• Title/Summary/Keyword: BIM Design Tool

Search Result 71, Processing Time 0.028 seconds

A Study on the Development of a BIM Design Tool for Hanok Windows and Doors (BIM을 활용한 한옥 창호 설계 도구 개발에 관한 연구)

  • Choi, Joong-Hyun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.12
    • /
    • pp.7331-7339
    • /
    • 2014
  • As the Korean government initiates the Han-style campaign, the efforts and expectations for the modernization and industrialization of Hanok are growing. Accordingly, a major R&D project sponsored by the government is in progress for the development of related technologies, in which the development of a Hanok design support system based on Building Information Modeling(BIM) technology is included as one of the major subjects. However, the development of design tools for Hanok so far has not focused on the windows and doors, which is another major element of Korean traditional architecture. Therefore, this study developed a BIM-based design tool for Hanok windows and doors as an approach to the integrated design of various Hanok elements and their applications to modern buildings. To this end, the characteristics of Hanok windows and doors were analyzed first in terms of the location, opening method, style, components, and the over-all construction. A design tool was then developed with the parametric modeling functions of the $ArchiCAD^{(R)}$system. The applicability and efficiency of the developed tool were verified with design simulations. This is expected to contribute to not only the application of Hanok windows and doors to modern buildings but also to the further development of an integrated Hanok design system.

BIM(Building Information Modeling) (긴급제언: BIM 소개)

  • Cho, Han-Kwang
    • Journal of the Korean Professional Engineers Association
    • /
    • v.43 no.5
    • /
    • pp.31-34
    • /
    • 2010
  • To construct buildings methods and materials written on the book have been operated and managed with additional program as well as management techniques. However with 2D, a tool which has been used to design a plan, or simple 3D modeling weren't competent enough to plan, design and manage the buildings that are getting complex and higher To solve these problems BIM that enable steps(from planning, designing to maintenance management) to be used as a information is being used.

  • PDF

A Study for Automated Division of Composite Walls for Quantity Take-off in Construction Document Phase (실시설계단계에서 수량산출을 위한 복합벽체 자동분할에 관한 연구)

  • Park, Seunghwa;Kim, Heungsoo;Yoon, Dooyung
    • Korean Journal of Computational Design and Engineering
    • /
    • v.20 no.2
    • /
    • pp.124-132
    • /
    • 2015
  • When Building Information Modeling (BIM) was introduced at the early stage, it was only utilized as a three-dimensional visualization tool. Nowadays, however, BIM is being studied for increasing design productivity and managing enormous information on building life cycle. One of the representative research is developing 'common prototype BIM libraries'. BIM data made of common prototype libraries should be utilized in various ways, quantity takeoff, code checking, energy analysis and so on. However, common prototype BIM libraries are not enough to estimate accurate cost. For example, composite wall libraries should be divided into several single objects, wall structure and finishes, for the quantity takeoff and construction cost calculation. In this paper, we are suggesting an automated division algorithm of composite wall and developing a system prototype for it. This study is expected to reduce extra modeling work and contribute to fast and accurate cost calculation in the construction.

A Study on Improving Usability focused User Interface in the BIM tool sets - Focused on Preliminary-Design and Schematic-Design in Architecture - (BlM 도구의 사용자 인터페이스 개선사항에 관한 연구 - 건축기획과 계획 설계 과정을 중심으로 -)

  • Jeong, Hyeock-Jin
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.9 no.1
    • /
    • pp.31-40
    • /
    • 2009
  • This study is intended to suggest methodologies in theory that is dedicated to improve existing features in BlM tool sets and introduce a new horizon for developing new features in the future so that more functionality can be provided to the work process of architect. To be more utilized of BlM tool sets in a useful way, it is important to make sure to program a calculation method used in the design process which is based on the information provided by architect, such as design item with detailed process and transformed parametric information on warranty data. Finding pros and cons in the usability from the well-known 3D modeling applications and taking highly usable UI features from the existing applications, and using a common wording were carried out. Design architect identifies reusable parametric information and then finds an algorithm between each items so that BlM tool sets can contribute to design field in the future. Therefore, the formula has been developed for the items considering business aspects and architecturing size in the preliminary-design, and design aspects in the schematic design with idendifying inputs and outputs that is necessary to become fixed factors.

  • PDF

BIM Based Extension of Curved Member Prototypes in Korean Traditional Buildings (BIM에 기반한 한국전통건축 원형의 곡형부재 응용)

  • Park, Soo-Hoon
    • Korean Journal of Computational Design and Engineering
    • /
    • v.17 no.6
    • /
    • pp.426-435
    • /
    • 2012
  • This paper starts with an approach to Korean traditional building design using BIM tool as a design methodology where Korean traditional buildings show some difference rather as weaknesses in handling curves and curved members and the construction. BIM design tools, that are adequate in treating modern architectural design vocabularies, show some disadvantages not having necessary elements and components as building libraries. In this paper we build our own libraries adequate to the proper assembling way of Korean traditional buildings. In contrast to the diverse use of straight building members, Korean traditional buildings show rare use of curves and/or curved members in their assemblage. Moreover, in the case of a circular plan, mostly a circle is interpreted in terms of polygons such as square, hexagon or octagon. In this paper, we examine Gwanram-Jung in Changduk Palace, which is probably the only example in Korea showing a use of curves and/or curved members in assemblage. We try to interpret the case as an incomplete prototype and apply in a modern way to complete a circular plan in terms of circular arcade.

A Study for BIM based Evaluation and Process for Architectural Design Competition -Case Study of Domestic and International BIM-based Competition (BIM기반의 건축설계경기 평가 및 절차에 관한 연구 -국내외 BIM기반 건축설계경기 사례를 기반으로-)

  • Park, Seung-Hwa;Hong, Chang-Hee
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.2
    • /
    • pp.23-30
    • /
    • 2017
  • In the AEC(Architecture, Engineering and Construction) industry, BIM(Building Information Modeling) technology not only helps design intent efficiently, but also realizes an object-oriented design including building's life cycle information. Thus it can manage all data created in each building stage and the roles of BIM are greatly expanded. Contractors and designers have been trying to adopt BIM to design competitions and validate it for the best result in various aspects. Via the computational simulation which differs from the existing process, effective evaluation can be done. For this process, a modeling guideline for each kind of BIM tool and a validation system for the confidential assessment are required. This paper explains a new process about design evaluation methods and process using BIM technologies which follow the new paradigm in construction industry through complement points by an example of a competition activity of the Korea Power Exchange(KPX) headquarter office. In conclusion, this paper provides a basic data input guideline based on open BIM for automatic assessment and interoperability between different BIM systems and suggests a practical usage of the rule-based Model Checker.

AUTOMATIC AS-IS BIM EXTRACTION FOR SUSTAINABLE SIMULATION OF BUILT ENVIRONMENTS

  • Chao Wang;Yong K. Cho
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.47-51
    • /
    • 2013
  • Existing buildings now represent the greatest opportunity to improve building energy efficiency. Building performance analysis is becoming increasingly important because decision makers can have a better visualization of their building's performance and quickly make the solution for improving building energy efficiency and reducing environmental impacts. Nowadays, building information models (BIMs) have been widely created during the design phase of new buildings, and it can be easily imported to third party software to conduct various analyses. However, a BIM is not always available for all existing buildings. Even if a BIM is available during the design and construction phases, it is very challenging to keep updating it while a building is aged. A manual process to create or update a BIM is very time consuming and labor intensive. A laser scanning technology has been a popular tool to create as-is BIM. However it still needs labor-intensive manual processes to create a BIM out of point clouds. This paper introduces automatic as-is simplified BIM creation from point clouds for energy simulations. A framework of decision support system that can assist decision makers on retrofits for existing buildings is introduced as well. A case study on a residential house was tested in this study to validate the proposed framework, and the technical feasibility of the developed system was positively demonstrated.

  • PDF

A study on the Analysis of Building Information Modeling Factors of Construction Firms Using an Analytic Hierarchy Process (계층분석법을 이용한 BIM(Building Information Modeling)이 건설사에 미치는 영향요인 분석에 관한 연구)

  • Shim, Jin Kyu;Yi, Hye In;Kim, Jae Jun
    • KIEAE Journal
    • /
    • v.10 no.4
    • /
    • pp.123-130
    • /
    • 2010
  • A lot of construction companies in overseas markets of construction try to change 2D CAD to 3D CAD for improving business ability and change to Building Information Modeling(BIM) for integrating information produced from construction life cycle. In America, GSA(General Service Administration) requires a design drawing planed by BIM and in Singapore and Europe, the government encourages architectures to use this tool. Recently in the domestic market, many organizations related construction industry are aware of importance of 3D CAD integrated information, and try to use BIM. Therefore, this research would analyze how does BIM affect construction industry and derive influence factors and provide basic data for using BIM.

A Study on the Development of Architectural Design Tool supporting Realtime Evacuation Simulation (실시간 탈출 시뮬레이션을 지원하는 건축 디자인도구 개발에 관한 연구)

  • Lee, Yun Gil
    • Journal of Korea Multimedia Society
    • /
    • v.18 no.5
    • /
    • pp.641-651
    • /
    • 2015
  • This study intends to develop an evacuation simulation system based on BIM in a real-time manner. The proposed system, an add-on module for Revit Architecture and one of the most popular BIM authoring tools, supports the architectural design as well as real-time evacuation simulation of the design alternatives. This paper introduces the developed system, named SafeBIM, and the design process on which it is based. To evaluate the possibilities of the proposed system in the educational field of architectural design, this study included a feasibility test with college students in an architectural design studio.

BIM based Data Exchange System of Welded Wire/bar Mat for Pre-fab RC Members (BIM 기반 프리패브 부재의 용접철근매트 정보교환 시스템)

  • Jung, Jae-Hwan;Kim, Do-Hyeong;Kim, Hyun-Gi
    • Journal of KIBIM
    • /
    • v.11 no.1
    • /
    • pp.21-30
    • /
    • 2021
  • Reinforcing bars, a major component of the pre-fab structure, adheres to the existing on-site assembly method and attempts to develop and commercialize the technology of the pre-assembly method, but the effect is insignificant. Welded Wire / Bar Mat (WBM) has various advantages such as commercialization of rebar through machine manufacturing to improve workability, but it is different from the existing design and the construction method is different from the previous one. Therefore, to maximize the advantages of WBM and improve productivity, manufacturing, transportation, and construction from the design stage should be considered based on BIM from the initial design stage. In this paper, the concept of the design support system for the WBM was established based on the use of BIM in concrete reinforcement and the preliminary research on the WBM. WBM conversion design was performed for the existing prefabricated members, and based on this, the exchange format and system of the master prefabricated model with the WBM design data were set up. As a result of the pilot test, it was found that the traditional reinforcing bar information extracted from the master prefab model has transmitted 100% accurately. As for the WBM information, 100% of the information on the straight reinforcement was transmitted and represented, and the information on the bent reinforcement was found to have a 90% recall in the master BIM tool.