• Title/Summary/Keyword: BIM Adoption

Search Result 63, Processing Time 0.025 seconds

Integrated Information Management for Composite Object Properties in BIM (BIM 복합객체에 대한 속성정보의 통합관리)

  • Kim, Karam;Yu, Jungho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.2
    • /
    • pp.97-105
    • /
    • 2015
  • Building information modeling (BIM)-based construction projects have increased and become more varied, and as such the management of BIM-based facility information is also increasingly important for facility maintenance. Information management, and specifically product data mapping, however, has some problems in the area of manual data entry and does not adequately consider the exchange requirements of facility maintenance. Therefore, it is necessary to introduce a method to improve the management of composite object information for BIM-based facility maintenance so that it can handle construction operation building information exchange (COBie) data for a composite object. Therefore, we present a method to map COBie data to related materials of a composite object. This research contributes to increasing the efficiency and accuracy of the required information mapping between a building model and product data using a BIM library through optimal BIM data adoption. Moreover, it allows for the creation and management of specific product data at the design development phase.

A Study on the Interoperability Improvement of IFC Property Information for Energy Performance Assessment in the Early Design Phase (초기 설계단계 건물 에너지 성능평가를 위한 IFC 속성정보 호환성 향상에 관한 연구)

  • Kim, Inhan;Yoo, Hyunjae;Choi, Jungsik
    • Korean Journal of Computational Design and Engineering
    • /
    • v.17 no.6
    • /
    • pp.456-465
    • /
    • 2012
  • Nowadays, AEC industry tries to adopt BIM for low-carbon and eco-friendly building development. With increasing environment policies, many of global construction projects require the adoption of BIM for its many advantages. The advantages can be maximized with Open BIM since it can produce optimal results for various purposes of energy performance assessment. However there are some troubles in representation and property information in the process of Open BIM based energy performance assessment. To examine such troubles, this study focuses on differences between IFC of Open BIM and IDF format of Energy Plus known as the most accurate and diverse energy performance assessment. Two issues the study addresses are form representation and property information. The study figures out the different definition of IFC and IDF, and suggests the way of interoperability. The interoperability test of IFC for building energy performance assessment hope to develop of Open BIM based energy assessment.

Adoption of Virtual Technology to the Development of a BIM based PMIS

  • Suh, Bong-Gyo;Lee, Ghang;Yun, Seok-Heon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.4
    • /
    • pp.333-340
    • /
    • 2013
  • As construction projects become bigger, PMIS is being used as a project collaboration tool for project participants, owners, designers, inspectors and contractors. As the data type used in PMIS is usually text and most PMIS have no standard information classification system, there is a problem with data usability, such as the capacity for data search and analysis. BIM uses Objects and Properties, and this information might be used for relating with other construction information. As such, BIM technologies can be used with PMIS to enhance the data usability. The web environment is very convenient for multiple users, but the problem is that the data transfer speed is low for big files such as BIM model files. In this study, we suggested a Virtual Technology (VT) application to enhance the performance of BIM data exchange in PMIS, and tested and analyzed its efficiency when it is used to integrate BIM and PMIS in the web environment. The results of the study showed that VT can be used to enhance the efficiency of BIM data exchange in the web environment.

Evaluation of International BIM Standard Contracts to establish BIM Copyrights and Operational Protocols in Korea (국제 BIM 표준계약서 분석을 통한 국내 BIM 저작권 보호 및 운용 체계 수립에 관한 연구)

  • Koo, Bonsang;Shin, Byungjin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.6
    • /
    • pp.24-30
    • /
    • 2016
  • Building Information Modeling, and its associated work practices, requires project participants to share not only 3D geometric data, but also information in the model that may be considered proprietary and even trade secrets. Thus protection of intellectual property, or BIM copyrights, must be in place for participants to share proprietary information among project stakeholders. Currently Korea does not have adequate copyright laws or mechanisms to provide such protection. This research examined three BIM copyright legal documents, namely U.S.' ConsensusDOCS 301, AIA Document E203/G202, and U.K.'s CIC BIM Protocol to determine how copyright protection is realized, and to formulate appropriate stipulations within the Korean construction context. The resultant requirements include stipulating ownership at to the BIM originator, adopting a license-sublicense scheme, employing a federated model, and use of a formal model delivey table to allocate responsibilities. Given Korea's adoption stage, liability should be minimal, and license revocation should be allowed if payments are not met. The three BIM legal documents focus on practical measures that allow participants to customize requirements for individual projects, and such conventions should be emulated in Korea.

BIM based Design Optimization and Constructability Improvement for Adoption of Pre-construction Service. (프리컨스트럭션 서비스 도입을 위한 BIM 기반 설계 최적화 및 시공성 검토)

  • Lee, Chang-Hee;Lee, Jeong-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.11a
    • /
    • pp.187-188
    • /
    • 2017
  • Korean government is trying to adopt 'CM at Risk(CMR)' method to solve some problems of traditional project delivery method such as cost increase, delay, low quality. Pre-construction service(PCS) is a project management methodology of CMR and BIM is the best tool for efficient PCS execution. PCS is consisted of several main items such as Target costing, Cost trending, GMP, Design optimization, Constructability review and Productivity. The purpose of this research is to analyse contractor's PCS application case result and to find improvement items.

  • PDF

ADOPTION OF VIRTUAL TECHNOLOGY TO BIM BASED PMIS

  • Suh, Bong-Gyo;Ghang Lee;Yun Seok-Heon
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.103-106
    • /
    • 2013
  • As construction project becomes big, PMIS has been progressed and developed as collaboration tool between project participants. But recently it has been transformed from collaboration function tool to one of formal systems, and used as a simple report or just database system. Many researches have been actively studying how to combine BIM to PMIS for solving the problem. There need transferability from PMIS to BIM, however, data size is getting big because of complexity in building size. Many users experience inconvenience in slow loading speed. Therefore, this study suggested an improvement method for high transferability by utilizing virtual technology of IT industry and analyses its suitability.

  • PDF

Development of BIM-based Work Process Model in Construction Phase (시공단계의 BIM기반 건설사업관리 업무절차 모델 개발)

  • Yu, Yongsin;Jeong, Jiseong;Jung, Insu;Yoon, Hobin;Lee, Chansik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.1
    • /
    • pp.133-143
    • /
    • 2013
  • BIM can be utilized variously in construction management(CM) in the respect that it helps to manage comprehensively the construction information and make reliable decisions, but the adoption of BIM is insufficient in the CM area. The purpose of this study is to develop work process models and their guides in order to utilize BIM effectively in CM work at construction stage. This study defined BIM functions as 'BIM converting design', 'Model review', 'Data extraction', 'Automatic estimate', '4D simulation', 'Drawing creation', 'Engineering sector linkage analysis' through literature search, and generated CM works applicable to BIM by analyzing the CM work and process. This study developed BIM-based CM work process models by reconstructing the existing work process in connection with BIM function through an analysis on the relationship between BIM function and CM work, and reconstructing the role of each project participants. In order to improve the usefulness of the developed models, guides that described the BIM works of project participants were prepared through interviews and case studies. To validate the utilization of the models, a comparative analysis on the BIM process of precedent studies was also made and a survey was conducted on experts. This study can contribute to increasing the utilization of BIM in the CM area and can be helpful for CM companies to develop an in-house BIM guide. In the future, it will be necessary to make an assessment on the models from a business perspective through case applications and constantly update BIM-based CM work process model in consideration of the expansion of CM work due to the application of BIM.

BIM model-based structural damage localization using visual-inertial odometry

  • Junyeon Chung;Kiyoung Kim;Hoon Sohn
    • Smart Structures and Systems
    • /
    • v.31 no.6
    • /
    • pp.561-571
    • /
    • 2023
  • Ensuring the safety of a structure necessitates that repairs are carried out based on accurate inspections and records of damage information. Traditional methods of recording damage rely on individual paper-based documents, making it challenging for inspectors to accurately record damage locations and track chronological changes. Recent research has suggested the adoption of building information modeling (BIM) to record detailed damage information; however, localizing damages on a BIM model can be time-consuming. To overcome this limitation, this study proposes a method to automatically localize damages on a BIM model in real-time, utilizing consecutive images and measurements from an inertial measurement unit in close proximity to damages. The proposed method employs a visual-inertial odometry algorithm to estimate the camera pose, detect damages, and compute the damage location in the coordinate of a prebuilt BIM model. The feasibility and effectiveness of the proposed method were validated through an experiment conducted on a campus building. Results revealed that the proposed method successfully localized damages on the BIM model in real-time, with a root mean square error of 6.6 cm.

Development of BIM Utilization Level Evaluation Model in Construction Management Company (건설사업관리기업의 BIM 활용수준 평가 모형 개발)

  • Jeong, Seo-Hee;Kim, Gwang-Hee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.4
    • /
    • pp.24-33
    • /
    • 2024
  • Recently, as smart construction has become more active, construction companys are evaluating their smart construction capabilities in order to transform into smart construction companies. However, the revitalization of smart construction doesn't only apply to construction companies, the level of utilization of all participants, including owners, designers, construction project managers, and construction company, must be improved. Therefore, this study aims to present a model that evaluate the building information modeling (BIM) utilization level for measuring the BIM utilization level of construction management companies in executing construction project management. In this study, an AHP questionnaire survey targeting BIM practitioners to calculate the weight of each BIM utilization item and score it to construct evaluation model and evaluate it by applying it to construction management companies are conducted. As a result of the evaluation using model, there were differences between companies in the number of BIM users, and in the qualitative evaluation, it is mainly used for interference review, constructability review, and design change management. Therefore, in order to revitalize BIM, it is believed that it is necessary to strengthen BIM utilization ability through separate training for construction manager (CMr) and to present clear utilization standards and scope of work for BIM utilization in performing construction management tasks. Consequently, evaluating more construction management companies using the model presented in this study will result in the transition of CM companies to smart construction and revitalization of BIM adoption.

Development of BIM based Maintenance Management Prototype System for Wastewater Treatment Plant (BIM 기반 하수처리시설 유지관리 프로토타입 시스템 개발)

  • Um, Dong-Yong;Choi, Jae-Ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.6
    • /
    • pp.1901-1910
    • /
    • 2014
  • Current domestic and overseas BIM practice and research efforts show very few examples that design and construction BIM data could be successfully used for efficient operation and maintenance (O&M) of infrastructure in particular. This study takes public wastewater treatment plant requiring an enhancement of operation and maintenance capability into account to develop a prototype BIM-based maintenance management system. The system is designed and implemented following a typical system development procedure and validated by the system outputs per four scenarios being considered to be main maintenance activities: The research results are expected to contribute to the upgrade of current wastewater treatment plant maintenance level, which is more demanded as water-related regulation and policy direction changes to region-based large scale O&M and asset management adoption, and overseas market participation.