• 제목/요약/키워드: BIM Use

검색결과 292건 처리시간 0.025초

Exploring Integrated Design Strategies for the Optimal Use of BIM

  • Park, Hyoung-June;Lee, Ji-Hyun
    • Architectural research
    • /
    • 제12권2호
    • /
    • pp.9-14
    • /
    • 2010
  • This paper introduces an experimental design studio that explores the optimal use of current digital technologies in order to employ Building Information Modeling at the early phase of design process. Based upon the outcomes from the aforementioned studio, the paper discusses the integrated design strategies for BIM in the design process. In this paper, BIM is proposed as a design tool that increases an overal design productivity more effectively and efficiently compared to BIM as a construction tool with encouraging a design communication among different partakers in the design process.

스마트 안전기술 시뮬레이션을 위한 BIM기반 VR 활용방안 연구 (A Study on the Use of BIM-based VR for Smart Safety Technology Simulation)

  • 이혜진;정상옥
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 가을학술발표대회논문집
    • /
    • pp.259-260
    • /
    • 2023
  • This study aims to build VR using BIM at our actual site, simulate it in a realistic background, and simulate new safety-related technologies being developed by our company rather than safety education contents to review optimal use plans for each field type so that the new technology can be effectively applied in the field.

  • PDF

A STUDY ON THE CONSTRUCTION OF BIM DATA INTEROPERABILITY FOR ENERGY PERFORMANCE ASSESSMENT BASED ON BIM

  • Jungsik Choi;Hyunjae Yoo;Inhan Kim
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.267-273
    • /
    • 2013
  • Early design phase energy modeling is used to provide the design team with first order of magnitude feedback about the impact of various building configurations. For better energy-conscious and sustainable building design and operation, the construction of BIM data interoperability for energy performance assessment in the early design phase is important. The purpose of this study is to suggest construction of BIM data interoperability for energy performance assessment based on BIM. To archive this purpose, the authors have investigated advantage of BIM-based energy performance assessment through comparison with traditional energy performance assessment and suggested requirement for construction of open BIM environment such as BIM data creation, BIM data software practical use, BIM data application and verification. In addition, the authors have suggested BIM data interoperability and BIM energy property mapping method focused on materials.

  • PDF

건설사업관리자의 BIM 수용에 영향을 미치는 요인 연구 (Factors Affecting the BIM Acceptance of Construction Managers)

  • 정용채;진상윤
    • 한국건설관리학회논문집
    • /
    • 제16권3호
    • /
    • pp.11-23
    • /
    • 2015
  • CM과 BIM은 건축물 전 생애주기 동안 발생되는 정보를 통해 각 분아별 협업체계 구축 및 업체 간의 원활한 의사소통을 해주는 유사점이 있으며 BIM은 CM의 업무수행과 서비스의 가치 향상을 위한 효과적인 정보관리도구로 활용될 수 있다. 그러나 CM에서 BIM 도입과 활용은 아직도 매우 제한적이다. 본 연구의 목적은 BIM 도입에 대한 CMr의 의도를 분석하고 CMr관점에서 효과적인 BIM 사용을 위한 전략을 수립하는 것이다. 본 연구는 TAM방법을 사용하였으며 다음과 같은 결과를 도출하였다. 1) CMr는 현재 BIM을 통해 자신의 인지도 향상, 경쟁력 및 역량 강화와 같은 이미지 향상 보다는 현재 자신의 업무에서 BIM이 적용되는 것이 사회적으로 요구되고 있는지를 중요하게 생각하고 있다. 2) BIM을 연계할 수 있는 업무를 도출하여 BIM을 활용할수 있는 업무프로세스를 구축하는 것이 중요하다고 생각하고 있다. 3) CMr가 BIM의 수용과 인식에 대해서는 궁극적으로는 받아들이지만 실제적인 업무에서 BIM 사용과 시도는 주저하고 있는 것으로 판단된다. 이와 같은 결과를 바탕으로 CM관점에서 BIM 활용 전략 수립 방향을 제시하였다.

Exploring Capabilities of BIM Tools for Housing Refurbishment in the UK

  • Kim, Ki Pyung;Park, Kenneth S
    • 한국BIM학회 논문집
    • /
    • 제6권4호
    • /
    • pp.9-17
    • /
    • 2016
  • Currently whole-house refurbishment for substantial energy efficiency improvement of existing housing stock is needed to achieve the targeted 80% CO2 emission reduction. As whole-house refurbishment requires a larger capital investment for lower CO2 emission, the simultaneous use of Life Cycle Costing (LCC) and Life Cycle Assessment (LCA) methodologies are recommended to generate affordable refurbishment solutions. However, two methodologies are difficult to use due to a lack of proper LCC and LCA datasets. As a response to the current problems, many researchers explore potentials in Building Information Modelling (BIM) to improve current construction practice. As a result, a BIM tool - IES IMPACT (Integrated Material Profile And Costing Tool) - has been introduced to the UK construction industry for simultaneous calculation of LCC and LCA. Thus, this research aims at examining the capability and limitation of the IES VE/IMPACT as a BIM tool for whole-house refurbishment. This research reveals that the IES VE/IMPACT is feasible for whole-house refurbishment by providing LCC and LCA information simultaneously for informed decision on refurbishment solution selection. This research shed lights on the current problems lying on the data exchange between two different BIM tools. It is revealed that additional efforts from construction professionals and industry are required to make reliable BIM objects library with LCC and LCA datasets.

발주처 관점의 시설물 생애주기 관리를 위한 BIM 기반 건설 프로젝트 사례 분석 (BIM based Construction Project Case Analysis for Facility Life Cycle Management from the Perspective of the Client)

  • 함남혁;김웅기;김재준
    • 한국BIM학회 논문집
    • /
    • 제10권3호
    • /
    • pp.12-21
    • /
    • 2020
  • From the perspective of the client, the value of information for use in facility management is very low at the point of use. This is because the facility owner, who is a non-professional, cannot accurately request necessary information from the perspective of long-term facility life cycle management. The purpose of this study is to define the information necessary for facility management and to analyze the project operation method to procur this information to the client using BIM. To this end, this study analyzed the role of client and contractor, project delivery process, standards, and submissions in the BIM-based procurement area through USACE Air Force Hospital project case analysis. As a result of the analysis, if the client, who is the subject of facility operation, defines in advance the type and input method of necessary information in the operation stage, the client can receive the BIM optimized for operation from the contractor. The results of this study can be used to establish standards for receiving information necessary for establishment of procurement process and facility management of public institutions considering BIM introduction.

중국 건설업 BIM 활용 장애요인 (Barriers to the use of BIM in the Chinese construction industry)

  • 송경욱;유정호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 봄 학술논문 발표대회
    • /
    • pp.267-268
    • /
    • 2021
  • Since the first BIM development outline was issued in 2011, China has initially tried to adopt BIM in the construction industry. After the BIM guide was issued in 2017, China has officially entered the era of building informatization in the construction industry. Through the statistical data of BIM application reports in China's construction industry from 2014 to 2020, this paper concludes that China has made great progress in the popularization rate of BIM, but has little effect in the adoption in actual projects. Through the reading and analysis of relevant documents in China, 13 obstacle factors for BIM technology adoption in construction enterprises are preliminarily defined.

  • PDF

Quantifying Values from BIM-projects life cycle with cloud-based computing

  • Choi, Michelle Mang Syn;Kim, Inhan
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.271-275
    • /
    • 2015
  • A variety of evaluation application and initiatives on the adoption of Building Information Modelling (BIM) have been introduced in recent years. Most of which however, focused mainly on evaluating design to construction phase-processes, or BIM utilization performances. Through studying existing publications, it is found that continuous utilization of BIM data throughout the building's life cycle is comparatively less explored or documented. Therefore, this study looks at improving this incomplete life cycle condition with the concept that accumulated BIM data should be carried forward and statistically quantified for cross comparison, in order to facilitate practitioners to better improve the projects the future. Based on this conceptual theory of moving towards a closedloop BIM building life cycle, this study explores, through existing literature, the use of cloud based computing as the means to quantify and adaptively utilize BIM data. Categorization of BIM data relations in adaptive utilization of BIM data is then suggested as a initial step for enhancing cross comparison of BIM data in a cloud environment.

  • PDF

시공 및 유지관리 단계에서 활용 가능한 단센서 기반의 BIM 구축을 위한 기초연구 (Advanced Sensor-based Building Information Modeling (BIM) for Construction, Operation, and Maintenance Phases of the Project Lifecycle)

  • 조민우;손효주;김창민;이주혁;김창완
    • 한국BIM학회 논문집
    • /
    • 제2권1호
    • /
    • pp.7-17
    • /
    • 2012
  • 건설 프로젝트의 정보를 프로젝트 참여자들이 공유하고 활용하는 것은 건설 프로젝트의 성공적인 수행 을 위한 중요한 요소로 작용한다. 최근 프로젝트 참여자들의 효과적인 정보의 공유 및 활용을 위한 도구로써 BIM에 관심이 집중되고 있다. BIM은 건설 프로젝트의 초기 계획 설계에서 유지관리 단계까지 프로젝트 참여자들이 필요로 하는 정보를 제공함으로써 프로젝트의 전체 생애주기 동안 활용 가능하다. 그러나 잦은 설계변경, 기존 도면의 분실 등으로 인하여 수행 중이거나 완공된 건설 프로젝트의 정확한 정보를 포함한 BIM의 획득이 어려워 시공 및 운영 단계에서 BIM 활용이 이루어지지 못하는 실정이다. 따라서 해외에서는 BIM 활용의 한계를 극복하고 건설프로젝트 전반에서 BIM을 활용하기 위하여 수행 중이거나 완공된 건설 프로젝트의 현장정보를 포함하는 BIM 구축을 위한 연구가 활발하게 진행되나 국내에서는 관련 연구가 매우 부족한 실정이다. 이에 본 연구의 목적은 건설 프로젝트의 시공 및 유지관리 단계에서 활용이 가능한 첨단센서 기반의 BIM 구축에 대한 필요성 제시에 있다. 이를 위해 본 연구에서는 먼저 국내 BIM 활용에 대한 문헌 연구를 통해 국내 BIM 활용의 문제점을 도출하였다. 문제점을 해결하기 위한 방법으로 첨단센서 기반의 BIM 구축을 제안하였으며, 관련 연구 고찰을 통해 향후 연구 방향을 제시하였다.

건축 자재 정보 시스템기반 BIM 라이브러리 비즈니스 모델에 관한 기초 연구 (A Basic Study on BIM Library Business Model based on Building Material Information System)

  • 이군재
    • 한국산학기술학회논문지
    • /
    • 제18권4호
    • /
    • pp.43-49
    • /
    • 2017
  • 최근 국내 건설 분야에서 BIM의 활용이 늘어나고 있는 추세이지만 도면을 포함하는 BIM 설계가 아닌 주로 내 외부 시각화와 같은 단순 활용에 그치고 있다. 이에 대한 원인으로 여러 연구에서 BIM 설계에 필요한 라이브러리의 부족과 경제적인 문제를 지적하고 있다. 즉, 경제적으로 영세한 대다수의 국내 설계사무소 입장에서는 필요한 BIM 라이브러리를 직접 제작하여 사용하기 위한 비용과 인력 투자가 힘들어 BIM 설계 활성화에 부정적 요인으로 작용하고 있다. 따라서 라이브러리를 경제적이며 쉽고 빠르게 공급받을 수 있다면 BIM 설계가 보다 적극적으로 이루어 질 수 있을 것이다. 본 연구에서는 기존 건축자재선정업무와 BIM 라이브러리를 고찰하여 경제적이며 쉽고 빠르게 BIM 라이브러리 서비스를 제공할 수 있는 BIM 라이브러리 비즈니스 모델과 고려요소들을 제시하였다. 제시한 비즈니스 모델은 국내에서 절대적으로 부족한 BIM 라이브러리 공급자를 늘려 적은 비용과 노력으로 효과적인 BIM설계가 가능하도록 할 것이다. 본 연구에서 제시한 비즈니스 모델을 반영한 서비스가 이루어진다면 설계, 시공, 유지관리 단계에서 일관된 정보공유가 가능한 통합데이터베이스가 구축될 것이다. 구축된 데이터베이스를 이용하면 건축물의 생애주기 동안 자재 및 설비 정보의 변화를 모니터링할 수 있기 때문에 자재 및 설비의 개량은 물론 효과적인 설계와 유지관리를 위한 실적데이터로 활용될 수 있을 것이다.