• 제목/요약/키워드: BIM(Building information model)

검색결과 413건 처리시간 0.025초

철도 선형을 고려한 알고리즘 기반의 철도 터널 BIM 설계 방안 (Algorithm-based Railway Tunnel BIM Design Considering Railway Alignment)

  • 최형래;장경수;김혁;이명호;박민상
    • 한국BIM학회 논문집
    • /
    • 제9권1호
    • /
    • pp.1-10
    • /
    • 2019
  • In process of creating BIM model for tunnel, many user use still CAD, so the workflow for BIM design is not perfect. Therefore, in this paper, we proposes a method to automatically create BIM model without converting 2D drawings in tunnel design. It can allow engineers to design BIM-based tunnel with maximum use of linear information and modify the BIM model whenever there is changed linear information. To do this, we use Dynamo, which can reduce the time required for creating and modifying BIM models during design changes, saving time wasted for BIM conversion design.

생애주기비용 예측 기반 건물재료 경제성 평가 및 선정 (Evaluation and Selection of Building Materials based on Life Cycle Cost Prediction)

  • 안정환;임진강;오민호;이재욱
    • 한국BIM학회 논문집
    • /
    • 제5권2호
    • /
    • pp.34-45
    • /
    • 2015
  • As buildings become larger and more complicated, construction costs have increased with a considerable effect on buildings' Life Cycle Cost (LCC). However, there has been little consideration on economic aspects in the selection of construction materials due to limited information on the materials and dependency in architects' experience and inefficiency in cost estimation, causing design changes, increase in maintenance cost, difficulty in budgeting, and decrease in building performance. To solve these problems, this study proposed a BIM-based material selection model which reflects the comprehensive economic efficiency of building materials. Our cost prediction model can estimates the material-related cost during the entire building life cycle. Furthermore, we implemented the proposed model in connection with BIM, which can analyze and compare LCC by material. Through the validation of the model, we could confirm the necessity of LCC-based material selection in comparison with the conventional cost-centered material selection.

BIM Model 기반 철근 수량산출 시 고려사항 (Considerations When Quantity Take-Off of Rebar Based on the BIM Model)

  • 정서희;김주용;김광희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.73-74
    • /
    • 2023
  • The purpose of this study is to derive the cause of the quantity difference and present the considerations when take-off rebar quantity based on BIM model by comparing the quantity of rebar based on BIM model with 2D drawing. This research was limited to take-off the quantity of rebars in the building frame work, and after take-off the quantity of rebars by 3D modeling the 2D drawing of the target building with Revit, the quantity difference was compared with 2D-based software. Therefore, when take-off the quantity of rebars based on the BIM model, instead of take-off the existing 2D-based quantity premium proportion, according to general structural consider development length, lap splice length, covering thickness, reinforcing bars and spacing. In the future, this study is expected to contribute to improving the accuracy of BIM-based frame construction quantity take-off.

  • PDF

A FRAMEWORK FOR SIMULATING CONSTRUCTION PROCESSES FOR OPTIMIZING THE FLOOR CONSTRUCTION CYCLE USING BIM

  • Seung-Jun Ahn;Hyun-Soo Lee;Moonseo Park
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.835-840
    • /
    • 2009
  • Lately, Building Information Modeling (BIM) emerges as the most promising technology, now is expected to bring a great deal of improvement of productivity in every aspect of the construction industry. One of the BIM based scheduling is to use BIM model as a base for applying to schedule analysis and simulation tools. This type of tools may incorporate a various types of information such as the building model, construction method information, resource information, productivity information, rules and constraints to optimize activity sequencing. This paper proposes a framework of BIM based simulating system which can be used to optimize construction processes, especially for the floor construction cycle. For the purpose, all of the necessary components of the system will be defined and represented, and next an algorithm will be introduced to demonstrate the principle of simulating operation. The benefits of this technique are basically two : to test and optimize construction methods in respect of the construction duration and to reduce the floor construction cycle.

  • PDF

건설사업 입찰 텍스트의 BIM 수행 난이도 추론을 위한 딥러닝 모델 (A Deep Learning Model to Predict BIM Execution Difficulty Based on Bidding Texts in Construction Projects)

  • 김정수;문현석;박상미
    • 대한토목학회논문집
    • /
    • 제43권6호
    • /
    • pp.851-863
    • /
    • 2023
  • 일정 규모 이상의 공공 건설 프로젝트에 대한 BIM(Building Information Model) 적용이 의무화됨에 따라 입찰단계에서부터 BIM 요구사항에 대한 관련 절차 및 기술에 대한 폭넓은 이해가 요구되고 있다. 그러나 대부분의 중소 시공 및 엔지니어링 기업은 BIM 수행역량이 낮고 관련 기존 업무 프로세스의 BIM 적용에 대한 이해 높지 않아, 입찰 요구사항에 대한 인지가 어렵고 입찰단계의 합리적인 의사결정이 쉽지 않다. 따라서 본 연구는 BIM 입찰문서 용어를 포함한 형태소 분석기를 딥러닝 모델에 결합하여 입찰문서의 BIM 요구사항의 난이도 판별 방법을 제시한다. 제안된 딥러닝 모델의 매개변수 영향이 조사되었으며 예측 결과의 타당성이 검토되었다. 그 결과, 제안된 모델이 시험 데이터에 대해 F1-score 0.83의 성능을 가지며, 모델의 판별 결과 또한 실제 BIM 수행 난이도를 타당하게 반영하고 있음을 보였다.

BIM 기반 디지털엔지니어링 모델을 활용한 프리팹 교량모델 작성 프로세스 (BIM-based Digital Engineering Modeling Process Proposal for Prefabricated Bridges)

  • 최재웅;김현민;홍사훈
    • 한국BIM학회 논문집
    • /
    • 제13권4호
    • /
    • pp.36-44
    • /
    • 2023
  • Recently in Korea, efforts are underway to enhance smart construction by implementing Building Information Modeling (BIM) comprehensively across all sectors of the construction industry. This study focused on the adoption of BIM for prefab bridges currently executed in the industry and It examined the process of creating a BIM-based prefab bridge model that can support production. Additionally, it explored how prefab products made by manufacturers can be integrated with road alignments using BIM technology and how the DfMA (Design for Manufacturing and Assembly) approach, which supports production based on designed information, can be adopted. The process of creating the prefab bridge model aims to shorten production time, reduce costs, and enhance quality by leveraging digital information related to design and manufacturing within the BIM framework

구조BIM기반 공사비 상세분석 프로세스 구축 (Development of Construction Cost Analysis Process Based on Structural Building Information Modeling)

  • 이승일
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 추계 학술논문 발표대회
    • /
    • pp.237-238
    • /
    • 2012
  • As a way to improve productivity and integrated project delivery in construction industry, BIM(building Information Modeling) using IT technique is being studied and applied recently. S-BIM application Process was established that enable efficient work through Structural BIM detailed Model in consideration of the collaboration among relevant fields. This study has the objective applying S-BIM technique to enable effective Cost Analysis in initial design phase and presenting the method for practical works using Construction Cost Analysis Process based on S-BIM.

  • PDF

BIM 기반 인허가신청 지원 시스템 개발 (Development of BIM-based Building Approval Submission System)

  • 유승은;김가람;김인한;유정호
    • 한국CDE학회논문집
    • /
    • 제20권2호
    • /
    • pp.171-181
    • /
    • 2015
  • Building Information Modeling (BIM) provides many advantages when it is adopted in virtual design construction, to analyze constructability, etc. For this reason, advanced countries have made it mandatory to adopt BIM in public construction projects. The Korea Public Procurement Service announced that from 2016, BIM adoption will be mandatory in every construction project in Korea. Currently, however, it is not possible to fully adopt BIM in the building design process domestically because BIM-based systems have not been used broadly in Korea's building approval system (Seumter). In this research, four challenges were drawn from a focus group interview. Focusing on tackling one challenge, this paper reviewed previous research into building approval systems and the building approval systems of Singapore, the U.K. and the U.S., and identified elements of the building approval application process and presents a system to create and manage the information. The system supports the creation and management of information and 2D drawings from an IFC-based BIM model. We expect that the system will encourage designers to use BIM from the beginning of the design process and ultimately increase the efficiency of design in a BIM-based project.

강구조물 건설에서의 Building Information Modeling(BIM)의 도입 (Application of Building Information Modeling for Steel Structures)

  • 이석주;천진호
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2006년도 정기 학술대회 논문집
    • /
    • pp.192-199
    • /
    • 2006
  • BIM is a collaborative. model-based way to work. Structural BIM is one of the key elements in the building process where the majority of structural information is created. Open BIM interfaces make it possible for all design information to be produced and managed within a single 3D product model. To make structural BIM a reality between owners, general contractors, architects and engineers. the software used need to be open in their communication. We used to Tekla Structures to provide an open environment through standard interfaces and Tekla Open API collaboration. We have developed MCP(machine cutting plan) and PIM(product information management)to provide cutting plan and drawing and manage to B.O.M, Materials, Production, Shipping and Project.

  • PDF

엑스트라도즈드교의 BIM 구축 및 파라메트릭 모델링 (Parametric Modeling and Design of Building Information Model for Extradosed Bridge)

  • 박연수;이병근
    • 한국전산구조공학회논문집
    • /
    • 제25권1호
    • /
    • pp.9-18
    • /
    • 2012
  • 정보 모델링이라 일컫는 BIM은 단순히 이미지를 표현할 뿐만 아니라 교량의 전 생애주기에 발생하는 정보를 저장하는 도구로 활용된다. 최근 발주부터 유지관리까지 교량의 전 생애주기 동안에 BIM을 활용하여 건설 생산성을 향상시키려는 시도가 증가하고 있다. 현재 BIM에 대한 이점은 어느 정도 인지하고 있는 상태이지만, BIM구축 및 활용에 대한 정보가 부족한 상태에서 도입하면 오히려 이익보다는 추가적인 업무발생에 의한 손실을 일으키게 되므로 아직까지는 조심스러운 단계이다. 따라서 본 연구에서는 교량에 관한 BIM을 실제로 작성하여 토목분야의 객체를 모델링할 수 있는지를 평가하고 BIM을 적절하게 활용하기 위한 개선점 및 향후 활용방안에 대해 고찰하고자 한다. 연구결과 BIM은 도면과 물량산정에 있어서 일관성, 효율성, 정확성에 기여할 수 있었고 파라메트릭 모델을 활용한 치수 설정으로 모델의 재활용이 가능한 것으로 나타났다. 도입 초기에는 모델작성에 따른 노력이 소모되지만 그 이후에는 작성된 모델을 활용하므로 생산성을 증가시키는데 도움이 될 것으로 판단된다.