• Title/Summary/Keyword: Bang System

Search Result 1,724, Processing Time 0.035 seconds

A Study on the Computerizing of the Site Planning and Design (단지조성업무의 전산시스템화에 관한 연구)

  • Bang, Cheon-Ho;Park, Hong-Gi
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.1 no.2 s.2
    • /
    • pp.207-221
    • /
    • 1993
  • After characters of data were classified site planning and design, structure modelling was presented for computer system in site planning and design. Particularly, this study contributes to increase utilization site planning and design through result of estimation computer system in the land suitable analysis and soil design.

  • PDF

A Study on Implementation of Real Time Voiced/Unvoiced/Silence Discrimination System (실시간 유성음 무성음 무음 식별장치의 구성에 관한 연구)

  • Bang, Man Won;Choi, Kap Seok
    • Journal of the Korean Institute of Telematics and Electronics
    • /
    • v.23 no.4
    • /
    • pp.565-570
    • /
    • 1986
  • In this paper, the implementation of a voiced/unvoiced/silence discrimination system is presented. The algorithm is based on the zerocrossing rate and the spectral energy distribution of speech. In measuring zerocrossing rate, a new frequency-to-voltage conversion type interval filter is used. Expermental results show that with the proposed algorithm the effect of impulse noise in voiced intervals can be removed.

  • PDF

Stability of Saturation Controllers for the Active Vibration Control of Linear Structures (선형 구조물의 능동 진동 제어를 위한 포화 제어기의 안정성)

  • Moon, Seok-Jun;Lim, Chae-Wook;Huh, Young-Chul
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.10 no.6 s.52
    • /
    • pp.93-102
    • /
    • 2006
  • Control input's saturation of active control devices for large structures under large external disturbances are often occurred. It is more difficult to obtain the exact values of mass and stiffness as structures are higher. The modelling errors between mathematical models and real structures must be also included as parameter uncertainties. Therefore, in active vibration control of civil engineering structures like buildings and bridges, the robust saturation controller design method considering both control input's saturation and parameter uncertainties of system is needed. In this paper, stabilities of linear optimal controller LQR, modified bang-bang controller, saturated sliding mode controller, and robust saturation controller among various controllers which have been studied and applied to active vibration control of buildings are investigated. Especially, unstable phenomena of the LQR, the modified bang-bang controller and the saturated sliding mode controller when the control input is saturated or parameter uncertainties exist are presented to show the necessity of the robust saturation controller. The robust stability of the robust saturation controller are shown through a numerical example of a 2DOF linear vibrating system and an experimental test of the two-story structure with an active mass damper (AMD).

Performance Evaluation of Korean Power System for Developing the Planning Standards (계통계획기준 수립을 위한 한전계통의 성능평가)

  • Kook, Kyung-Soo;Oh, Tae-Kyoo;Kim, Tai-Hyun;Kim, Hak-Man;Bang, Min-Jae;Lee, B.
    • Proceedings of the KIEE Conference
    • /
    • 2001.07a
    • /
    • pp.203-205
    • /
    • 2001
  • This paper is part of an ongoing project of KEPCO; 'A Study on Criteria and Standards for Transmission System Planning', The objective of this project is to develop the standards and procedures for transmission system planning. This involves reviewing published literatures, other documents of existing criteria and procedures, and various case studies of advanced countries which are already under the competitive electricity industry. This paper presents the result of evaluating Korean Power System as a pre-study for developing the Planning Standards of Korean Power System. For this, WSCC/NERC's performance criteria for planning transmission system, and KEPCO's 'Long Term Transmission System Planning Criteria' are considered. By doing this, the level of performance criteria which should be applied to Korean Power System and the detailed procedures which would be used in system test were reviewed.

  • PDF

Development of Expert System for Operation in Distribution Systems with Graphic Integrated Environments (그래픽 통합 환경을 갖춘 배전계통 운용 전문가 시스템 개발)

  • Kim, Se-Ho;Seo, Ki-Sung;Kim, Jeong-Keun;Park, Byoung-Youn;Woo, Kwang-Bang
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.41 no.9
    • /
    • pp.960-972
    • /
    • 1992
  • This paper deals with the development of expert system in distribution system which combined with graphic user interface. The proposed expert system can recognize and adjust to the system change, and includes the rule bases of security monitoring. Also it provides load transfer algorithm for efficient load distribution. The graphic user environment for expert system is implemented in the mouse-oriented user interface with overlapped window functions and pull-down menus. Therefore, the developed graphic integrated expert system can afford to assist system operators very conveniently through the various graphic function in proposing an optimal plan of load transfer for fault restoration and outage schedule.

Design of HCBKA-Based TSK Fuzzy Prediction System with Error Compensation (HCBKA 기반 오차 보정형 TSK 퍼지 예측시스템 설계)

  • Bang, Young-Keun;Lee, Chul-Heui
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.6
    • /
    • pp.1159-1166
    • /
    • 2010
  • To improve prediction quality of a nonlinear prediction system, the system's capability for uncertainty of nonlinear data should be satisfactory. This paper presents a TSK fuzzy prediction system that can consider and deal with the uncertainty of nonlinear data sufficiently. In the design procedures of the proposed system, HCBKA(Hierarchical Correlationship-Based K-means clustering Algorithm) was used to generate the accurate fuzzy rule base that can control output according to input efficiently, and the first-order difference method was applied to reflect various characteristics of the nonlinear data. Also, multiple prediction systems were designed to analyze the prediction tendencies of each difference data generated by the difference method. In addition, to enhance the prediction quality of the proposed system, an error compensation method was proposed and it compensated the prediction error of the systems suitably. Finally, the prediction performance of the proposed system was verified by simulating two typical time series examples.

Basic Design of CBTC System Based on ERTMS/ETCS (ERTMS/ETCS 기반의 CBTC 시스템 기본설계)

  • Yang, Chan-Seok;Lim, Jae-Shik;Um, Jung-Kyou;Han, Jae-Mun;Bang, Yung;Kim, Hyoung-Hoon
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.629-632
    • /
    • 2007
  • Communications Based Train Control(CBTC) is a continuous, automatic train control system utilizing high-resolution, train location determination independent of track circuits; continuous, high capacity, bi-directional train-to-wayside data communications; and trainborne and wayside processors capable of implementing vital functions. In this paper, we present a basic design of CBTC system based on ERTMS/ETCS specifications. The basic design is composed of system requirements analysis, system functional analysis, system architectural design, sub-system requirements analysis, sub-system functional analysis. Each deliverable has been produced according to a development process based on UML/SysML.

  • PDF

Operating Characteristics of Pilot Scale Multi-Staged Waste Pyrolysis & Gasification System (파일럿 규모의 폐기물 다단열분해 가스화시스템의 운전특성)

  • Lee, Jeong-Woo;Yu, Tae-U;Bang, Byeong-Ryeol;Moon, Ji-Hong;Lee, Jae-Uk;Park, Sang-Shin;Kim, Nack-Joo
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2009.11a
    • /
    • pp.331-335
    • /
    • 2009
  • A novel multi-staged waste pyrolysis & gasification system of pilot scale (~1 ton/day) is designed and constructed in Korea Institute of Industrial Technology. The pyrolysis & gasification system is composed of pyrolysis & gasification system, syngas reformer, syngas cleaning system, gas engine power generation system and co-combustion system. For each unit process, experimental approaches have been conducted to find optimal design and operating conditions. As a result, We can produce syngas with a calorific value of ~4000 kcal/$Nm^3$ and cold gas efficiency of the system is more than 55 % in case of waste plastic and oxygen as a gasifying agent.

  • PDF

An Implementation of Remote Monitoring and Control System using CMOS Image sensor (CMOS 이미지 센서를 이용한 원격지 화상 감시 및 제어 시스템 구현)

  • Choi, Jae-Woo;Ro, Bang-Hyun;Lee, Chang-Keun;Hwang, Hee-Young
    • Proceedings of the KIEE Conference
    • /
    • 2003.11c
    • /
    • pp.653-656
    • /
    • 2003
  • We have designed embedded web sewer system and ported Linux operating system version 2.4.5 at our system. And then We implemented to control and monitor widely separated hardware and implemented to monitor widely separated image using CMOS image sensor HV7131B. Web server is the Boa web server with General Public License. We designed for this system using of Intel's SA1110 ARM core base processor and connecting input and output device at GPIO port of SA1110. Device driver of General purpose I/O for Embedded Linux OS is designed. And then the application program controlling driver is implemented to use of common gate interface C language. User is available to control and monitor at client PC. This method have benefit to reduce the Expenditure of hardware design and development time against PC base system and have various and capacious application against firmware base system.

  • PDF

A study on the integrated onboard signaling system for the next-generation high-speed rail (차세대 고속철도 통합 차상신호시스템 구조에 대한 고찰)

  • Bang, Yung;Kim, Hyung-Hoon;Yoon, Yeong-Hwan;Cho, Shin-Young;Cho, Yong-Gee
    • Proceedings of the KSR Conference
    • /
    • 2009.05b
    • /
    • pp.631-637
    • /
    • 2009
  • The railway signaling systems operated in Korea are ATS system, ATP system for the low speed line and ATC system for the high speed line. The integrated onboard signaling system for the next-generation high-speed rail is progressed as the need for reducing a driver's load and controlling a train properly with the automatic translation of the onboard signaling system according to a trackside signaling system. In this paper the configuration of the integrated onboard signaling system and the interfaces of the subsystems is presented.

  • PDF