• Title/Summary/Keyword: BNR공정

Search Result 57, Processing Time 0.036 seconds

HRT에 따른 혐기-호기-무산소 공정의 BNR 특성

  • 김홍태;김은경
    • Proceedings of the Korean Environmental Sciences Society Conference
    • /
    • 2003.11b
    • /
    • pp.47-48
    • /
    • 2003
  • 무산소조의 HRT가 3.5시간에서는 탈질이 일어날 수 있는 조건을 이루지 못하였다. Phase 4에는 무산소조를 3.7시간으로 고정하고 호기조와 혐기조의 HRT를 조절하여도 전체적인 효율에는 큰 영향을 미치지 않았다. 또한 슬러지 반송만으로 높아질수 있는 NO3-N 농도를 무산소조의 HRT로 조절함과 동시에 호기조에서의 DO농도를 1.5로 주입함으로써 높은 질산화로 인해 발생되는 낮은 탈질률을 막아줌으로써 인제거율에도 효과를 나타냄을 알 수 있다.

  • PDF

Evaluation of COD Utilization for Biological Nutrient Removal with dPAO in SBBR-MSBR System (Denitrifying PAO와 SBBR-MSBR을 이용한 생물학적영양소제거공정에서 탄소원 절약에 대한 연구)

  • Lee, Hansaem;Han, Jonghun;Yun, Zuwhan
    • Journal of Korean Society on Water Environment
    • /
    • v.27 no.5
    • /
    • pp.646-653
    • /
    • 2011
  • The combined system of sequencing batch biofilm reactor (SBBR) and membrane SBR (MSBR) was operated with sewage to evaluate the COD utilization for biological nutrient removal (BNR). The SBBR was operated for nitrification reactor, while denitrifying PAO (dPAO) was cultivated in MSBR with anaerobic-anoxic operation. In the SBBR and MSBR system, the enhanced biological phosphorus removal (EBPR) was successfully achieved with higher N removal. The COD utilization in combined SBBR-MSBR system was significantly reduced compared to ordinary BNR (up to 3.1 g SCOD/g (N+P) and 1.6 g SCOD/g (N+P) with different C/N/P ratio). The results suggest that a dPAO process could effectively reduce carbon energy (=COD) requirement. The combination of oxic-SBBR and anaerobic-anoxic MSBR for dPAO utilization could be an attractive alternative to upgrade the process performance in weak sewage.

NADH Variation and Process Control with NADH Fluorometer in Full Scale Biological Nutrient Removal Process (실규모의 고도처리공정에서 NADH변화 유형과 이를 활용한 공정제어)

  • Kim, Han-Lae;Cho, Jong-Bok;Cho, Il-Hyoung;Lee, Jin-Woo;Chang, Soon-Woong;Lee, Si-Jin
    • Journal of Environmental Health Sciences
    • /
    • v.34 no.6
    • /
    • pp.423-432
    • /
    • 2008
  • In this study, we investigated the possibility of auto control and the proper operating factors in the BNR(Biological Nutrient Removal) process using an NADH(Reduced Nicotinamide Adenine Dinucleotide) fluorometer, which characterized the emitted fluorescence when activated by flashes of UV light at 460 nm. In terms of finding adequate operating parameters, results indicted that nitrification efficiency decreased in the controlled DO while denitrification efficiency decreased in the controlled pH. The above results indicated that controlled operating condition after combination with NADH, DO and pH was resonable. Result obtained from the correlation between NADH and pH showed that variation trend of influent loading was similar to those of NADH and pH, and also the variation cycle was repeated on a daily basis. Consequently, this result showed the increase of BOD loading caused the nitrification efficiency to decrease because air-flow, required for nitrification, was reduced, and so the NADH value was increased. From these results, it is possible to use NADH flourimetry to assess the variation of organic load and nitrification efficiency in the case of small change in influent pH such as in sewage and also to handle and operate the load variation in the auto control system using the NADH fluorometer.

Membrane bioreactor immersed in the aerated settler to reduce membrane fouling (고도처리용 MBR의 막오염 저감을 위한 막분리 침전조에 대한 연구)

  • Shin, Dong-Whan;Park, Hun-Hwee;Chang, In-Soung
    • Proceedings of the KAIS Fall Conference
    • /
    • 2006.05a
    • /
    • pp.585-586
    • /
    • 2006
  • 본 연구에서는 고도처리를 위한 BNR 공정에 사용되는 MBR (Membrane Bioreactor)의 막 오염(membrane fouling)을 저감시키기 위해 분리막을 침지시킨 침전조를 상하로 나누어 상부는 폭기조로, 하부는 침전조의 역할을 수행하게 하는 새로운 형태의 막분리 침전조 (aerated settler)의 성능을 평가 하였다. 막분리 침전조는 상하로 구분하기 위해서 baffle을 설치하였다. 파일럿 규모 ($Q=50m^3/d$)의 MBR 공정은 실제 오수를 유입수로 사용하였으며 약 6개월간 운전하였다. 탈질을 위하여 막분리 침전조 하부에서 무산소조로 반송되는 반송수의 DO를 크게 줄어들게 함으로써 무산조에서의 탈질효율이 증가되었다. 처리수의 총 TN 제거율은 75%이었다. 또한 막분리침전조 상 하부의 MLSS 농도 차에 의해 상부에 침지된 막 모듈은 기존의 MBR 공정보다 막 오염 저감 효과가 있어서 세정주기가 증가하였다. 운전 개시 후 4개월째 되는 시점에 TMP가 40cmHg에 도달하여 1회 화학적 약품세정만이 필요하였다.

  • PDF

A Statistical Study of SNR, SDNR on Water Temperature, C/N Ratio, and BOD Loads in Wastewater Treatment process (하수처리공정에서 수온, C/N비, BOD부하량에 따른 SNR, SDNR의 통계적 연구)

  • An, Sang-Woo;Min, Jee-Eun;Park, Jae-Woo
    • 한국방재학회:학술대회논문집
    • /
    • 2008.02a
    • /
    • pp.823-826
    • /
    • 2008
  • Statistical methods were used in the analysis of data, which are the SNR and SDNR in describing the various natures, and the methodology relating the results with the operation was developed. Multiple regression analysis based on the results of statistics of data were SNR = 0.0219 + 0.000044BOD lording - 0.00600C/N ratio and SDNR = 0.0226 + 0.000044BOD lording - 0.00602C/N ratio. It were concluded that the variability of the process performance should be reflected to the operation condition procedure through the analysis based on the statistics methods.

  • PDF

The Role of Primary Clarifier in Biological Processes for Nutrient Removal (생물학적 질소·인제거 공정에서 일차 침전지의 영향)

  • Whang, Gye-Dae;Kim, Tae-Kyung
    • Journal of Korean Society on Water Environment
    • /
    • v.23 no.1
    • /
    • pp.19-26
    • /
    • 2007
  • The lab-scale BNR processes fed with Municipal Wastewater Before or After Primary Clarifier (MWBPC or MWAPC) were operated to observe the behavior of particle organic matter in terms of nitrification and denitrification efficiency. As a result of the fractionation of the COD from MWBPC or MWAPC using an aerobic respirometric serum bottle reactor, the total mass of biodegradable organic matter from MWBPC is about 52% greater than the mass from MWAPC. Batch reactors were operated to observe the effect of the Particulate Organic Matter (POM) on substrate utilization for denitrification. Although the consumption of POM for denitrification was observed, the increment of the Specific Denitrification Rate (SDNR) was not great. In terms of the effect of POM on nitrification at different HRTs, activate sludge reactors were operated to determine the optimal HRT when MWBPC and MWAPC were fed relatively. All reactors showed a great organic matter removal efficiency. Reactors fed with MWAPC had obtained the nitrification efficiency above 90% when the HRT of 4 hr, at least, was maintained, while reactors fed with MWBPC had same efficiency when the HRT longer than 5 hr was kept. Three parallel $A^2/O$ systems fed with MWBPC or MWAPC relatively were operated to investigate the effects of POM on BNR processes with varying the HRT of an anoxic reactor. For all systems, the efficiency of organic matter removal and denitrification, respectively, was great and about the same. In case of denitrification efficiency, system with MWAPC had 1.5% lower than system with MWBPC at the same HRT of anoxic reactor of 2 hr, and the increasing the HRT of the anoxic reactor by 1 hr in systems fed with MWBPC resulted in a 3.5% increment. The denitrification rate was similar while the consumption of organic matter in systems fed with MWBPC was higher than system fed with MWBPC. It suggests that POM in MWBPC was not be used significantly as a substrate for denitrification in system with the HRT of 3 hr of an anoxic reactor.

Effects of Environmental Factors on Nitrite Accumulation in a Strong Nitrogen Removal System (고농도 질소폐수 처리 공정에서 환경인자가 아질산염 축적에 미치는 영향)

  • Park, Noh-Back;Choi, Woo-Yung;Yoon, Ae-Hwa;Jun, Hang-Bae;Park, Sang-Min
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.24 no.1
    • /
    • pp.51-62
    • /
    • 2010
  • The high concentration of N in the wastewater from livestock farming generally renders the efficiency of the wastewater treatment. Therefore, removal of N in livestock wastewater is crucial for successful treatment. The current study was conducted to investigate the optimum conditions for partial nitrification under anaerobic condition following nitritation in TPAD-BNR(two-phase anaerobic digestion-biological nitrogen removal) operating system. Sequential operating test to stimulate partial nitrification in reactor showed that partial nitrification occurred at a ratio of 1.24 in $NO_2{^-}$-N:$NH_4{^+}$-N. With this result, a wide range of factors affecting stable nitritation were examined through regression analysis. In the livestock wastewater treatment procedure, the hydraulic retention time (HRT) and pH range for optimum nitrite accumulation in the reactor were 1-1.5 days and 7-8, respectively. It was appeared that accumulation of $NO_2{^-}$-N in the reactor is due to inhibition of the $NO_2{^-}$-N oxidizer by free ammonia (FA) while the effect of free nitrous acid was minimal. Nitrification was not influenced by DO concentration at a range of 2.0-3.0 mg/L and the difference in the growth rate between $NH_4{^+}$-N oxidizer and $NO_2{^-}$-N oxidizer was dependent on the temperature in the reactor.

Optimization of Nitrogen and Phosphorus Removal of Temporal and Spatial Isolation Process by Model Simulation System (시공간 동시분할 공정 시뮬레이션을 통한 질소 및 인 제거 최적화 방안)

  • Ryu, Dongjin;Chang, Duk;Shin, Hyungsoo;Park, Sangmin;Hong, Kiho;Kim, Sooyoung;Kim, Myoungjun
    • Journal of Korean Society on Water Environment
    • /
    • v.23 no.2
    • /
    • pp.206-215
    • /
    • 2007
  • The objective of this study was to establish the optimal system operating strategies for nitrogen and phosphorus removal through model simulation system built for advanced wastewater treatment targeting on simultaneous temporal/special phase isolation BNR process. The simulation system was built with unit process modules using object modules in GPS-X code. The system was well verified by field experiment data. Simulation study was carried out to investigate performance response to design and operation parameters, i.e. hydraulic retention time (HRT), solids retention time (SRT), and cycle time. The process operated at HRTs of 10~15 hours, longer SRTs, and cycle time of 2 hours showed optimal removal of nitrogen. The HRTs of 10~15 hours, SRTs of 20~25 days, and longer cycle time was optimal for phosphorus removal. Both simulation and field studies showed that optimal operating strategies satisfying both the best nitrogen and phosphorus removals include HRTs ranged 10~15 hours, SRTs ranged 20~25 days, and cycle times of 4~8 hours. The simulation system with modularization of generalized components in BNR processes was, therefore, believed to be a powerful tool for establishing optimal strategies of advanced wastewater treatment.

Development of the Substrate Utilization and Respiration Model by the Step Growth Concept (단계별 성장 개념의 기질 이용과 미생물 호흡모델 개발)

  • Kim, Youn Kwon;Seo, In Seok;Kim, Hong Suck;Kim, Ji Yeon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.4B
    • /
    • pp.433-437
    • /
    • 2006
  • Recently, mathematical modeling for the activated sludge process is important to design and control of wastewater treatment plant. Nevertheless, there is a lack of information regarding the pathway of substrate utilization between external and internal substrates in biological nutrient removal (BNR). In this research, a new activated sludge model (step growth model) is proposed and compare with ASM No.3. This model structure is consist of five processes; aerobic storage, growth on external substrate and stored intercellular storage compounds (ISCs), endogenous respiration and aerobic respiration of ISCs. The predicted results by the step growth model were more good accordance with the results of oxygen utilization rate (OUR) and TCOD experiment than that of the ASM No.3.

Efficient Anaerobic Digestion for Highly Concentrated Particulate Organic Wastewater (고농도 입자성 유기폐수의 고효율 혐기성 소화 공정)

  • Lee, Sungbum;Shin, Kyuchul;Kim, Huijoo;Kim, Hyunju;Choi, Changkyoo;Kim, Moonil
    • Journal of the Korean GEO-environmental Society
    • /
    • v.9 no.2
    • /
    • pp.23-29
    • /
    • 2008
  • It has been mentioned that CSTR (Completely Stirred Tank Reactor) and UASB (Upflow Anaerobic Sludge Blanket) processes, the existing anaerobic processes, have problems in the treatment of highly concentrated particulate organic wastewater (HCPOW). Therefore, this paper discusses the treatment possibility of distillery wastewater which is a typical HCPOW using ADEPT (anaerobic Digestion Elutriated Phased Treatment) process. In the comparison of CSTR and ADEPT, ADEPT produced much higher gas than that of CSTR removing more organic matters and suspended solids in ADEPT process, ADEPT had no effect on the decrease in pH by volatile fatty acids and showed steady pH in spite of relatively short HRT. In the results of removal rate according to recycle ratios between 6Qin and 2Qin in ADEPT, 6Qin showed high removal rate during the operation time. Therefore it appears that ADEPT had an applicability for the treatment of distillery wastewater. ADEPT could be a economical process, due to the short HRT, the energy recovery by the methane production, and the utilization for carbon source of produced organic acid from the ADEPT-acid reactor.

  • PDF