• Title/Summary/Keyword: BIM 설계기법

Search Result 39, Processing Time 0.022 seconds

Identification of Claim Elements for Design Build Projects using FMEA Method (FMEA 기법을 이용한 설계시공일괄방식 주요 클레임 요인 도출)

  • Yoon, Seokmin;Hyun, Changtaek;Han, Sangwon;Cha, Yongwoon
    • Journal of KIBIM
    • /
    • v.5 no.2
    • /
    • pp.26-33
    • /
    • 2015
  • Design-build projects were devised to enhance the design technologies of the domestic construction industry and the efficiency of public works, contributing greatly to the development of construction technologies. However, as various stages of the process, such as formulation of basic plans and design documents, and deliberations proceed, claims, including changes in the requirements of clients, and design changes occur. These claims result in the delay in construction and an increase in construction costs. In this regard, this study attempted to identify main claims that delay construction and increase the costs of design-build projects, prevent claims in the future, and improve the efficiency of project implementation.

A Study of Augmented Reality based Visualization using Shape Information of Building Information Modeling (BIM 형상정보를 이용한 증강현실기반 가시화 사례)

  • Heo, Kyung-Jin;Lee, Seok-Jun;Jung, Soon-Ki
    • Spatial Information Research
    • /
    • v.20 no.2
    • /
    • pp.1-11
    • /
    • 2012
  • In the current construction planning and designing process, an architectural miniature model was designed to verify the interior or exterior spatial sense of a building structure, but building of the miniature model is demand much more effort and time; in addition to this it has limitation to identify interior information of the building. For a complement of it, CAD would be used in the existing planning and designing process to visualize the building information, but its visualization is not satisfactory for the 3D volume which could be easily verified with the miniature model. CAD is the specific software for designing building structures and the 3D results are usually rendered on 2D monitor screen. Therefore, there is a shortage of cognitive immersion for the 3D space. In this paper, we introduce the conversion process of BIM shape data into the Augmented Reality contents by using a series of softwares. As a result of modification on construction plan or design we reduced the cost and time to reconstruct the final visualization. We have shown that the interior or exterior information of the building structures are easily visualized with BIM shape data on augmented reality environment. Several proposed interaction methods, such as rem oval of building components, and slice-cut operation, provide the user for the effective manipulation of models on the augmented reality environment.

A Study on a Technique for Simplifying the Connection of a 3D Model and Schedule Information for 4D Simulation (4D 시뮬레이션을 위한 3D 모델 및 공정 정보의 연계 간소화 기법 연구)

  • Park, Sang Mi;Lee, Jae Hee;Yoon, Hyeong Seok;Hwang, Jae Yoeng;Kang, Hyo Jeong;Kang, Leen Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.6
    • /
    • pp.861-868
    • /
    • 2022
  • A key use of applying building information modeling (BIM) to the construction stage of a project is to help identify construction obstacles and to visualize construction status according to the progress of the construction schedule. When employing 4D simulation for this purpose, start and finish dates for each activity and a 3D model of the activity must be prepared. In this work, in order to simplify the configuration of a 4D model, minimum attribute information of the BIM model produced in the design stage was used to construct a system that generated activity information in the construction stage using a clustering algorithm. Its usefulness as actual schedule management information was then analyzed.

A Study on the Problem Analysis and Quality Improvement in Fabricating Free-Form Buildings Facade Panels through Mock-up Panels Production (Mock-up 부재제작을 통한 비정형 건축 외장부재의 제작 문제점 분석 및 개선방안에 관한 연구)

  • Kwen, Soon-Ho;Shim, Hyoun-Woo;Ock, Jong-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.3
    • /
    • pp.11-21
    • /
    • 2011
  • The most critical issue in free-form buildings is how to construct the free-formed exterior facade panels. Their geometric complexity delivers many cons and problems in fabricating and constructing their shapes. To construct a free-form building, first of all, its skin has to be chopped into small pieces, which is called panelization. After panelization, the panels go through an optimization process to construct them economically. The panel's geometries are modified or regenerated through this optimization process. In this study, the panel optimization process of free-form buildings are performed through a case study. The panel shapes of the case study are modeled with Digital Project. To test the constructability of the various panels, 8 mock-up panels are made and laser scanning technology is applied to measure the preciseness of the panels manufactured in comparison with their original design.

Research on Possible Method to Converge IT and Architectural Design Techniques for Efficient Design of Elderly Housing (효과적 고령자 주거 설계를 위한 IT와 건축 설계 기술의 융합 가능 방안 연구)

  • Bae, Hong-min;Kim, Byung-Seo
    • Journal of Internet Computing and Services
    • /
    • v.17 no.4
    • /
    • pp.87-93
    • /
    • 2016
  • Since aging population in Korea is rapidly progressing, the need for improving the life quality of the elderly has been increasing. Accordingly, in order to respond in a residential environment improvement and behavior change for the elderly, architecture design and construction methods have become converted into a modular construction method and various IT systems for the elderly have been proposed. Unlike current residential design techniques for the elderly in which architectural design techniques are performed separately with IT system design, the methodology for converging architectural design techniques with IT has not been discussed and proposed. Therefore, this paper extensively studies about requirements for converging architectural design techniques with IT such as elderly behavior, residential IT Service plan factor analysis, and residential modular construction method including IT services.

Simulation based Target Geometry Determination Method for Extrinsic Calibration of Multiple 2D Laser Scanning System (다중 2D 레이저 스캐너 시스템의 외부 표정요소 캘리브레이션을 위한 시뮬레이션 기반 표적 배치 결정 기법)

  • Ju, Sungha;Yoon, Sanghyun;Park, Sangyoon;Heo, Joon
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.36 no.6
    • /
    • pp.443-449
    • /
    • 2018
  • Acquiring indoor point cloud, using SLAM (Simultaneous Localization and Mapping) based mobile mapping system, is an element progress for development of as-build BIM (Building Information Model) for the maintenance of the building. In this research we proposed a simulation-based target geometry determination for extrinsic calibration of multiple 2D laser scanning mobile system. Four different types of calibration sites were designed: (1) circle type; (2) rectangle type; (3) double circle type; and (4) double rectangle type. Based on the measurement values obtained from each simulated calibration site geometry, least squares solution based extrinsic calibration was derived. As a result, the rectangle type geometry is most suitable for extrinsic calibration of this system. Also, correlation values between extrinsic calibration parameters were high, and calibration results were distinct according to the calibration sites.

The Present Status and Vision of Virtual Construction System Development (가상 건설 시스템 개발 현황과 비전)

  • Kim, Jae-Jun;Choi, Cul-Ho;Shin, Hyun-Mok;Jin, Sang-Yoon;Lee, Kwang-Myung
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.170-175
    • /
    • 2008
  • The research team for the virtual construction development was established with the support of Korea Ministry of Construction and Transportation, and KICTEP (Korea Institute of Construction and Transportation Technology Evaluation and Planning). Its aims are to develop system that is to improve productivity & quality, to create a higher value-added business, and to cultivate international competitiveness in the construction industry. The virtual construction system is a design, engineering, and construction management information system that allows the project participants to effectively share the information throughout the construction life cycle with the support of 3D and design information. To achieve this, the research team focuses on developing several systems. First, the team focuses on developing for the pre-planning, the structural engineering, MEP, and the 3D based estimation system. Second, they focus on developing a simulation system for the construction process planning and feasibility study with help of the virtual reality technologies. Third, they focus on developing the CPLM (Construction Project Life-cycle Management) system for managing construction project data, and the decision support system that makes the collaboration among the project participants based on 3D technologies and information. We also focus on developing the SDAI (Standard Data Access Interface), the localized guideline for 3D design, and a training program. In addition, we focus on developing the undeveloped area of the commercial system and building an environment that can support the communication and collaboration in the construction life-cycle rather than developing the existing and commercialized system.

  • PDF

Intelligent Architectural Design Module for Process Automation of Hanok Constructions (한옥 건축공정 자동화를 위한 지능형 설계모듈의 구현)

  • Ahn, Eun-Young
    • Journal of Korea Multimedia Society
    • /
    • v.15 no.9
    • /
    • pp.1156-1164
    • /
    • 2012
  • Hanok is a cultural heritage containing our ancestor's life style intact and breathing alive with us until now. As Hanok has been concerned as a echo-friendly architecture, a new methodology for efficient construction without damaging the traditional construction process comes into request. The goal of this research is development of a architectural design tool based on the BIM(Building Information Modeling) for satisfying these demands. It will be usable to support whole process of the traditional building from digital design to production and construction. Firstly, we take a consideration of the traditional architecture reflecting the spirit of the age and suggest efficient design method for architectural components. Each components is pre-fabricated as a template representing similar components. All pre-fabricated components are designed by object-oriented concepts so, many variations for a component can be derived from the pre-fabricated component. Our method is helpful for reducing design errors because that it considers combining rule between connecting components in the template design. Moreover it is plugged in the commercial architectural CAD, so it can supports digital design not only traditional architecture but also fusion style mixed with modern architecture.

An Analysis on affecting factors about lowly using 3D CAD by using the AHP (계층분석법을 이용한 3D CAD 활용 저조에 대한 영향 요인 분석 연구)

  • Lee, Sang-Hyo;Kim, Ju-Hyung;Kim, Kyung-Hwan;Lee, Yoon-Sun;Kim, Jae-Jun;Ahn, Byung-Ju
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.6
    • /
    • pp.188-196
    • /
    • 2007
  • Because the construction is becoming bigger and the construction environment is rapidly changing, IT/IS(Information Technology and Information System) of the construction is recently suggested with the alternative proposal. So not only is a study progressed in the area of the BIM(Buidilng Information Modeling), VC(Virtual Construction) and CIC (Computer-Integrated Construction) but also of the information database of the construction for building the information infrastructure of the construction in the domestic construction. Because object-oriented 3D CAD improves the efficiency of a design work and includes the object information which can use with the base of the information database of the construction, it has the high value not only in the design level but also in the construction life cycle. But compared with the effect, the use of 3D CAD is sluggish in the construction. In this study, after surveying about lowly using 3D CAD on the point of AEC (Architect-Engineer-Contract), the result is analyzed with AHP(Analytic Hierarchy Process). So the aim of this study is to offer the base to find the solution of the Affecting factors about lowly using 3D CAD.