• 제목/요약/키워드: BOQ

검색결과 16건 처리시간 0.028초

Development of framework to estimate environmental loads of PSC beam bridges based on LCA

  • Lee, Wan Ryul;Kim, Kyong Ju;Yun, Won Gun;Kim, In Kyum
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.730-731
    • /
    • 2015
  • This study aims at giving the framework to estimate the environmental load at planning and schematic phase. With increasing awareness of environmental issues, the effort to reduce the environmental impacts caused by human activity has been increasingly enlarged. So far most of researches estimating CO2 emissions have analyzed energy consumption based on BOQ (Bills of Quantity) acquired after detailed design. There is also lack of reliability in the estimated environmental impact using the basic unit of a facility at the planning stage, because it uses a limited specific section of historical data. Thus, this study is targeted at developing framework to assess reliable environmental loads based on information available at project early phases by making case-bases from historical design information on PSC Beam Bridge. Historical database is built on the basis of the LCA (Life Cycle Assessment) and in order to set input information for estimating model, the literature about information in an early project phase are reviewed. Using the information available in the planning and schematic design stage, the Framework is presented to estimate the environmental load in an early stage in the project. Developing an environmental load estimation model in accordance with the Framework presented in this study, it is expected that the environmental load in the initial project phase can be estimated more quickly and accurately.

  • PDF

INTEGRATED LIFE-CYCLE COST ANALYSIS CONSIDERING ENVIRONMENTAL COSTS: A HIGHWAY PROJECT CASE

  • Woo-Sik Jang;Heedae Park;Sungmin Kim;Seung Heon Han;Jong Seo Jeon
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.273-279
    • /
    • 2011
  • Concerns over the environment have spawned a number of research studies in the construction industry, as the construction of built environments and large infrastructures involves diverse environmental impacts and loads of hazardous emissions. Many researchers have attempted to quantify these environmental loads, including greenhouse gases, carbon dioxide, nitrogen dioxide, and sulfur dioxide, to name a few. However, little research has been conducted regarding integrating the life-cycle assessment (LCA) of environmental loads with the current life-cycle cost analysis (LCCA) approach. This study aims to estimate the environmental loads as a monetary value using the European Climate Exchange (ECX) rate and, then, to integrate those impacts with the pure construction cost. Toward this end, this study suggests an integrated approach that takes into account the environmental effect on the evaluation of the life-cycle cost (LCC). The bill of quantity (BOQ) data of a real highway project are collected and analyzed for this purpose. As a result, considering the environmental loads in the pavement process, the total LCC increased 16% from the traditional LCC cost. This study suggests an integrated approach that will account the environmental effect on the LCC. Additionally, this study is expected to contribute to better decision-making, from the perspective of more sustainable development, for government as well as for contractors.

  • PDF

여군장교의 복지욕구 (Welfare Needs of Female Officers in the Korean military)

  • 윤경아;노병일
    • 안보군사학연구
    • /
    • 통권1호
    • /
    • pp.155-190
    • /
    • 2003
  • The objective of this study is to provide basic information for planning and practicing social welfare services for married nurse officers serving in the Korean military. For such a purpose, this study identifies the difficulties which married nurse officers have faced and the necessary services which are supposed to alleviate them. The data were collected by sending a questionnaire to 114 married nurse officers from July 16 to August 10, 2001. The results of this study are as follows: First, the married nurse officers were relatively dissatisfied with such domains as child care and education, health, and housing. And among the thirty-four problems, the married nurse officers expressed the most serious dissatisfaction with the difficulty in attending the events held in child's school, lack of children's dormitory run by the military, difficulty in adjusting to the school due to frequent house-moving, and limited access to dental care. Second, the married nurse officers needed services in domains such as housing, child care and education, and health. Specifically, they wanted the military-run housing, child care facility within military hospitals, maternity leave for child care and education, extension of risk allowances, and support for BOQ. Third, with regard to the seriousness of problems as well as the priority of services, the married nurse officers gave higher priority to such domains as child care and education, health, and housing. These results indicate that married nurse officers were to the largest extent concerned with these three domains and that they had the urgent need for services relevant to those domains. The importance of routine need assessments as well as solutions to the family-related problems for married nurse officers is therefore suggested in this study.

  • PDF

EVMS를 활용한 공정-공사비 통합관리 프로세스모델 (An Integrated Cost and Schedule Control Process Model Using Earned Value Management System)

  • 백승호;김경래;이유섭;이용규
    • 한국건설관리학회논문집
    • /
    • 제1권2호
    • /
    • pp.89-97
    • /
    • 2000
  • EVMS(Earned Value Management System)는 공정-공사비가 통합된 관리기준 상에서 단위 관리항목을 중심으로 계획 대비 실적측정을 통해 공정-공사비 실적 치를 측정, 분석, 예측하는 관리체계로서, 발주자 측면에서는 실적기반의 공사비 집행 및 관리를 통해 예산관리의 효율성을 증진시키며, 시공자측면에서는 공정-공사비 통합을 통한 원가 및 기성관리의 효율화 방안으로서 그 효과를 찾을 수 있다. 최근 우리나라에서도 공공 건설사업 효율화 방안의 일환으로 EVMS에 의한 공정-공사비 통합관리를 시도하고 있으나, EVMS에 대한 지식과 운영기반이 취약한 것으로 나타나고 있다. 따라서 본 연구에서는 국내 건설생산체제를 분석하여 EVMS 개념의 도입을 위한 장애요인과 한계성을 규명하고, 국내 건설환경에 적합한 EVMS에 의한 공정-공사비 통합관리 프로세스 모델을 제안하고자 한다. 이 모델은 6가지 하위 프로세스로 구성된다. : 조직구성, 일정계획, 계약금액 편성, 실적관리기준 설정, 경영분석, 변경사항관리.

  • PDF

실적자료 분석에 의한 적정 공사비 산정방법의 전산화 알고리즘 구축에 관한 연구 (A Study on the Construction of Computerized Algorithm for Proper Construction Cost Estimation Method by Historical Data Analysis)

  • 전재열
    • 한국건설관리학회논문집
    • /
    • 제4권4호
    • /
    • pp.192-200
    • /
    • 2003
  • 본 연구는 공공건설 공사에 실적자료에 의한 공사비산정 방법의 전산화 적용을 목적으로 먼저 실적공사비의 정의 및 구조와 현행 실적공사비 운영체계 이해를 통해 전산화의 문제점 및 개선기준을 공사비 산정방법 중심으로 분석 기술하였으며 제안한 기준에 따라 전산화 알고리즘을 제시하였다. 기존 예정공사비 산정방법은 일반적인 공종별 분류에 따른 실적자료조건과 단순히 물가지수, 연면적규모에 따른 시공단가를 적용함으로서 공사비산정의 정확성이 요구되며, 본 연구는 이에 대한 개선 안으로 부위와 부분별 공종분류 방식에 의한 데이터 추출조건으로 실적자료의 적용성과 신뢰성을 높였다. 또한 물량규모에 의한 공사비 변동요인을 물량규모 대비 단가의 확률적 회귀분석으로 예측 추정하여 실행 가능한 적정 공사비 산정방법을 제시하였다. 따라서 본 연구에서는 전산화 적용 방안으로 확률적 예정공사비산정방법을 기준으로 시스템 프로세스를 각 영역별로 구축하고 그에 따른 윈도우 어플리케이션 활용 툴과 개별 전산화에 대한 알고리즘을 구축하였다.

강재 프레임 주택형 모듈러의 경제성 분석: 벽식구조인 도시생활형주택과의 사례비교를 통해 (An Economic Analysis of Steel Framed Modular Housing: Compared with Case of Urban Type Living Housing of Wall-slab)

  • 방종대;전주영;박지영;김종엽;김갑득;천영수
    • 토지주택연구
    • /
    • 제5권4호
    • /
    • pp.305-314
    • /
    • 2014
  • 노동집약적 현장중심의 습식공법의 한계로 인해 기술집약적이고 공장생산방식인 유닛 모듈러 공법이 주목을 받고 있다. 국내에서도 유닛 모듈러 공법을 개발하여 학교, 기숙사, 군막사 등에 활발히 적용하고 있으나 주거용 건축물에는 적용하지 못하고 있다. 그 이유는 거주성능에 대한 검증이 부족하고, 경제성에 대한 확신이 부족하기 때문이다. 따라서 본 연구는 모듈러 공법의 기술발전과 주거용 건축물로의 적용을 활성화하기 위해 모듈러 주택의 경제성을 분석하였다. 연구결과에 의하면 건설원가만을 단순 비교했을 때 모듈러 주택의 건설원가는 약 6.2% 상승하는 것으로 나타났다. 그러나 모듈러 주택의 장점인 공기단축이나 공장생산을 통한 생산성을 제고할 경우, 모듈러 주택의 건설원가는 벽식구조 주택과 비슷한 수준이 될 것으로 판단된다.