An Analysis on affecting factors about lowly using 3D CAD by using the AHP (계층분석법을 이용한 3D CAD 활용 저조에 대한 영향 요인 분석 연구)

  • Lee, Sang-Hyo;Kim, Ju-Hyung;Kim, Kyung-Hwan;Lee, Yoon-Sun;Kim, Jae-Jun;Ahn, Byung-Ju
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.6
    • /
    • pp.188-196
    • /
    • 2007
  • Because the construction is becoming bigger and the construction environment is rapidly changing, IT/IS(Information Technology and Information System) of the construction is recently suggested with the alternative proposal. So not only is a study progressed in the area of the BIM(Buidilng Information Modeling), VC(Virtual Construction) and CIC (Computer-Integrated Construction) but also of the information database of the construction for building the information infrastructure of the construction in the domestic construction. Because object-oriented 3D CAD improves the efficiency of a design work and includes the object information which can use with the base of the information database of the construction, it has the high value not only in the design level but also in the construction life cycle. But compared with the effect, the use of 3D CAD is sluggish in the construction. In this study, after surveying about lowly using 3D CAD on the point of AEC (Architect-Engineer-Contract), the result is analyzed with AHP(Analytic Hierarchy Process). So the aim of this study is to offer the base to find the solution of the Affecting factors about lowly using 3D CAD.

Workspace Generation and Interference Optimization Algorithm by Work-type using 3D Model Object in a Construction Project (건설프로젝트의 작업유형별 3차원 작업공간 생성 및 간섭 최적화 방안)

  • Kim, HyeonSeung;Moon, HyounSeok;Kim, ChangHak;Kang, LeenSeok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.6
    • /
    • pp.1911-1918
    • /
    • 2014
  • The increase of input resources, such as labor and equipment, in a construction project causes workspace interference between activities and it influences on the productivity and quality of construction activities. To solve this problem, many studies related to the workspace interference have been performed, however they verified the workspace concerning with only the geometric location of activities or generated the shape of workspace by a whole object concept not separated units of detailed operations. It is difficult for project manager to reasonably analyze the workspace conflict, because the size of workspace cannot reflect the characteristics of an activity and input time of a resource. This paper presents a methodology that can generate three-dimensional models in order to optimize the workspace shape and size by considering with the characteristics of each activity and input time of each resource. The suggested method can be used for the active BIM system that optimizes the workspace conflict without additional construction duration and for the searching algorithm of optimized moving path for construction equipment.

Development of Active 5D CAD System for Replaning Progress Schedule According to Change of Project Cost (사업비 변동에 따른 공정계획 재수립을 위한 능동형 5D CAD 시스템 개발)

  • Kim, Hyeonseung;Kang, Leenseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.5
    • /
    • pp.54-61
    • /
    • 2016
  • The initial planned annual cost is frequently adjusted under the construction process in construction projects. If the annual cost is reduced than the initial planned cost, the number of possible activities is also reduced from initial planned progress schedule. In such cases, project manager need to replan the progress schedule with possible activities within changed annual cost. However, most project manager will proceed as planned schedule without any change. After the project cost has been exhausted, there are many cases to stop the operation of the construction site. This study developed active 5D CAD system that can replan the progress schedule within changed annual cost and simulate the cost status according to the changed schedule for cost visualization. This system can be used as a decision-making tool in the replaning progress schedule and will be able to increase the practical usability of 5D CAD system.