• Title/Summary/Keyword: BIM Quantity Take-off (QTO)

Search Result 7, Processing Time 0.023 seconds

Open BIM-based quantity take-off system for schematic estimation of building frame in early design stage

  • Choi, Jungsik;Kim, Hansaem;Kim, Inhan
    • Journal of Computational Design and Engineering
    • /
    • v.2 no.1
    • /
    • pp.16-25
    • /
    • 2015
  • Since construction projects are large and complex, it is especially important to provide concurrent construction process to BIM models with construction automation. In particular, the schematic Quantity Take-Off (QTO) estimation on the BIM models is a strategy, which can be used to assist decision making in just minutes, because 70-80% of construction costs are determined by designers' decisions in the early design stage. This paper suggests a QTO process and a QTO prototype system within the building frame of Open BIM to improve the low reliability of estimation in the early design stage. The research consists of the following four steps: (1) analyzing Level of Detail (LOD) at the early design stage to apply to the QTO process and system, (2) BIM modeling for Open BIM based QTO, (3) checking the quality of the BIM model based on the checklist for applying to QTO and improving constructability, and (4) developing and verifying a QTO prototype system. The proposed QTO system is useful for improving the reliability of schematic estimation through decreasing risk factors and shortening time required.

A Methodology of Open BIM-based Quantity take-off for Schematic Estimation of the Frame Work in Early Design Stage

  • Hansaem Kim;Jungsik Choi;Inhan Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.419-425
    • /
    • 2013
  • Recently AEC industry has required construction automation according to becoming large and complex. Thus BIM-based construction project is increased and used in whole fields of AEC industry. Quantity take-off and estimation fields are important factor for decision-making in conceptual and schematic design stages of construction projects. The purpose of this study improves reliability of the estimation through QTO based on Open BIM. Scope and method to apply QTO is to select conceptual design stage through LoD(Level of Detail) in AEC field and to extract information from BIM model through analysis of IFC structure. This study proceeds three step to make BIM model and check the model quality and calculate QTO. The methodology of QTO using IFC is to verify of result in this study and expects utilizing in design stage of construction projects. The result from this study is expected to decrease the risk factor and time of estimation in the project early phase through improving reliability of schematic estimation.

  • PDF

A Study on the Effective Calculation of Rebar QTO in the Early Design Phase through the Application of BIM Model (BIM 모델 활용을 통한 초기설계단계에서의 효율적인 철근물량 산출 방안 연구)

  • Lee, Jae-Cheol
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.35 no.5
    • /
    • pp.145-152
    • /
    • 2019
  • In this study, rebar QTO(Quantity Take-Off) was quickly produced from the BIM model prepared by Revit in the early design phase, and the available premium rates were quantitatively presented. For this purpose, the amount of rebar calculated using the BuilderHub, which specializes in calculating rebar QTO, was analyzed according to various factors such as member type, rebar diameter, building size, item type, and order length, and the effect of each factor on the rebar QTO was determined. In addition, the BIM model generated on Revit was used to establish parameters and processes required to produce rebar QTO, and proposed a rebar premium rate and a stirrup/hoop premium rate based on the BuilderHub output results. Through this study, it is expected that a rapid and efficient comparative evaluation of rebar QTO will be possible according to various structural design alternatives in the early design phase.

A Basic Study on an Application of Quantity Take-Off Requirements for Open BIM-based Schematic Estimation of Architectural Work (개방형BIM기반의 건축공사 개산견적을 위한 물량산출 적용지침 활용방안 기초 연구)

  • Kim, Inhan;Um, Sung-Gon;Choi, Jungsik
    • Korean Journal of Computational Design and Engineering
    • /
    • v.20 no.2
    • /
    • pp.182-192
    • /
    • 2015
  • In recent years, numerous studies have attempted to extract quantity data by using Building Information Modeling (BIM). In terms of open-BIM based quantity take-off at the early design stage, only few studies were conducted in the field of cost engineering. A lack of compatibility of open BIM for information exchange is postulated as the cause. The Industry Foundation Classes (IFC) extension model has been developed to accommodate the interoperability with quantity take-off software. Improvement of open BIM for quantity take-off needs exchange requirements and model guidelines. For this purpose, the quantity data of IFC models were analyzed using BIM analysis tools. This paper also provides a proposal of requirements on open BIM based quantity take-off at the early design stage. Further this study have been develop the interface system for open BIM based quantity take-off requirements with the results on this study.

Development of Quantity Take-off Building Information Modeling System for Retaining Wall (객체 기반 물량 산출을 위한 흙막이 BIM 설계 시스템 구축)

  • Kang, SeoungWoo;Kim, Eun-Seok;Lee, Si-Eun;Kim, Chee-Kyeong
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.35 no.4
    • /
    • pp.197-205
    • /
    • 2022
  • In this paper, a retaining wall system, developed using building Information modeling (BIM), is presented. Based on the information from a literature review, elementary technologies for the system were defined and developed. First, for the elementary technology, BIM libraries were constructed using standards and previous study results to achieve versatility and reusability. Second, methods for determining the quantity take-off (QTO) of a retaining wall were reviewed for an earth-work calculating system. Additionally, inverse distance weighting interpolation was used to generate topography. Finally, four formulas for calculating the QTO were proposed and devised for each element. After its development, the BIM system was analyzed and verified through comparison with a two-dimensional drawing-based QTO. The proposed system is deemed to be practical for determining the QTO of retaining walls and earth works. The contributions and limitations of the research are discussed in this paper.

Schematic Estimation Process using Architectural Object BIM Library

  • Lee, Ji Yong;Kim, In Han;Choi, Jung Sik
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.289-293
    • /
    • 2015
  • The construction industry has been evolving with the development of information technology. According to this trend, the current industry changes from 2d drawings to Building Information Modeling(BIM). Current studies on the BIM-based estimation have problems such as Quantity Take-Off(QTO) specificity toward a particular software, the uncertainty of the amount in accordance with the model quality. These studies focus on QTO based on BIM rather than schematic estimation. In addition, studies on the connection with the QTO and unit cost for schematic estimation are insufficient. The purpose of this study is to propose schematic estimation process by utilizing construction codes and QTO in architectural object BIM libraries. Construction codes are classified in detail in order to input codes inside each. This study has connected unit cost and construction classification codes that obtain from BIM model. The results of this study will be helpful in decision-making and communication for schematic estimation of the design phase. It will improve the efficiency and reliability problems of existing schematic estimation.

  • PDF

Evaluation on the Possibility of Connection Between IFC and Digital Quantity DataBase Exchange Standard (IFC와 디지털 수량산출정보 교환표준의 연계 가능성 평가)

  • Won, Ji-Sun;Moon, Jin-Seok;Choi, Won-Sik
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.12
    • /
    • pp.6488-6494
    • /
    • 2013
  • Recently, BIM has attracted attention as a technology to improve the construction productivity. The BIM standards to be applied to the BIM project are necessary for using or connecting the current 2D-based drawing standards. To develop the standard for BIM-based QTO and cost, this paper focused on using QDBEx, which was applied to road project cost management and connecting QDBEx with IFC, which is the BIM data delivery format. The IFC schema was evaluated to determine if it is possible to use the converts to the QDBEx XML file. As a result, 66% of the whole was available to connect directly, and 17% was available to connect through the processing of instance. The remaining 17% was evaluated to determine if it was available to connect. In the future, improvements in the schema will be suggested based on these results.