• Title/Summary/Keyword: BIM based Architectural Design

Search Result 171, Processing Time 0.025 seconds

Development of Rule-Set Definition for Architectural Design Code Checking based on BIM - for Act on the Promotion and Guarantee of Access for the Disabled, the Aged, and Pregnant Women to Facilities and Information - (BIM 기반의 건축법규검토를 위한 룰셋 정의서 개발 - 장애인,노인,임산부 등의 편의증진 보장에 관한 법률 대상으로 -)

  • Kim, Yuri;Lee, Sang-Hya;Park, Sang-Hyuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.6
    • /
    • pp.143-152
    • /
    • 2012
  • As the Public Procurement Service announced the compulsory of BIM adaption in every public construction from 2016, the importance of BIM is increasing. Besides, automatic code checking takes significance in terms of the quality control for BIM based design. In this study, rule-sets were defined for Act on the Promotion and Guarantee of Access for the Disabled, the Aged, and Pregnant Women to Facilities and Information. Three analytic steps were suggested to shortlist the objective clauses from the entire code; the frequency analysis using project reviews for architectural code compliance, the clause analysis on quantifiability, and the analysis for model checking possibilities. The shortlisted clauses were transformed into the machine readable rule-set definition. A case study was conducted to verify the adaptiveness and consistency of rule-set definitions. In future study, it is required the methodologies of selecting objective clauses to be specified and its indicators to be quantified. Also case studies should be performed to determine the pre-conditions in modeling and to check interoperability issues and other possible errors in models.

How to automatically extract 2D deliverables from BIM?

  • Kim, Yije;Chin, Sangyoon
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1253-1253
    • /
    • 2022
  • Although the construction industry is changing from a 2D-based to a 3D BIM-based management process, 2D drawings are still used as standards for permits and construction. For this reason, 2D deliverables extracted from 3D BIM are one of the essential achievements of BIM projects. However, due to technical and institutional problems that exist in practice, the process of extracting 2D deliverables from BIM requires additional work beyond generating 3D BIM models. In addition, the consistency of data between 3D BIM models and 2D deliverables is low, which is a major factor hindering work productivity in practice. To solve this problem, it is necessary to build BIM data that meets information requirements (IRs) for extracting 2D deliverables to minimize the amount of work of users and maximize the utilization of BIM data. However, despite this, the additional work that occurs in the BIM process for drawing creation is still a burden on BIM users. To solve this problem, the purpose of this study is to increase the productivity of the BIM process by automating the process of extracting 2D deliverables from BIM and securing data consistency between the BIM model and 2D deliverables. For this, an expert interview was conducted, and the requirements for automation of the process of extracting 2D deliverables from BIM were analyzed. Based on the requirements, the types of drawings and drawing expression elements that require automation of drawing generation in the design development stage were derived. Finally, the method for developing automation technology targeting elements that require automation was classified and analyzed, and the process for automatically extracting BIM-based 2D deliverables through templates and rule-based automation modules were derived. At this time, the automation module was developed as an add-on to Revit software, a representative BIM authoring tool, and 120 rule-based automation rulesets, and the combinations of these rulesets were used to automatically generate 2D deliverables from BIM. Through this, it was possible to automatically create about 80% of drawing expression elements, and it was possible to simplify the user's work process compared to the existing work. Through the automation process proposed in this study, it is expected that the productivity of extracting 2D deliverables from BIM will increase, thereby increasing the practical value of BIM utilization.

  • PDF

A Study on the Development of the Problem Improvement Directions in Enhancing BIM Data Interoperability through IFC (IFC를 통한 BIM 데이터의 상호연동 시 문제점분석 및 개선방향 설정에 관한 연구)

  • Kim, Ji-Won;Ock, Jong-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.6
    • /
    • pp.88-98
    • /
    • 2009
  • Construction industries have increasingly utilized Building information Modeling (BIM) technologies. Interoperability - the capability for BIM data to run from one computer application to another in the life cycle of a project has become one of the principal research areas. Enhancing interoperability inevitably requires information structures that are standardized throughout the construction industries. As a candidate of the data exchange standard, Industry Foundation Classes (IFC) has been developed and several researches recently performed to measure its richness of digital data exchange. But doubts have been brought up whether IFC meets a sufficient level of interoperability since the research result revealed a number of cases of information misrepresentation and loss. This research presents the lessons learned from the interoperability tests of three widely used 3D design applications including Graphisoft's Archicad, Autodesk's Revit, and Bentley's Bentley Architecture. One building's architectural and structural design data were modeled with the three tools and exchanged through IFC respectively for interoperability test.

Development of Green Template for Building Life Cycle Assessment Using BIM (건축물 LCA를 위한 BIM 친환경 템플릿 개발에 관한 연구)

  • Lee, Sung Woo;Tae, Sung Ho;Kim, Tae Hyoung;Roh, Seung Jun
    • Spatial Information Research
    • /
    • v.23 no.1
    • /
    • pp.1-8
    • /
    • 2015
  • The purpose of this study is to develope BIM Template according to major building material for efficiently and quantitatively evaluating greenhouse gas emission at the design stage. Template users consider various environmental impacts without connecting simulation tools for analyzing environmental impact and Template users who have no prior knowledge can Life Cycle Assessment by using The green template. For this study, Database which was reflected in template was constructed considering environmental performance. and 6 kinds of environmental impact categories and PPS standard construction codes were analyzed by major building material derived from literature. Based on this analyzed data, The major Material Family according to the main building material was developed. When users conduct modeling by utilizing Family established, evaluating result can be confirmed in the Revit BIM Modeling program by using the schedule function of the Revit. Users through the modeling, the decision-making environment performance possible. In addition, we propose to create a guideline for the steps required to build an additional established family.

A Study on Information Systematization of Detail Drawings for Connectivity between BIM Libraries and Technical Contents based on Information Framework (BIM 라이브러리-기술콘텐츠 연계를 위한 정보프레임워크 기반의 정보 체계화 연구-부분상세를 중심으로)

  • Jo, Chan-Won
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.10
    • /
    • pp.54-60
    • /
    • 2016
  • Building information modeling (BIM) has the advantage of having been utilized for various scenarios through a single model. Although extracting 2D drawings from BIM is one of the advantages, there are many difficulties when utilized in practical work. Architectural detail drawings are an important factor for expressing interior finishing materials and complicated construction methods, as well as for cost estimations. However, creating detail drawings does not have a standard, and each design company establishes its own detail drawings, so it is hard to share or exchange information in the construction industry. Therefore, this study suggests a systemized method for making detail drawings, and explains how it can be utilized as back data for quantity take-off and construction expenses linked with BIM libraries.

A Framework of Building Knowledge Representation for Sustainability Rating in BIM

  • Shahaboddin Hashemi Toroghi;Tang-Hung. Nguyen;Jin-Lee. Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.437-443
    • /
    • 2013
  • Recently, sustainable building design, a growing field within architectural design, has been emerged in the construction industry as the practice of designing, constructing, and operating facilities in such a manner that their environmental impact, which has become a great concern of construction professionals, can be minimized. A number of different green rating systems have been developed to help assess that a building project is designed and built using strategies intended to minimize or eliminate its impact on the environment. In the United States, the widely accepted national standards for sustainable building design are known as the LEED (Leadership in Energy and Environmental Design) Green Building Rating System. The assessment of sustainability using the LEED green rating system is a challenging and time-consuming work due to its complicated process. In effect, the LEED green rating system awards points for satisfying specified green building criteria into five major categories: sustainable sites, water efficiency, energy and atmosphere, materials and resources, and indoor environmental quality; and sustainability of a project is rated by accumulating scores (100 points maximum) from these five major categories. The sustainability rating process could be accelerated and facilitated by using computer technology such as BIM (Building Information Modeling), an innovative new approach to building design, engineering, and construction management that has been widely used in the construction industry. BIM is defined as a model-based technology linked with a database of project information, which can be accessed, manipulated, and retrieved for construction estimating, scheduling, project management, as well as sustainability rating. This paper will present a framework representing the building knowledge contained in the LEED green building criteria. The proposed building knowledge framework will be implemented into a BIM platform (e.g. Autodesk Revit Architecture) in which sustainability rating of a building design can be automatically performed. The development of the automated sustainability rating system and the results of its implementation will be discussed.

  • PDF

Strategy and Technology for Digital Transformation of Design and Construction of RC Structures (철근콘크리트골조 설계와 현장관리 디지털전환 전략과 기술개발)

  • Chee Kyeong Kim
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.36 no.4
    • /
    • pp.265-272
    • /
    • 2023
  • This paper presents a conceptual strategy and technologies for the digital transformation of design and construction of reinforced concrete (RC) structures. The development of an automated detail design strategy for RC structures is described. Integrated digital platform based on 5D BIM concept is proposed for the replacement of the current technology environment-based 2D CAD. Generally, the detail design development is labor-intensive and iterative. Effective automation of relevant aspects can dramatically improve productivity and accuracy. The proposed solutions for the automated BIM modeling based on the rebar and formwork detail design automation achieves the productivity and accuracy sufficient for site application. The platform integrates and manages the information flow between each solution or application and provides it to all participants of the project. Finally, it is expected that the proposed strategy and technologies can be further enhanced to achieve the productivity and accuracy needed for widespread site application and digital transformation.

A Framework Development for Sketched Data-Driven Building Information Model Creation to Support Efficient Space Configuration and Building Performance Analysis (효율적 공간 형상화 및 건물성능분석을 위한 스케치 정보 기반 BIM 모델 자동생성 프레임워크 개발)

  • Kong, ByungChan;Jeong, WoonSeong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.1
    • /
    • pp.50-61
    • /
    • 2024
  • The market for compact houses is growing due to the demand for floor plans prioritizing user needs. However, clients often have difficulty communicating their spatial requirements to professionals including architects because they lack the means to provide evidence, such as spatial configurations or cost estimates. This research aims to create a framework that can translate sketched data-driven spatial requirements into 3D building components in BIM models to facilitate spatial understanding and provide building performance analysis to aid in budgeting in the early design phase. The research process includes developing a process model, implementing, and validating the framework. The process model describes the data flow within the framework and identifies the required functionality. Implementation involves creating systems and user interfaces to integrate various systems. The validation verifies that the framework can automatically convert sketched space requirements into walls, floors, and roofs in a BIM model. The framework can also automatically calculate material and energy costs based on the BIM model. The developed frame enables clients to efficiently create 3D building components based on the sketched data and facilitates users to understand the space and analyze the building performance through the created BIM models.

Establishment of Integrated Design Bases Management System of APR1400 Using BIM based Algorithm (BIM기반 Algorithm을 활용한 APR1400 설계기준 통합관리 체계 구축)

  • Shin, Jaeseop;Choi, Jaepil
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.5
    • /
    • pp.52-60
    • /
    • 2019
  • The APR1400 is a 1400MWe nuclear power plant developed through national technology development project over a period about 10years. Approximately 65,000 design drawings are produced for APR1400 construction. In order to maintain consistency among numerous drawings, the highest level of design bases drawings (DBDs) are created according to design bases and this is used in the subsequent design. However, DBDs are produced and managed on a document basis and they are managed various field, it was difficult to accurately reflect the design bases information in the subsequent design. Therefore, this study recognizes limitations of the document based DBDs and develops a system that can accurately reflect the design bases information to subsequent design by adopting BIM based design bases integrated information system. Especially, by introducing DBIL(Design Bases Information Layer) concept, DBIL was created and analyzed based on five design bases(Physical protection, Fire protection, Internal missile protection, Internal flood protection, Radiation protection) applied to APR1400. In the final result DBIL set and Datasheet are integrated of room, design bases information, building data(wall, slab, door, window, penetrations). So it can be used for subsequent design automation and design verification. Furthermore, it is expected that APR1400 DBILs data can be used extensively in constructability and design economics analysis through comparison with next generation nuclear power plant.

BIM Energy Efficiency Plan for Verification of Building Envelop Energy Code of Housing in USA - Based on the NYC Energy Conservation Code - (미국 공동주택의 건물 외피 에너지코드 검증을 위한 BIM 에너지 계획 방안 -뉴욕시 에너지 코드를 기준으로-)

  • Heo, Jinwoo
    • The Journal of the Convergence on Culture Technology
    • /
    • v.8 no.4
    • /
    • pp.313-322
    • /
    • 2022
  • The number of architects who adopt BIM(Building Information Modeling) as the design method are gradually increasing because of its productivity and efficiency. Climate Change and Global Warming lead to legislation of new energy regulations and strengthen existing ones. The current architectural design methods (2D CAD) take a lot of time and effort to verify energy codes and are hard to adjust according to the design changes. The purpose of this study is to show the effectiveness of the BIM in building envelop energy modeling of the housing project. In the process of design method change, We could contribute to increasing productivity and efficiency in building energy verification through BIM because the updated value could be calculated simultaneously without information omission or recalculation process. The procedure for the study is as follows. Using BIM of the Goldin at Essex Crosing Housing Project by Revit 2011 as a case model, this study analyze the criteria for energy plan to conform to the energy code in NYC. The result value from the setting of the Revit model is compared with the reference value required by the NYC Energy Code. Finally, the data from BIM are entered into COMckeck, the energy verification program provided by U.S. Department of Energy, to check whether the building envelope energy performance conforms to NYC Energy Code.