• Title/Summary/Keyword: Ballast

Search Result 1,044, Processing Time 0.024 seconds

Physicochemical Properties of Indoor Particulate Matter Collected on Subway Platforms in Japan

  • Ma, Chang-Jin;Matuyama, Sigeo;Sera, Koichiro;Kim, Shin-Do
    • Asian Journal of Atmospheric Environment
    • /
    • v.6 no.2
    • /
    • pp.73-82
    • /
    • 2012
  • This study was aimed to thoroughly estimate the characteristics of indoor particulate matter (PM) collected on subway platforms by the cooperative approach of semi-bulk and single particle analyses. The size-resolved PM and its number concentration were measured on the platform in a heavily traveled subway station in Fukuoka, Japan. Particle Induced X-ray Emission (PIXE) and micro-PIXE techniques were applied to the chemical analyses of semi-bulk and single particle, respectively. There was the close resemblance of timely fluctuation between PM number concentration and train service on the third basement floor (B3F) platform compared to the second basement floor (B2F) and its maximum level was marked in rush hour. Higher number counts in large particles ($>1{\mu}m$) and lower number counts in fine particles ($<1{\mu}m$) were shown on the platform compared to an above ground. PM2.5 accounted for 58.2% and 38.2 % of TSP on B3F and on B2F, respectively. The elements that were ranked at high concentration in size-resolved semi-bulk PM were Fe, Si, Ca, S, and Na. The major elements tending to have more elevated levels on B3F than B2F were Fe (4.4 times), Ca (17.3 times), and Si (46.4 times). Although concentrations were very low, Cr ($11.9ng\;m^{-3}$ on B3F, $2.4ng\;m^{-3}$ on B2F), Mn ($3.4ng\;m^{-3}$ on B3F, $0.9ng\;m^{-3}$ on B2F), and Pb ($0.6ng\;m^{-3}$ on B3F, $1.6ng\;m^{-3}$ on B2F) were detected from PM2.5. Individual PM was nearly all enriched in Fe with Si and Ca. Classifying and source profiling of the individual particles by elemental maps and particle morphology were tried and particles were presumably divided into four groups (i.e., train/rail friction, train-rail sparking, ballast/abrasive, and cement).

A Conceptual Design on Training Simulator of the Special Railway Vehicle for Multiple Tie Tamper (궤도보수 특수철도차량 탬퍼 모의훈련연습기의 개념설계)

  • Ahn, Seung-Ho;Kang, Jeong Hyung;Kim, Chul Su
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.10
    • /
    • pp.430-436
    • /
    • 2018
  • Special railway vehicles for track maintenance are equipped with a tamping device that adjusts various track trajectories to reduce the vibration of rolling stock and improve ride quality during trains passing over a track. The development of a simulator that can confirm the error of the actual tamping work is important for reducing human error in the linearization of the track misalignment. In this study, to improve the reality and training effect of conventional 2D simulator, 3D simulator modeling was implemented for tamping work of special railway vehicles in virtual space. The problem of buffering during high screen quality of tamping work was solved using the Unwrap UVW mapping technique of a low polygon extracted from high quality polygon modeling. The human error in the training of the tamping work was detected by the principle of circle and square collision when the tamping tyne and the sleeper collided. In addition, vibration of the driving chair was generated at the same time as the collision, and the number of the sleeper strikes is displayed on the simulator exercise screen. Owing to the scattering of railway ballast protruding from the sleepers, which had a serious effect on the safety of the vehicle, the gravel bouncing effect of the tamping unit was applied.

A study on the Vibration Reduction of the Commercial High-speed Train (운영 중인 고속열차의 진동저감에 관한 연구)

  • Jeon, Chang-Sung;Choi, Sunghoon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.11
    • /
    • pp.697-704
    • /
    • 2017
  • This study was carried out to investigate and alleviate the vibration problem of commercial high-speed trains. First, the measurement of the carbody vibration was performed, in order to determine the vibration level of the high-speed train. The measurement result showed that the vibration level of the driver cab was higher than that of the passenger car and that the vibration became bigger toward the trailing end of the train. The vertical vibration of the driver cab and passenger car was larger than the transverse vibration, and the maximum value of the vibration in the ballast section was larger than that in the concrete section. A dynamic analysis was carried out to improve the vibration of the KTX-Sancheon train. The results of the analysis showed that it is necessary to reduce the vibration of the driver cab and both ends of the passenger cars. To reduce the vibration of the driver cab, it was recommended that the stiffness of the secondary coil spring be reduced and the damping coefficient of the secondary vertical damper be increased. It was found that the failure of the suspension system could be the origin of the vibration problem of the high-speed train. The proper management of wheel wear plays an important role in the improvement of the operation efficiency and reduction of the carbody vibration of high-speed trains, and research is underway to change the present wheel profile to increase the mileage between wheel turning.

Dynamic analysis of slack moored spar platform with 5 MW wind turbine

  • Seebai, T.;Sundaravadivelu, R.
    • Ocean Systems Engineering
    • /
    • v.1 no.4
    • /
    • pp.285-296
    • /
    • 2011
  • Spar platforms have several advantages for deploying wind turbines in offshore for depth beyond 120 m. The merit of spar platform is large range of topside payloads, favourable motions compared to other floating structures and minimum hull/deck interface. The main objective of this paper is to present the response analysis of the slack moored spar platform supporting 5MW wind turbine with bottom keel plates in regular and random waves, studied experimentally and numerically. A 1:100 scale model of the spar with sparD, sparCD and sparSD configuration was studied in the wave basin ($30{\times}30{\times}3m$) in Ocean engineering department in IIT Madras. In present study the effect of wind loading, blade dynamics and control, and tower elasticity are not considered. This paper presents the details of the studies carried out on a 16 m diameter and 100 m long spar buoy supporting a 90 m tall 5 MW wind turbine with 3600 kN weight of Nacelle and Rotor and 3500 kN weight of tower. The weight of the ballast and the draft of the spar are adjusted in such a way to keep the centre of gravity below the centre of buoyancy. The mooring lines are divided into four groups, each of which has four lines. The studies were carried out in regular and random waves. The operational significant wave height of 2.5 m and 10 s wave period and survival significant wave height of 6 m and 18 s wave period in 300 m water depth are considered. The wind speed corresponding to the operational wave height is about 22 knots and this wind speed is considered to be operating wind speed for turbines. The heave and surge accelerations at the top of spar platform were measured and are used for calculating the response. The geometric modeling of spar was carried out using Multisurf and this was directly exported to WAMIT for subsequent hydrodynamic and mooring system analysis. The numerical results were compared with experimental results and the comparison was found to be good. Parametric study was carried out to find out the effect of shape, size and spacing of keel plate and from the results obtained from present work ,it is recommended to use circular keel plate instead of square plate.

Evaluation of Dynamic Stability of Precast Floating Slab Track with Vehicle-Track Interaction Analysis (차량-궤도 상호작용 해석을 통한 사전 제작형 플로팅 슬래브 궤도의 동적 안정성 검토)

  • Jang, Dongdoo;Kim, Jin-Ho;Kwon, Se-Gon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.3
    • /
    • pp.562-568
    • /
    • 2017
  • A precast floating slab track with a 5m slab panel and installed with isolators is proposed to solve the noise and vibration problem at existing elevated railway stations. Thus, the construction can be carried out rapidly without interrupting the train operation. However, dynamic instability problems may be caused by repeated discontinuities in track due to the short slab panel length and excessive rail displacement due to the inherent operation mechanism of a floating system in reducing the vibration. Furthermore, the difference of the supporting stiffness at the transition between the floating track and ballast track may raise problems. In this study, the assessment factors to evaluate the dynamic stability of the precast floating slab track are presented and assessed with the vehicle-track interaction analysis. Through the analysis, all values relevant to the stability at the floating track section are found to be acceptable, and the slab panels at the transition section are designed to satisfy the stability.

Evaluation on the Applicability of the Conventional Roadbed Stiffness for High Speed Concrete Track (일반철도 노반 강성조건에서의 고속철도용 콘크리트 궤도의 적용성 검토)

  • Lee, Jin Wook;Lee, Seong Hyeok;SaGong, Myung;Lyu, Tae Jin
    • Journal of the Korean Society for Railway
    • /
    • v.16 no.1
    • /
    • pp.40-46
    • /
    • 2013
  • Based on Korean railway design standards, the thicknesses of the reinforced roadbeds of conventional and high speed railways are different, and so too, for the size distribution of the ballast particles. Accordingly, considerable cost would be required to increase operating speeds of conventional lines, in particular related to changing from a ballasted track system to a ballastless one. In this study, applicability of a roadbed which supports conventional ballasted track, for use as a ballastless track for a high speed rail line was examined. A reinforced roadbed for a conventional railway is 20cm thick, and the type of material used for a conventional reinforced roadbed is M-40 (crushed gravel for road embankments). A dynamics test was conducted to evaluate the occurrence of the permanent settlement of the track substructure. These results suggest that, without changes to the track substructure, an operational speed of 400km/h is feasible with a ballastless track. This result; however, is from laboratory experiments. Further studies, such as numerical analyses or field validation, are required.

A Dynamic Analysis of PSC Box Bridge Varying Span Lengths for Increased Speeds of KTX (고속철 속도변화에 대한 PSC박스 교량의 경간길이 별 동적해석)

  • Oh, Soon Taek;Lee, Dong Jun;Shim, Young Woo;Yun, Jun Kwan
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.15 no.4
    • /
    • pp.204-211
    • /
    • 2011
  • A dynamic analysis procedure is developed to provide a better estimation of the dynamic responses of bridge during the passage of high speed railway vehicles. Particularly, a three dimensional numerical model including the structural interaction between high speed vehicles, bridges and railway endures to analyse accurately and evaluate with in-depth parametric studies for dynamic responses of various bridge span lengths running KTX railway locomotive up to increasing maximum speed(450km/h). Three dimensional frame element is used to model the simply supported pre-stressed concrete (PSC) box bridges for four span lengths(40~25m). Track irregularity employed as a stationary random process from the given spectral density functions and irregularities of both sides of the track are assumed to have high correlation. The high-speed railway vehicle (KTX) is used as 38-degree of freedom system. Three displacements (Vertical, lateral, and longitudinal) as well as three rotational components (Pitching, rolling, and yawing) are considered in the 38-degree of freedom model. The dynamic amplification factors are evaluated by the developed procedure under various traveling conditions, such as track irregularity camber, train speed and ballast. The dynamic analysis such as Newmark-${\beta}$ and Runge-Kutta methods which are able to analyse considering the dynamic impact factors are compared and contrasted.

A Study on Coupling Coefficient Between Rail and Reinforcing Bars in Concrete Slab Track (콘크리트 슬래브궤도에서 레일과 철근 사이의 결합계수에 대한 연구)

  • Kim, Min-Seok;Lee, Sang-Hyeok;Lee, Jong-Woo
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.3
    • /
    • pp.405-411
    • /
    • 2009
  • Railway signaling system in a rapid transit using the ATC system the approved a speed limit to a train and a part of signaling system in a metro approved a distance which is possible to move. Referring to the way of transmitting train control information, there are the one transmitting it to the on-board system of a train using the direct track, the another transmitting it establishing an instrument, and the other transmitting an instrument by a railway track. The one is the method using the direct track as a conductor for composing the part of the track and attaining the information controlling a train by transmitting a signal to the track. It is used for the high-speed railway and the subway. The method using the track attains information by transmitting it to returned information, and the on-board system of a train attains it by magnetic coupling. Because many reinforcing bars on the concrete slab track are used, interaction between a rail and a reinforcing bar that is not produced on ballast track is made. Due to the interaction, the electric characteristic of rail is changed. In the current paper, we numerically computed the coupling coefficient between the rail and the reinforcing bar based on the concrete slab track throughout the model related to the rail and the reinforcing bar using the concrete slab track that is used in the second interval of the Gyeongbu high-speed railway, and we defined the coupling coefficient not changed in the electric characteristic of rail in the condition that there is no interaction between the rail and the reinforcing bar.

Study for Progress Rate of Standard Deviation of Irregularity Based on Track Properties for the Railway Track Maintenance Cycle Analysis (궤도 유지보수 주기 예측을 위한 구간 특성에 따른 궤도틀림 표준편차 진전정도 분석)

  • Jeong, Min Chul;Kim, Jung Hoon;Lee, Jee Ha;Kang, Yun Suk;Kong, Jung Sik
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.16 no.3
    • /
    • pp.31-40
    • /
    • 2012
  • The irregularity of railway track affects not only the comfort of ride such as noise or vibration but also the safety of train operation. For this reason, it is an interesting research area to design a reliable and sustainable railway track system and to analyze the train movement mechanism based on systematic approaches considering reasons of track irregularity possible in a specific local environment. Irregularity data inspected by EM-120, an railway inspection system in Korea includes unavoidable incomplete and erratic information, so it is encountered lots of problem to analyse those data without appropriate pre-data-refining processes. In this research, for the efficient management and maintenance of railway system, progress rate of standard deviation of irregularity is quantified. During the computation, some important components of railways such as rail joint, ballast, roadbed, and fastener have been considered. Probabilistic distributions of irregularity growth with respect to time are computed to predict the remaining service life of railway track and to be adapted for the safety assessment.

Hull Form Development of an AFRAMAX Tanker with a Composite Stern Frameline Concept (복합선미선형 개념에 의한 AFRAMAX형 유조선 선형의 개발)

  • Ho-Chung Kim;Chun-Ju Lee;Su-Hyung Kim
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.28 no.2
    • /
    • pp.1-11
    • /
    • 1991
  • A hull form for an Aframax tanker whore form parameters cover the values of $C_B{\simeq}0.8,\;L/B{\simeq}5.5\;and\;B/d{\simeq}3.5$ has been developed by applying a composite stern frameline concept and its excellent performance has been evaluated through a series of model tests at the Korea Research Institute of Ships and Ocean Engineering. The tests showed that this concept was very much promising in the cases of wide breadth and shallow draught vessels and suitably applicable to the stern frameline shape. For the comparison, a hull form developed by Japanese 'H' yard has been selected and the performances of two hull forms were evaluated by model tests and theoretical calculations. The comparison shows that Daewoo hull form requires less effective power by 10% and less delevered power by 5-6% at both full load and ballast conditions. In addition, it is suggested that Hushes method can give better correlationthan Froude method because the full scale resistance extrapolated by Froude method would be very much optimistic in case of the hull form with very low value of form factor.

  • PDF