• Title/Summary/Keyword: BPR

Search Result 210, Processing Time 0.031 seconds

The Phased Model of Success Factors in BPR Implementation for Public Corporations (공기업에서의 BPR 실행 성공요인에 관한 단계적 모형)

  • Kim, Sang-Hoon;Kim, Chang-Ryeol;Choi, Jeom-Ki
    • Journal of Information Technology Services
    • /
    • v.4 no.2
    • /
    • pp.1-22
    • /
    • 2005
  • The object of this study is to elicit major success factors along with the phases of implementing the BPR in case of public corporations. To obtain the goal of this research, (1) this study reviews and integrates the major previous BPR studies and shows critical success factors of implementing BPR projects coincided with the characteristics of the public organizations. (2) This study has analyzed and arranged the details of BPR projects of public corporations in South Korea through the literature survey, the questionnaire and the interview. (3) This study classifies 40 critical success factors which were identified in existing studies into ones belonging to 3 phases of BPR projects implementation: Introduction Phase, Execution Phase and Stabilization Phase. (4) This study has tested the relation between critical success factors on each stage of BPR projects implementation and the performance variables. It has proven that there is the statistically significant correlation between the success factors and the performance. The findings of this study are thought not only to be useful as a practical guideline in carrying out BPR project Implementation but also to provide significant basis for constructing the theoretical framework of effective BPR project implementation strategy.

The Concurrent Processing Methodology of BPR and Information System Building (BPR과 정보시스템 구축을 동시 병행 수행하는 방법론)

  • Han, Kwang-Shin;Park, Man-Gon
    • Journal of Korea Multimedia Society
    • /
    • v.20 no.7
    • /
    • pp.1073-1089
    • /
    • 2017
  • Changes in the business environment and increased competitiveness have led many companies to consider Business Process Reengineering(BPR) as a means to improve performance. However, while some BPR projects have been successful among the many companies that have performed BPR, most of the reengineering efforts have been deemed unsuccessful as the project failed. There are many answers to this, but the most important point is that the effective linkage between process innovation and information system construction is insufficient. Even if the reform of consciousness is carried out through the promotion of management innovation activities such as BPR, and the process is improved, management infrastructure can not be continuously maintained if infrastructure, especially information system, is not built up to support it. In this paper, we propose BPR and information system combining methodology for successful BPR execution and information system construction, and describe the result of BPR consulting performance when constructing information system and compare the improvement of failure risk factor. In addition, we present the case through the case of K company, and finally present customer satisfaction through post evaluation after completion of K company information system construction project implementation.

BPR과 ERP시스템 구현의 동시화 추진전략에 관한 연구

  • 서효원;최발근
    • Proceedings of the CALSEC Conference
    • /
    • 1998.10a
    • /
    • pp.163-173
    • /
    • 1998
  • Many Companies have expected that BPR and ERP implementation could keep up with changes in business management and information technology in Mega-competition era. But we cannot expect the performance improvement of enterprises without conjunction of BPR and ERP implementation This paper points out the problems of BPR & ERP implementation and present solutions to problems by the BPR using ERP system and the concurrent implementation of BPR and ERP.

  • PDF

비즈니스 프로세스 리엔지니어링과 정보기술을 동시연계시키는 방법론

  • 권오훈
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1998.10a
    • /
    • pp.294-297
    • /
    • 1998
  • BPR에 있어서 다른 경영혁신 기법이나 모든 사회적 활동에 공통적인 요소 즉 인간적, 정치적, 조직행태적 요소를 제외하면 재설계된 프로세스를 실세계에 구현 시키는 정보전략계획, 정보시스템 개발, 정보시스템 인프라스트럭춰 구축등 정보기술이 가장 핵심적인 요소가 된다 본 논문에서는 BPR 프로젝트의 성공적인 수행을 위한 방법론으로서 동시공학적 BPR을 제시한다. 컨커런트 BPR은 BPR과 IT를 동시 연계시키는 방법론과 BPR과 IT구현 사이의 커다란 단절을 이어주는 모델을 제시한다. 이렇게 함으로써 BPR의 자리 매김을 다시 하고 BPR을 간접비 절감, 인원과 조직의 축소, 생산성 향상운동의 일환으로 이해 할 것이 아니라 기업의 근본적 변혁 매니지먼트의 핵심기법으로서 부서를 넘어선 회사전체, 나아가 그 회사가 속한 가치 시스템(Value System), Supply Chain에서 고객을 포함한 모든 이해 관계자의 가치증진을 추구하는 것으로 받아 들여야 함을 강조한다.

  • PDF

BRAWII: Business Process Modeling Tool for BPR (BRAWII: BPR을 위한 업무흐름모형과 도구)

  • 박성주;김한섭;김상구;한동욱
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1998.10a
    • /
    • pp.289-293
    • /
    • 1998
  • Two reasons for the low success rate of the practical implementation of BPR are the lack of good models and consideration of information system development stage in a BPR project. This paper suggests an Integrated Business Process Model (IBPM), which incorporates two distinct but interrelated points of view: form and business process. By integrating the form model with the business process model, the IBPM has advantages in performing BPR projects; it helps to build the model, to analyze and redesign business processes, and to do requirement analysis of information systems. This paper also suggests a new BPR supporting tool, BRAWII(Business Reengineering Assistance Workbench version 2.0). BRAWIIsupports IBPM and manages full stages of BPR project. In the design of BRAWII, the linkage between results of a BPR project and requirements for information system development is considered.

  • PDF

Analysis of QTLs Related to Resistance to Brown Planthopper in Rice (DH 집단을 이용한 벼멸구 저항성 연관 QTLs 분석)

  • Kim, Suk-Man;Qin, Yang;Sohn, Jae-Keun
    • Korean Journal of Breeding Science
    • /
    • v.41 no.3
    • /
    • pp.236-243
    • /
    • 2009
  • This study was conducted to develop a japonica-type rice cultivar with brown planthopper (BPH) resistance using DNA markers. A doubled haploid (DH) population consisting of 120 pure-lines was established by anther culture of $F_1$ hybrids between 'Samgang', a Tongil type BPH resistance cultivar, and 'Nagdong', a japonica cultivar. To determine the map position of genes responsible for BPH resistance in rice, a genetic map was constructed based on 120 DH lines. A total of 162 molecular markers were classified into 12 linkage groups, covering 1,884 Kosami centimorgan (cM) with an average of 11.6 cM. Five QTLs (qBPR3, qBPR6, qBPR7, qBPR8, and qBPR12) associated with BPH resistance were identified and mapped on chromosomes 3, 6, 7, 8, and 12, respectively, using the genetic map constructed in this study. To analyze the relationship between BPH resistance and agronomic traits, a total of eight QTLs related to the agronomic traits were detected on 12 rice chromosomes. In an analysis of relationships, three QTLs (qBPR3, qBPR7, and qBPR8) showed a linkage with tested agronomic traits. A QTL (qBPR3) located on chromosome 3 (RM282-3023) was closely linked to culm length (qCL3). The QTL (qBPR8) for BPH resistance on the short arm of chromosome 8 also overlapped the region detected in culm length (qCL8).

A Dual-factors Analysis of BPR Success Factors (리엔지니어링 성공요인의 이원론적 분석)

  • Juhn, Sung-Hyun;Jeong, Seung-Ryul;Bae, Jun-Bum
    • Asia pacific journal of information systems
    • /
    • v.11 no.2
    • /
    • pp.205-221
    • /
    • 2001
  • The previous BPR success factor research assumes that a success factor is responsible for both the success and failure of the BPR implementation. This paper proposes that a BPR success factor is not necessarily a failure factor, i.e., success and failure of BPR implementation are two distinct phenomena that possess different sets of causal factors. The paper also proposes that the factors are different in terms of the degree and type of influence they exert on the BPR implementation. An empirical research was conducted to validate the propositions. The research results indicate that the BPR success and failure have different causal factor sets, and that the factor influence manifests in different realms and domains. The implications of the research are discussed at the end.

  • PDF

Factors Influencing BPR Implementation : An Empirical Study of Critical Success Factors and Resistance Management (리엔지니어링 작업의 성공요인 분석 : 성공요인과 저항관리에 대한 실증연구)

  • Lee, Jae-Jeong
    • Asia pacific journal of information systems
    • /
    • v.6 no.2
    • /
    • pp.149-169
    • /
    • 1996
  • The Objective of this study is empirically investigating organizational/managerial factors affecting BPR implementation. The contributions of this research project are two-fold. First, this research project provides empirically tested CSFs and CFF of BPR implementation. Especially, the influence of the organizational culture, structure, and managerial support on BPR implementation were thoroughly investigated. Second, this research found the combined effects of CSF and CFF. Top management commitment, leadership style, and collaborative work environment were found to negate employee resistance to a reengineered process and lead to a successful BPR implementation, especially when the level of employee resistance is high.

  • PDF

Physico-Chemical Characteristics Evaluation of White Pork Rind and Black Pork Rind (백돈피와 흑돈피의 이화학적 품질특성 평가)

  • Jeon, Ki-Hong;Hwang, Yoon-Seon;Kim, Young-Boong;Choi, Yun-Sang;Kim, Byoung-Mok;Kim, Dong-Wook;Jang, Aera
    • The Korean Journal of Food And Nutrition
    • /
    • v.28 no.4
    • /
    • pp.544-550
    • /
    • 2015
  • In order to determine the material characteristics of pork rinds according to the breeds, the chemical composition, color, pH, collagen contents, shear force, fatty acid and amino acid contents of pork rinds were investigated. White pork rinds (WPR) and black pork rinds (BPR) were evaluated before and after heating to compare the differences between breeds and the effects of heating treatment. In the chemical composition test, the respective moisture contents for WPR and BPR before heating were 49.90% and 53.75% but increased to 60.75% and 61.09% after heating. The test for crude protein and crude fat contents showed lower values after heating but WPR was higher than BPR. In the color test, the L value decreased rapidly with heating, dropping from 68.75 to 45.11 in WPR and from 67.22 to 49.64 in BPR. WPR had a higher L value and a lower a value than BPR before heating but had a higher L value and a lower a value than WPR after heating. pH was significantly higher in WPR than BPR regardless of heating (p<0.05). The collagen content for WPR and BPR was 10.38 g/100 g and 11.54 g/100 g but increased to 12.00 g/100 g in WPR and decreased to 11.40 g/100 g in BPR after heating. The shear force of 26.14 kgf in WPR was significantly higher than 12.89 kgf in BPR before heating (p<0.05), but the values decreased significantly after heating in both WPR and BPR. Linoleic acid in WPR was 17.29%, which was higher than 15.13% in BPR. The USFA for BPR was also higher than WPR. In amino acid composition, the EAA contents in WPR was 7,190 mg%, which was higher than 5,520 mg% in BPR.

A Study of Process Modeling Method for Construction Business Process Reengineering (건설분야 BPR 수행을 위한 프로세스 모형화 기법 연구)

  • Kwak, Joong-Min;Park, Seo-Young;Kang, Leen-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.3
    • /
    • pp.80-88
    • /
    • 2010
  • The construction industry concentrates their efforts on construction information technology (IT) including construction CALS. However, the actual circumstances for construction IT focuses on building hardware and it neglects importance of business process reengineering (BPR) for construction tasks. A systematic process modeling method and a computerized model by process concept need for building construction BPR. This study develops a generalized BPR procedure for construction projects, and then suggests a new process modeling method for construction BPR that consists of object-related process model (ORPM). Finally, this study develops a web-based ORPM Builder (ORPMB) based on the ORPM methodology, and the applicability of the developed system is verified by a case study with practical construction processes.