid is expensive, some systems because it is a large development of the all of the first fruits in urgent PMS(Power Management System) for microgrid to be used in industry in general. Therefore, in this paper, we propose the ESS model considering the power systems characteristics and extensibility in korea. and also we propose the PMS to manage the ESS systems.

태양광 연계형 배터리 에너지 저장장치의 최적 용량 산정 (A Study of Optimum Capacity of Battery Energy Storage System Linked PV)

  • 백민규;박종배;손성용;신하상;박용기
    • 전기학회논문지
    • /
    • 제67권1호
    • /
    • pp.38-45
    • /
    • 2018
  • In September 2016, the government decided to apply a REC 5.0 weighting to solar-battery ESS to increase the supply of renewable energy. In this paper, we calculated the optimal capacity of battery ESS which maximizes the revenue when solar is linked with battery ESS. In the case study, the optimal capacity was calculated by applying the conservative REC price, and we studied sensitivity analysis about battery price and real-time REC price.

스마트그리드용 BESS 시험용 대용량 시험설비 구축 및 이용 (High Power Test-Bench using for Test of BESS for a Smart-Grid)

  • 한종희;임창진;김광섭;이명준;권병기
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2011년도 추계학술대회
    • /
    • pp.163-164
    • /
    • 2011
  • 본 논문은 스마트그리드용 배터리 에너지 저장장치(Battery Energy Storage System, BESS)와 같은 대용량 전력변환장치의 개발 및 성능검증 시험에 사용된 대용량 시험설비에 대해 기술하였다. 대용량 시험설비는 모의 수 배전 계통 설비, DC Power Supply, 부하설비로 구성되어 있다. 모의 수 배전 설비는 개발 시험규격과 계통 상황을 모의하고, DC Power Supply는 연료전지나 배터리 등의 DC Source, 수동부하장치는 전력 변환 설비의 각종 부하들을 모의하기 위해 설계 제작하여 스마트그리드용 2MVA BESS의 성능검증 시험에 이용하고 있다.

  • PDF