• 제목/요약/키워드: BIM based information Management

Search Result 344, Processing Time 0.631 seconds

A Study on Improvements Direction for Applying BIM-based Virtual Reality of Apartment Sales Phase (공동주택 분양 관리 단계의 BIM 기반 가상현실 적용성 확보를 위한 개선방향 도출에 관한 연구)

  • Lee, Juyeon;Kim, Taekjoong;Choi, Yoonki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.86-94
    • /
    • 2019
  • The purpose of this study was to analyzes the problems in terms of transmission the information of architecture in the current apartment housing sales phase, to suggest the way of application the technology of BIM-based virtual reality. For this purpose, each element technology is analyzed through analyzing the exiting studies and international technical trend of BIM-based virtual reality and motion recognition devices. And then this study analyze the present condition of apartment housing sales phase and it conduct the expert interviews for derive the problem and analyzing the importance and priority by AHP method. And finally, this study suggest the solution in terms of information delivery in apartment housing sales phase through plan for support and deriving the function about problems. The system of BIM-based virtual reality viewer that utilize a leap motion that was presented in this study, it is believed to be able to efficiently transfer the information of architecture as building information transmission system user-centric in the future of apartment housing sales phase.

Schematic Estimation Process using Architectural Object BIM Library

  • Lee, Ji Yong;Kim, In Han;Choi, Jung Sik
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.289-293
    • /
    • 2015
  • The construction industry has been evolving with the development of information technology. According to this trend, the current industry changes from 2d drawings to Building Information Modeling(BIM). Current studies on the BIM-based estimation have problems such as Quantity Take-Off(QTO) specificity toward a particular software, the uncertainty of the amount in accordance with the model quality. These studies focus on QTO based on BIM rather than schematic estimation. In addition, studies on the connection with the QTO and unit cost for schematic estimation are insufficient. The purpose of this study is to propose schematic estimation process by utilizing construction codes and QTO in architectural object BIM libraries. Construction codes are classified in detail in order to input codes inside each. This study has connected unit cost and construction classification codes that obtain from BIM model. The results of this study will be helpful in decision-making and communication for schematic estimation of the design phase. It will improve the efficiency and reliability problems of existing schematic estimation.

  • PDF

A Proposal Research of Assessment Standards for Ordering BIM-based Projects in Railway Infrastructure - Case Study on Application of Existing Projects - (철도인프라 BIM기반 공사 발주를 위한 평가기준 제안 연구 - 기존 발주사업 적용 사례를 통해 -)

  • Son, Seo-Yeon;Lee, Geun-Il;Jung, Ji-Hyun;Moon, Woo-Hyoung
    • Journal of KIBIM
    • /
    • v.11 no.4
    • /
    • pp.10-19
    • /
    • 2021
  • In the evaluation for ordering BIM-based projects (Design Build) of Korean National Railway, criteria of BIM-based smart construction technology are assessed. Unlike the existing assessment criteria, performance resources and detailed assessment guidelines have been added by this research. The purpose of this study is to propose qualification assessment standards according to specific guidelines when evaluating on the phase of bidding for BIM-based projects. In the study, an improved evaluation standard (draft) was arranged based on two consultation meetings and surveys of related companies, applied to existing projects with the companies that won the bid, and validated. As more specific and added criteria compared to the existing standards, it could reduce the difficulty of evaluation for BIM capability and lay the foundation for railway BIM-based project management.

Development of BIM based LID Facilities Supply Auto-checking Module (BIM 기반 LID 시설 물량 자동 검토 모듈 개발)

  • Choi, Junwoo;Jung, Jongsuk;Lim, Seokhwa;Choi, Joungjoo;Kim, Shin;Hyun, Kyounghak
    • Journal of Environmental Impact Assessment
    • /
    • v.26 no.3
    • /
    • pp.195-206
    • /
    • 2017
  • Recently, Discussion about BIM based LID (Low Impact Development) facilities management system is activated because interest of LID technique for urban water cycle restoration is increasing. For this reason, this paper developed the auto-checking module of the BIM (Building Information Model) based supply output table. This module will be the foundation of the BIM based LID facilities total management system. The research order is composed like next follows: (1) Select target area, (2) Make BIM model of LID facilities and extract supply output table, (3) Develop comparison module, (4) Analysis results. As a result, the authors made 27 LID facilities and developed the supply output table comparison automation module. So, the authors could find differences of 2D design documents based supply output table and BIm based supply output table. So, the authors made an improvement suggestion of the design plan and could construct foundation of the BIM based LID facilities total management system.

Development of BIM-based Work Process Model in Construction Phase (시공단계의 BIM기반 건설사업관리 업무절차 모델 개발)

  • Yu, Yongsin;Jeong, Jiseong;Jung, Insu;Yoon, Hobin;Lee, Chansik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.1
    • /
    • pp.133-143
    • /
    • 2013
  • BIM can be utilized variously in construction management(CM) in the respect that it helps to manage comprehensively the construction information and make reliable decisions, but the adoption of BIM is insufficient in the CM area. The purpose of this study is to develop work process models and their guides in order to utilize BIM effectively in CM work at construction stage. This study defined BIM functions as 'BIM converting design', 'Model review', 'Data extraction', 'Automatic estimate', '4D simulation', 'Drawing creation', 'Engineering sector linkage analysis' through literature search, and generated CM works applicable to BIM by analyzing the CM work and process. This study developed BIM-based CM work process models by reconstructing the existing work process in connection with BIM function through an analysis on the relationship between BIM function and CM work, and reconstructing the role of each project participants. In order to improve the usefulness of the developed models, guides that described the BIM works of project participants were prepared through interviews and case studies. To validate the utilization of the models, a comparative analysis on the BIM process of precedent studies was also made and a survey was conducted on experts. This study can contribute to increasing the utilization of BIM in the CM area and can be helpful for CM companies to develop an in-house BIM guide. In the future, it will be necessary to make an assessment on the models from a business perspective through case applications and constantly update BIM-based CM work process model in consideration of the expansion of CM work due to the application of BIM.

Automatic Inference of Standard BOQ(Bill of Quantities) Items using BIM and Ontology (BIM과 온톨로지를 활용한 표준내역항목 추론 자동화)

  • Lee, Seul-Ki;Kim, Ka-Ram;Yu, Jung-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.99-108
    • /
    • 2012
  • The rough design information is only available from BIM(Building Information Model) based schematic design. So, it is difficult to obtain sufficient information for generating BOQ. Like 2D design, there are some problems that the results are depend on what the choice of cost estimator. However, the most research of BIM based cost estimation are focus on quantity takeoff, the consideration of work item for generating BOQ is insufficient. Therefore, this paper present automatic inference process of work items in a BOQ using ontology. The proposed process and ontology is validated through applying tiling construction. If the proposed process is utilized, it is expected the basis of developing generation method for consistent BOQ by resolving intervention of cost estimator's arbitrary decision.

A Study on Development of BIM-based Engineering Management System for Temporary Work (BIM기반 가설공사 업무지원시스템 개발에 관한 연구)

  • Choi, Changhoon;Han, Choonghee;Lee, Junbok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.1
    • /
    • pp.61-69
    • /
    • 2020
  • As the amount of information generated in the construction project increases exponentially, design and construction review have a serious impact on the success of the site. For this reason, academic and business circles have been expanding the use of BIM at the whole life, and BIM is now accepted as one of the standards used in the construction industry. However, the BIM-based design for the temporary work is used as an aid to the 2D design because there is no specialized software and there is absolutely lack of a professional engineer. The objective of this research is to develop BIM-based temporary work support system. This system minimizes human errors in BIM-based design, quantity takeoff and inspection and shortens working hours.

A Study on the BIM-based Green building Simulation System (BIM(Building Information Modeling) 기반의 친환경 건축 시뮬레이션 시스템에 관한 연구)

  • Jeon, Seung-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.758-762
    • /
    • 2008
  • As development of IT technology, Interest of Green building has been increasing rapidly. Because the construction industry is on the center of Green development, Green construction management is demanded for efficient analysis solution of building performance. BIM has a object-oriented parametric modeling technology. IT, which green building's performance management and analysis, is very useful. A green building certification is essential course in the green building construction. So this Paper suggest him based green building simulation system. The him based green building simulation system will support resonable decision making on the early construction phase.

  • PDF

A Study for Derivation of Participant's Information Flow At Framework Construction based on BIM (BIM 기반의 골조공사에서 참여자별 정보의 흐름 도출에 관한 연구)

  • Kim, Yong-Hwa;Lee, Ju-Sung;Oh, Jung-Keun;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.22-34
    • /
    • 2013
  • As construction project has been becoming larger, specialized and complicated, it is important to utilize a lot of information that is made by diverse participants. Especially this information is mainly produced in construction site that plays a leading role in construction project. The problem of information exchange between participants of construction site causes decline of construction productivity. So as to resolve this problem, there is a many interest in BIM(Building Information Modeling) that makes and manages a necessary data during building life cycle. But in Korea construction industry, applying BIM in construction phase is less active than in design phase. Through studying previous research, this study classify the main cause of failure related to information exchange in framework construction. And by interviewing expert, it draw a work that is possible to apply BIM. Next through analyzing framework construction site that is applied with BIM, this study proposes specific information flow model for supporting work by BIM.

A study on the Practical Adaptation of BIM Programs for Architectural Education (건축교육에서 BIM 프로그램 적용에 관한 연구)

  • Shin, Dong-Chul
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.11 no.4
    • /
    • pp.57-66
    • /
    • 2011
  • The advent of BIM(Building Information Modeling) design process based on the digital media has brought innovation to the production and management of AEC industry. Accordingly the need for educating BIM professionals has been radically increased both in the real world practice and in academia. Some developed countries have already been studying and establishing the optimized curriculum in the academic architecture courses for BIM based education with multi_efforts using the digital media as design processing tools focused on educating architectural professionals with creativity and productivity. However in the domestic education systems, it is hardly found that researches and curriculums deal with the BIM education in the academia. Thus the objective of this paper is to investigate the architectural design pedagogy in the advanced digital media setting in response to the urgent need for BIM education. This study focuses on developing the curriculum based on practical adaptation of BIM programs for architectural education. It aims to provide students with the basic understanding of BIM theory and the practice of BIM tools as an instrument enhancing the creativity for architectural design. Thus this study proposes an BIM curriculum for the students who first encounter the notion and knowledge of BIM during their academic years. And the education result after the application of this curriculum has been analysed through the students questionnaires before and after the lecture.