• Title/Summary/Keyword: BIM libraries

Search Result 39, Processing Time 0.023 seconds

Development of Plant BIM Library according to Object Geometry and Attribute Information Guidelines (객체 형상 및 속성정보 지침에 따른 수목 BIM 라이브러리 개발)

  • Kim, Bok-Young
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.52 no.2
    • /
    • pp.51-63
    • /
    • 2024
  • While the government policy to fully adopt BIM in the construction sector is being implemented, the construction and utilization of landscape BIM models are facing challenges due to problems such as limitations in BIM authoring tools, difficulties in modeling natural materials, and a shortage in BIM content including libraries. In particular, plants, fundamental design elements in the field of landscape architecture, must be included in BIM models, yet they are often omitted during the modeling process, or necessary information is not included, which further compromises the quality of the BIM data. This study aimed to contribute to the construction and utilization of landscape BIM models by developing a plant library that complies with BIM standards and is applicable to the landscape industry. The plant library of trees and shrubs was developed in Revit by modeling 3D shapes and collecting attribute items. The geometric information is simplified to express the unique characteristics of each plant species at LOD200, LOD300, and LOD350 levels. The attribute information includes properties on plant species identification, such as species name, specifications, and quantity estimation, as well as ecological attributes and environmental performance information, totaling 24 items. The names of the files were given so that the hierarchy of an object in the landscape field could be revealed and the object name could classify the plant itself. Its usability was examined by building a landscape BIM model of an apartment complex. The result showed that the plant library facilitated the construction process of the landscape BIM model. It was also confirmed that the library was properly operated in the basic utilization of the BIM model, such as 2D documentation, quantity takeoff, and design review. However, the library lacked ground cover, and had limitations in those variables such as the environmental performance of plants because various databases for some materials have not yet been established. Further efforts are needed to develop BIM modeling tools, techniques, and various databases for natural materials. Moreover, entities and systems responsible for creating, managing, distributing, and disseminating BIM libraries must be established.

OpenBIM-based Mapping System Development for Geometry Information Exchange of Architectural Components (건축부재 형상정보 교환을 위한 개방형BIM 기반의 매핑 시스템 개발)

  • Park, Seunghwa;Kim, Inhan;Lee, Jiah
    • Korean Journal of Computational Design and Engineering
    • /
    • v.19 no.2
    • /
    • pp.182-190
    • /
    • 2014
  • Parametric modeling is one of BIM's characteristics and BIM have being utilized for constructability analysis, energy efficiency analysis, and so on in diverse construction field. However, parametric information's interoperation is not solved until now because different BIM tools have specific algorithm and methods to generate geometric information. To solve the problem, previous research suggested IFC-XML methodology. In this paper, authors studied connections between IFC-XML structure and script-based modeling commends to make libraries in commercial BIM tools such as ArchiCAD$^{TM}$ and Digital Project$^{TM}$. In addition, they made commends mapping tables to exchange geometry information of architectural components. Moreover, mapping system was developed to certify the mapping tables which is classified modeling commends. Finally, translated architectural component model was confirmed using exchanged geometry information in browser.

Development of Quantity Take-off Building Information Modeling System for Retaining Wall (객체 기반 물량 산출을 위한 흙막이 BIM 설계 시스템 구축)

  • Kang, SeoungWoo;Kim, Eun-Seok;Lee, Si-Eun;Kim, Chee-Kyeong
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.35 no.4
    • /
    • pp.197-205
    • /
    • 2022
  • In this paper, a retaining wall system, developed using building Information modeling (BIM), is presented. Based on the information from a literature review, elementary technologies for the system were defined and developed. First, for the elementary technology, BIM libraries were constructed using standards and previous study results to achieve versatility and reusability. Second, methods for determining the quantity take-off (QTO) of a retaining wall were reviewed for an earth-work calculating system. Additionally, inverse distance weighting interpolation was used to generate topography. Finally, four formulas for calculating the QTO were proposed and devised for each element. After its development, the BIM system was analyzed and verified through comparison with a two-dimensional drawing-based QTO. The proposed system is deemed to be practical for determining the QTO of retaining walls and earth works. The contributions and limitations of the research are discussed in this paper.

A Study on the Effects of BIM Adoption and Methods of Implementationin Landscape Architecture through an Analysis of Overseas Cases (해외사례 분석을 통한 조경분야에서의 BIM 도입효과 및 실행방법에 관한 연구)

  • Kim, Bok-Young;Son, Yong-Hoon
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.45 no.1
    • /
    • pp.52-62
    • /
    • 2017
  • Overseas landscape practices have already benefited from the awareness of BIM while landscape-related organizations are encouraging its use and the number of landscape projects using BIM is increasing. However, since BIM has not yet been introduced in the domestic field, this study investigated and analyzed overseas landscape projects and discussed the positive effects and implementation of BIM. For this purpose, landscape projects were selected to show three effects of BIM: improvement of design work efficiency, building of a platform for cooperation, and performance of topography design. These three projects were analyzed across four aspects of implementation methods: landscape information, 3D modeling, interoperability, and visualization uses of BIM. First, in terms of landscape information, a variety of building information was constructed in the form of 3D libraries or 2D CAD format from detailed landscape elements to infrastructure. Second, for 3D modeling, a landscape space including simple terrain and trees was modeled with Revit while elaborate and complex terrain was modeled with Maya, a professional 3D modeling tool. One integrated model was produced by periodically exchanging, reviewing, and finally combining each model from interdisciplinary fields. Third, interoperability of data from different fields was achieved through the unification of file formats, conversion of differing formats, or compliance with information standards. Lastly, visualized 3D models helped coordination among project partners, approval of design, and promotion through public media. Reviewing of the case studies shows that BIM functions as a process to improve work efficiency and interdisciplinary collaboration, rather than simply as a design tool. It has also verified that landscape architects could play an important role in integrated projects using BIM. Just as the introduction of BIM into the architecture, engineering and construction industries saw great benefits and opportunities, BIM should also be introduced to landscape architecture.

MATERIAL MATCHING PROCESS FOR ENERGY PERFORMANCE ANALYSIS

  • Jung-Ho Yu;Ka-Ram Kim;Me-Yeon Jeon
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.213-220
    • /
    • 2011
  • In the current construction industry where various stakeholders take part, BIM Data exchange using standard format can provide a more efficient working environment for related staffs during the life-cycle of the building. Currently, the formats used to exchange the data from 3D-CAD application to structure energy analysis at the design stages are IFC, the international standard format provided by IAI, and gbXML, developed by Autodesk. However, because of insufficient data compatibility, the BIM data produced in the 3D-CAD application cannot be directly used in the energy analysis, thus there needs to be additional data entry. The reasons for this are as follows: First, an IFC file cannot contain all the data required for energy simulation. Second, architects sometimes write material names on the drawings that are not matching to those in the standard material library used in energy analysis tools. DOE-2.2 and Energy Plus are the most popular energy analysis engines. And both engines have their own material libraries. However, our investigation revealed that the two libraries are not compatible. First, the types and unit of properties were different. Second, material names used in the library and the codes of the materials were different. Furthermore, there is no material library in Korean language. Thus, by comparing the basic library of DOE-2, the most commonly used energy analysis engine worldwide, and EnergyPlus regarding construction materials; this study will analyze the material data required for energy analysis and propose a way to effectively enter these using semantic web's ontology. This study is meaningful as it enhances the objective credibility of the analysis result when analyzing the energy, and as a conceptual study on the usage of ontology in the construction industry.

  • PDF

Analysis of Standardized Drawings and Breakdown Structure to Develop of 3D Object Library for Railway Infrastructure (철도인프라 3차원 객체라이브러리 구축을 위한 표준도/분류체계 분석)

  • Park, Hyung-Jin;Seo, Myoung-Bae
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.30 no.1
    • /
    • pp.71-76
    • /
    • 2017
  • In BIM design, the construction and use of a library are very important. Since the existing contents can be re-used, the design can be executed more effectively and efficiently. Unlike the construction, the civil engineering, in particular, the railroad sees an inappropriate development and standardization of libraries. Thus, this study aims to develop and standardize the 3D object library in the railroad facility. We first gather and analyze the railroad facility breakdown structure and relevant drawings. We then match the items of analyzed standard drawings and the breakdown structure items. It was reviewed whether the library was required according to all items, and if required, it was reviewed what software was proper. Available software were found to be Civil 3D, Revit, etc. Based on this analysis, we will design the attribute items and specifications of the 3D railroad infrastructure library, as well as construct the library thereof.

LIM Implementation Method for Planning Biotope Area Ratio in Apartment Complex - Focused on Terrain and Pavement Modeling - (공동주택단지의 생태면적률 계획을 위한 LIM 활용방법 - 지형 및 포장재 모델링을 중심으로 -)

  • Kim, Bok-Young;Son, Yong-Hoon;Lee, Soon-Ji
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.46 no.3
    • /
    • pp.14-26
    • /
    • 2018
  • The Biotope Area Ratio (BAR) is a quantitative pre-planning index for sustainable development and an integrated indicator for the balanced development of buildings and outdoor spaces. However, it has been pointed out that there are problems in operations management: errors in area calculation, insufficiency in the underground soil condition and depth, reduction in biotope area after construction, and functional failure as a pre-planning index. To address these problems, this study proposes implementing LIM. Since the weights of the BAR are mainly decided by the underground soil condition and depth with land cover types, the study focused on the terrain and pavements. The model should conform to BIM guidelines and standards provided by government agencies and professional organizations. Thus, the scope and Level Of Detail (LOD) of the model were defined, and the method to build a model with BIM software was developed. An apartment complex on sloping ground was selected as a case study, a 3D terrain modeled, paving libraries created with property information on the BAR, and a LIM model completed for the site. Then the BAR was calculated and construction documents were created with the BAR table and pavement details. As results of the study, it was found that the application of the criteria on the BAR and calculation became accurate, and the efficiency of design tasks was improved by LIM. It also enabled the performance of evidence-based design on the terrain and underground structures. To adopt LIM, it is necessary to create and distribute LIM library manuals or templates, and build library content that comply with KBIMS standards. The government policy must also have practitioners submit BIM models in the certification system. Since it is expected that the criteria on planting types in the BAR will be expanded, further research is needed to build and utilize the information model for planting materials.

KNOTWORKING - A NOVEL BIM-BASED COLLABORATION PRACTICE IN BUILDING DESIGN PROJECTS

  • Hannele Kerosuo;Tarja Maki;Jenni Korpela
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.80-86
    • /
    • 2013
  • Knotworking represents a distributed collaborative expertise in pursuit of a task that is organized among designers from different design disciplines. Construction processes involve phases and tasks that cannot be solved in one organization only, as integration of expert knowledge from various sources is needed. Through knotworking, groups of people, tasks and tools are set to work intensively for a short period of time to solve a problem or accomplish a task. Knotworking requires intensive collaboration across organizational boundaries and hierarchies. The practice of knotworking has been developed and applied in the development of healthcare organizations, libraries and school-university relationships, but it has not previously been applied in the construction industry. In this paper, we describe the concept of knotworking and the findings of a case study that we completed in the Finnish construction industry. We will also compare the similarities and differences of the Big Room and knotworking in terms of participants, duration, target, space/infrastructure, benefits and challenges. Finally, we present some suggestions for further research and experimentation on knotworking in construction projects.

  • PDF

Recipe-based estimation system for 5D(3D + Cost + Schedule) CAD system (레서피(Recipe) 기반의 견적 방법을 이용한 5D CAD 시스템)

  • Choi, Cheol-Ho;Park, Young-Jin;Han, Sung-Hun;Chin, Sang-Yoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.154-160
    • /
    • 2006
  • There wasn't very successful practice cases for the quantity take-off based on the CAD system since the CAD system is used in the construction industry more than 20 years in Korea. It was also not easy to use 3D CAD system in design management and cost management in the construction industry although 3D CAD system is very successful in the manufacturing industry for those areas recently. It is important to construct 3D libraries and to supply those libraries for the designers in time. Architectural work is a kind of creative work. So, Architects like to create their own model. Unlike the manufacturing industry, 3D CAD system can not be survived in the construction industry without new 3D objects supply in the right time. Moreover, the estimation system for 3D must support the schematic design phase, detailed design phase and construction design phase. The product called "Constructor" of Graphisoft consist of modeller, estimator and scheduler based on 3D model. We applied the system to a real project and compared the estimation result and we made a very successful case study.

  • PDF