• Title/Summary/Keyword: BIM설계

Search Result 473, Processing Time 0.022 seconds

A Study on the Ranging of Phased BIM Introduction Into the Architectural Information System (건축행정시스템의 단계적 BIM 도입 범위 설정에 관한 연구)

  • Kim, Yong-Jun;Kim, Hong-Su;Kim, Myoung-Keun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.10
    • /
    • pp.131-138
    • /
    • 2016
  • This study reviewed the status of domestic and foreign Architectural Information Systems and related laws, analyzed the state of the architectural service industry, and proposed the phased introduction of BIM into Architectural Information Systems. The adoption of BIM in Architectural Information Systems both at home and abroad is generally at an unsatisfactory level, with only Singapore assuming a leading role in this area through activities such as the provision of a separate BIM submission service. Since it is desirable for BIM to be applied to additional types of architecture when the architectural licensing procedure is introduced, the different phases of adoption were set after analyzing the scales and types of architecture as defined in related laws. By analyzing the participation rates of architectural design firms in each scale of architecture design, the results demonstrated that, as the number of floors and total floor area in the building increases, the proportion of small scale architectural design firms involved decreases, while that of large-scale architectural design firms increases. The adoption of BIM is occurring mostly within large-scale architectural design firms, which is why it is desirable for its introduction into Architectural Information Systems to be separated into phases from large-scale buildings to increasingly small-scale architecture. In conclusion, this study divided the adoption of BIM in Architectural Information Systems into 6 stages and, following the Architectural administration procedure, established a segmented road map for the gradual activation of BIM.

Risk Management for Environment Protection in Job Site Utilizing BIM Method (BIM을 활용한 현장시공의 친환경 위험관리에 관한 연구)

  • Li, Teng;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.111-114
    • /
    • 2010
  • With the rise of green technology, the environmental question causes people’s attention more and more, based on objective of the sustainable development, the green risk has already begun to appear. In the paper the definition of the green risk of construction project is given, it analyzes and identifies the green risk of construction project from three aspects, based on BIM, the relation with green risk was found. Though the relation, the management of green risk was analyzed and we may take some measures to reduce the unnecessary risk and waste.

  • PDF

BIM Energy Efficiency Plan for Verification of Building Envelop Energy Code of Housing in USA - Based on the NYC Energy Conservation Code - (미국 공동주택의 건물 외피 에너지코드 검증을 위한 BIM 에너지 계획 방안 -뉴욕시 에너지 코드를 기준으로-)

  • Heo, Jinwoo
    • The Journal of the Convergence on Culture Technology
    • /
    • v.8 no.4
    • /
    • pp.313-322
    • /
    • 2022
  • The number of architects who adopt BIM(Building Information Modeling) as the design method are gradually increasing because of its productivity and efficiency. Climate Change and Global Warming lead to legislation of new energy regulations and strengthen existing ones. The current architectural design methods (2D CAD) take a lot of time and effort to verify energy codes and are hard to adjust according to the design changes. The purpose of this study is to show the effectiveness of the BIM in building envelop energy modeling of the housing project. In the process of design method change, We could contribute to increasing productivity and efficiency in building energy verification through BIM because the updated value could be calculated simultaneously without information omission or recalculation process. The procedure for the study is as follows. Using BIM of the Goldin at Essex Crosing Housing Project by Revit 2011 as a case model, this study analyze the criteria for energy plan to conform to the energy code in NYC. The result value from the setting of the Revit model is compared with the reference value required by the NYC Energy Code. Finally, the data from BIM are entered into COMckeck, the energy verification program provided by U.S. Department of Energy, to check whether the building envelope energy performance conforms to NYC Energy Code.

Assessment of BIM-Based Government Funded Projects at the Design Phase (BIM 적용 공공 프로젝트 설계단계의 평가 방안에 관한 연구)

  • Shin, Seung-Hyup;Ham, Nam-Hyuk;Kim, Jea-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.213-216
    • /
    • 2010
  • Nowadays BIM(Building Information System) is applied to the public construction delivery system. BIM can help communications between project applicants through the extraction of the exact and prompt information. It also increases the efficiency of planning, construction, economic feasibility and maintenance in the whole project. Due to increasing demands of BIM, project evaluation and its process on the final deliverables have been in major interests. Thus, through the analysis of the current BIM project, characteristics, types and applications have been researched. We have discussed completeness, relationship and planning of BIM data, which are the standards of evaluation.

  • PDF

A Study on the 'Level of Information' in BIM-based Design Process (BIM 기반 설계프로세스의 단계별 정보 수준에 관한 연구)

  • Koh, In-Lyong;Kim, Myoung-Keun;Min, Young-Gi;Chung, Tae-Seung
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.12 no.3
    • /
    • pp.111-117
    • /
    • 2012
  • The study presents the way to maximize the functionality and the effectiveness of the BIM model, and the type of information used in the overall process of construction projects. If the designing process is the generator of architecture information, then the step-by-step BIM model created in the process is the container for formation and property information. BIM written rules and methods are proposed in order for the architectural BIM model structured in the early stages of designing to go through a process of review and collaboration, and to be seamlessly linked to the basic designing steps. Accordingly, the BIM model construction and operation strategy suggested will substantially reduce the work of designing, structuring, and collaborating, that will be shared and linked.

A Study on Development of Supporting System for Pre-design Phase based on BIM (BIM 기반 건축 기획단계 지원 시스템 개발에 관한 연구)

  • Park, Do-Young;Jun, Yeong-Jin;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2010.04a
    • /
    • pp.85-88
    • /
    • 2010
  • 건축 기획단계는 프로젝트 전반에 걸친 주요한 의사결정이 일어나는 부분으로 그 영향력에 비해 프로젝트 정보를 수집, 처리, 저장하여 관련 참여자가 정보를 재사용하거나 참고하여 새로운 의사결정을 수행하는 것이 미흡하다. 따라서 본 논문에서는 BIM을 활용하여 기획단계에서 발생한 정보들이 설계, 시공, 유지관리 단계에 이르기까지 전생애주기에 걸쳐 정보를 통합 관리할 수 있도록 BIM기반의 건축 기획단계 지원 시스템을 개발하고자한다. 선행연구 분석과 이론적 고찰을 통해 건축 기획단계를 정의하고 건축기획 BIM의 개념과 특징을 도출하였다. 이를 토대로 기획단계 BIM프로세스를 정립하여 BIM을 기반으로 건축 기획단계를 지원하는 프로토타입 시스템 VA-Cityplanner를 개발하였다.

  • PDF

BIM Geometry Cache Structure for Data Streaming with Large Volume (대용량 BIM 형상 데이터 스트리밍을 위한 캐쉬 구조)

  • Kang, Tae-Wook
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.9
    • /
    • pp.1-8
    • /
    • 2017
  • The purpose of this study is to propose a cache structure for processing large-volume building information modeling (BIM) geometry data,whereit is difficult to allocate physical memory. As the number of BIM orders has increased in the public sector, it is becoming more common to visualize and calculate large-volume BIM geometry data. Design and review collaboration can require a lot of time to download large-volume BIM data through the network. If the BIM data exceeds the physical free-memory limit, visualization and geometry computation cannot be possible. In order to utilize large amounts of BIM data on insufficient physical memory or a low-bandwidth network, it is advantageous to cache only the data necessary for BIM geometry rendering and calculation time. Thisstudy proposes acache structure for efficiently rendering and calculating large-volume BIM geometry data where it is difficult to allocate enough physical memory.

A Basic Study on Review the Classification System and the Process of BIM Information for an Automatic Review of Building Code (건축법규 자동검토를 위한 BIM정보의 분류체계 검토 및 프로세스에 관한 기초연구)

  • Lee, Chang-Yoon;Shim, Un-Jun;Ahn, Yong-Sun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.5
    • /
    • pp.45-52
    • /
    • 2012
  • Recently, BIM is used at several areas actively because of introduction of BIM in the construction industry. In particular, the recent many studies on activation of BIM information sharing is underway and it is the future direction of BIM. Moreover, it should be clearly realized. In the BIM levels of domestic construction phase, Interference Review, calculating volume estimates in part based on the active research is underway. However, still interested in reviewing building codes have relatively little interest. As BIM enabled, The methods of reviewing building codes should be transformed into a automated system by using information of BIM. In overseas, they are already using diverse softwares for reviewing modeling. Thus, For an automatic review of building regulations research is needed. this study is research on the development Domestic building codes as an automatic review process by using BIM. In order to Automatic review of the current building regulations by using BIM, this study analyzes the characteristics of each piece of information.