• Title/Summary/Keyword: BIM 설계검증

Search Result 71, Processing Time 0.02 seconds

Establishment of Integrated Design Bases Management System of APR1400 Using BIM based Algorithm (BIM기반 Algorithm을 활용한 APR1400 설계기준 통합관리 체계 구축)

  • Shin, Jaeseop;Choi, Jaepil
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.5
    • /
    • pp.52-60
    • /
    • 2019
  • The APR1400 is a 1400MWe nuclear power plant developed through national technology development project over a period about 10years. Approximately 65,000 design drawings are produced for APR1400 construction. In order to maintain consistency among numerous drawings, the highest level of design bases drawings (DBDs) are created according to design bases and this is used in the subsequent design. However, DBDs are produced and managed on a document basis and they are managed various field, it was difficult to accurately reflect the design bases information in the subsequent design. Therefore, this study recognizes limitations of the document based DBDs and develops a system that can accurately reflect the design bases information to subsequent design by adopting BIM based design bases integrated information system. Especially, by introducing DBIL(Design Bases Information Layer) concept, DBIL was created and analyzed based on five design bases(Physical protection, Fire protection, Internal missile protection, Internal flood protection, Radiation protection) applied to APR1400. In the final result DBIL set and Datasheet are integrated of room, design bases information, building data(wall, slab, door, window, penetrations). So it can be used for subsequent design automation and design verification. Furthermore, it is expected that APR1400 DBILs data can be used extensively in constructability and design economics analysis through comparison with next generation nuclear power plant.

A Study on Implementation of 4D and 5D Support Algorithm Using BIM Attribute Information - Focused on Process Simulation and Quantity Calculation - (BIM 속성정보를 활용한 4D, 5D 설계 지원 알고리즘 구현 및 검증에 관한 연구 - 공정시뮬레이션과 물량산출을 중심으로 -)

  • Jeong, Jae-Won;Seo, Ji-Hyo;Park, Hye-Jin;Choo, Seung-Yeon
    • Journal of the Regional Association of Architectural Institute of Korea
    • /
    • v.21 no.4
    • /
    • pp.15-26
    • /
    • 2019
  • In recent years, researchers are increasingly trying to use BIM-based 3D models for BIM nD design such as 4D (3D + Time) and 5D (4D + Cost). However, there are still many problems in efficiently using process management based on the BIM information created at each design stage. Therefore, this study proposes a method to automate 4D and 5D design support in each design stage by using BIM-based Dynamo algorithm. To do this, I implemented an algorithm that can automatically input the process information needed for 4D and 5D by using Revit's Add-in program, Dynamo. In order to support the 4D design, the algorithm was created to enable automatic process simulation by synchronizing process simulation information (Excel file) through the Navisworks program, BIM software. The algorithm was created to automatically enable process simulation. And to support the 5D design, the algorithm was developed to enable automatic extraction of the information needed for mass production from the BIM model by utilizing the dynamo algorithm. Therefore, in order to verify the 4D and 5D design support algorithms, we verified the applicability through consultation with related workers and experts. As a result, it has been demonstrated that it is possible to manage information about process information and to quickly extract information from design and design changes. In addition, BIM data can be used to manage and input the necessary process information in 4D and 5D, which is advantageous for shortening construction time and cost. This study will make it easy to improve design quality and manage design information, and will be the foundation for future building automation research.

A Study on the Evaluation of Environmental Load Based on LCA Using BIM - Focused on the Case of NATM Tunnel - (BIM을 활용한 LCA기반 환경부하평가에 관한 연구 - NATM 터널 사례 중심으로 -)

  • Lee, Yang-Kyoo;Han, Jung-Geun;Kwon, Suk-Hyun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.3
    • /
    • pp.477-485
    • /
    • 2018
  • To control manage environmental load during construction work, it is required to ascertain an accurate quantity for materials those are using during the construction. In construction industrial nowadays, especially on design part, there are lots of mistakes occurred on quantity take-off between plan documents and actual work. That mistakes are caused by omission of design items, overcount because of interference each materials or simple calculate error. Besides, in case of a construction project, engineers are impossible to design perfectly due to a lot of invalid variable in a construction site. Thus, design errors and changes occur frequently in the process of construction work or design due to such unclear elements. And in case of LCA assessment based on 2D design, there is difficult for an engineer who is in charge to calculate the volume of materials manually using drawings and relevant specifications. This study is aimed for examining and verifying a high reliable method of evaluating environmental load which is useful in construction process through comparing LCA analysis. In addition, this study provides the method of calculating the volume of materials and LCA assessment in working on the basis of 2D design, using the specifications which is used for LCA evaluation, and possibility of utilizing the LCA assessment by introducing BIM design technic to improve the former problem through comparing and analyzing the previous method with 3D-based evaluation process.

A Study on the Using of BIM Data and Template for Construction Progress Management (건설공정관리를 위한 BIM데이터와 템플릿 활용 방안)

  • Oh, Kun-Soo;Park, So-Hyun;Song, Jung-Woo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.8
    • /
    • pp.157-163
    • /
    • 2016
  • BIM is currently applied in some domestic construction firms, but it is not being actively utilized due to changes in working environments and qualms about new studies. In order to utilize a BIM model in the design phase, process information is needed during construction, but the input system and utilization method of the process information's state are not complete. Therefore, we propose a BIM template for construction progress management that can show basic BIM information as the construction progresses in an easy and convenient way. This method will facilitate the adoption of BIM and enhance the productivity of construction companies. To this end, we designed a progress explorer for step-by-step progress and work schedules, and we generated three-dimensional views and a progress list by applying unit information (primary units, part units, and detail units) of the work breakdown structure (WBS) to the parameters. To use the BIM template, work progress information is input to the BIM modeling objects through Dynamo. We also used Dynamo for quick and easy calculation of the quantity of materials needed for construction work. To test the BIM template, we applied it to an actual project and evaluated its visibility and a progress list. The results showed that the proposed BIM template facilitates progress management of a project and can thus facilitate the adoption of BIM and improve the productivity of construction companies.

A Study on the Feasibility of COBie to the Wastewater Treatment Plant (COBie 기반 하수처리시설 유지관리시스템 구축)

  • Choi, Jae-Ho;Um, Dong-Yong
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.1
    • /
    • pp.273-283
    • /
    • 2014
  • With the introduction of COBie (Construction Operation Building Exchange) in BIM technology enabling an automatic transfer of design and construction information to operation and management (O&M) phase, the BIM centric O&M management system development process has been tested on the subject of architectural types of building. However, for now, there is a need to investigate the technical feasibility of COBie application to civil structures including industrial facilities. This study takes both "O&M Guideline for Public Wastewater Treatment Plant" and a real wastewater treatment plant into account for the purpose, in which the latter is intended to supplement the result of the first. The findings are three-folds: (1) COBie, as an asset modeling, is not sufficient enough to encompass commissioning data, (2) more relevant IFC development and family library build-up useful to modeling wastewater treatment plant is imperative, and (3) well-planned coordination and organization of COBie data-set in line with O&M practice will enhance the feasibility of the COBie in industrial facilities. The result could be used for a basis study for COBie application, particularly in industrial facilities.

Development of Quantity Take-off Building Information Modeling System for Retaining Wall (객체 기반 물량 산출을 위한 흙막이 BIM 설계 시스템 구축)

  • Kang, SeoungWoo;Kim, Eun-Seok;Lee, Si-Eun;Kim, Chee-Kyeong
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.35 no.4
    • /
    • pp.197-205
    • /
    • 2022
  • In this paper, a retaining wall system, developed using building Information modeling (BIM), is presented. Based on the information from a literature review, elementary technologies for the system were defined and developed. First, for the elementary technology, BIM libraries were constructed using standards and previous study results to achieve versatility and reusability. Second, methods for determining the quantity take-off (QTO) of a retaining wall were reviewed for an earth-work calculating system. Additionally, inverse distance weighting interpolation was used to generate topography. Finally, four formulas for calculating the QTO were proposed and devised for each element. After its development, the BIM system was analyzed and verified through comparison with a two-dimensional drawing-based QTO. The proposed system is deemed to be practical for determining the QTO of retaining walls and earth works. The contributions and limitations of the research are discussed in this paper.

Verification of Reinforcing Arrangement Error in Precast Concrete Shear Walls Using BIM and Presentation of Flexural Ductility Model (BIM을 이용한 프리캐스트 콘크리트 전단벽의 배근 오류 검증 및 휨 연성 모델 제시)

  • Ju-Hyun Mun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.28 no.3
    • /
    • pp.27-36
    • /
    • 2024
  • This study established a BIM procedure considering manufacturing errors in the production process, and evaluated the flexural ductility of precast all-lightweight aggregate concrete special shear walls (PLASWs) with spliced sleeve technique. In the production process, the concrete cover thickness of PALSW was on average 1.28 times greater than the cross-sectional details of the specimen modeled with Revit BIM program. In particular, the bending inner radius of the hoop and inner-cross tie were greater than the designed details. Consequently, the confinement effect of core concrete reduced from 64% to 54% due to the manufacturing errors in the transverse reinforcing bars, resulting in a decrease in the ductility of PALSW by approximately 4.91%. Considering these findings, the BIM of PLASW with spliced sleeve technique should compliment the bending inner radius of the transverse reinforcing bars, and the defined brittleness increase coefficient reflecting the decreased core concrete confining pressure in the stress-strain relationship of confined concrete should be evaluated as 1.8.

A Study on the Automation of the Connection modeling for Steel Structures based on BIM (BIM 기반의 철골접합부 모델링 자동화에 관한 연구)

  • Eom, Jin-Up;Shin, Tae-Song
    • Journal of Korean Society of Steel Construction
    • /
    • v.22 no.1
    • /
    • pp.99-108
    • /
    • 2010
  • This paper presents the results of a study that aimed to develop a module for auto connection modeling that can be applied to the structural details design and modeling phase. It was established that the steel connection library database from the structural analysis resulted from the consideration of the input parameters of the 3D modeling program and the guidelines for Korean standard steel connections. The module for the auto connection modeling in steel structures was developed by linking it with the established library database through the use of the OpenAPI software to prove that the developed module carried out the modeling of the six story (steel structure) office building. The productivity and efficiency of the module introduction was verified by comparing the conventional process and the proposed process.

A Study on the Design of the Slip-Form System for the Construction of Tapered Concrete Pylons (변단면 콘크리트 주탑공사의 슬립폼 시스템 적용을 위한 설계기술 연구)

  • Yoon, Hyejin;Kim, Young Jin;Chin, Won Jong;Kim, Hee Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.3
    • /
    • pp.128-135
    • /
    • 2014
  • This paper studied design of slip form system considering the erection of a pylon mock-up. The height of the pylon is 10 m. A rectangular hollow cross-section was considered. The outer and inner dimensions of the pylons were varied with respect to the height. The thickness of 1 sides among the 4 faces were varied. Accordingly the slip form was designed to respond to continuous changes in its dimensions and thickness. Structural analysis was conducted to examine structural safety of the slip form. Virtual construction by BIM proved its practicality. The developed design technologies were successfully applied to the erection of a 10m high pylon executed for field verification test.

A Study on the Improvement of 3D Slope Modeling for BIM Designing Site Construction (택지조성공사 BIM을 위한 비탈면 3차원 모델링 효율화 방안에 관한 연구)

  • Kwon, Yongkyu;Ha, Dahyun;Kim, Jeonghwan;Seo, Joonwon;Shim, Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.4
    • /
    • pp.29-40
    • /
    • 2021
  • Recently, interest in Building Information Modeling (BIM) has increased globally, and 3D modeling is a start for the application of BIM at construction sites. However, while many studies have been conducted on the efficiency of 3D modeling focused on civil facilities, there is a lack of research on the earthwork BIM. In particular, since 3D slope often has complex shapes depending on the ground models, the efficiency method for 3D slope are needed. This study analyzed the interfaces and procedures of other software to find out what functions users need. Then the functions to enter intervals between 3D faces, select multiple ground models, and improve the interface are reflected on the developed system and is able to efficiently perform modeling with only five steps, and reduce the number of clicks and inputs. As a result of conducting the test to verify the efficiency, using the developed system made skilled users complete modeling at least 1.8 times faster and unskilled people at least 2.4 times faster than using other software. This is expected to perform 3D slope modeling more efficiently, as well as to contribute to the activation of future BIM adoption for housing construction projects.