• Title/Summary/Keyword: BIM(Building information Modeling)

Search Result 800, Processing Time 0.023 seconds

Difference Factors Analysis of between Quantity Take-off Using BIM Model and Using 2D Drawings in Reinforced Concrete Building Frame (건물 골조수량 산출 시 BIM모델 기반 수량과 2D도면 기반 수량 차이 요인 분석)

  • Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.5
    • /
    • pp.651-662
    • /
    • 2023
  • Recently, research on the use of Building Information Modeling(BIM) for various construction management activities is being actively conducted, and interest in 3D model-based estimation is increasing because it has the advantage of being able to be automatically performed using the attribute information of the 3D model. Therefore, this study aimed that the difference in the quantities is calculated the quantity based on the 2D drawing of a building and is extracted from the 3D model created by the Revit software was compared and tried to find out the cause. The difference in the quantity calculated by the two methods was the largest in the formwork, followed by the smallest in the order of the quantity of rebar and concrete. The reason for this difference is that there is a part where the quantity extraction in the 3D model is not suitable for the quantity calculation standard, and in particular, in the case of formwork, it was difficult to separate only the quantity of the necessary part. In addition, since the quantity of rebar was not separated by member, it was impossible to accurately compare the quantity and identify the cause of the difference. Therefore, it is considered to be the most reasonable to use application software that imports only the numerical information necessary for quantity calculation from the 3D model and applies a separate calculation formula.

BIM Based Time-series Cost Model for Building Projects: Focusing on Construction Material Prices (BIM 기반의 설계단계 원가예측 시계열모델 -자재가격을 중심으로-)

  • Hwang, Sung-Joo;Park, Moon-Seo;Lee, Hyun-Soo;Kim, Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.2
    • /
    • pp.111-120
    • /
    • 2011
  • High-rise buildings have recently increased over the residential, commercial and office facilities, thus an understanding of construction cost for high-rise building projects has been a fundamental issue due to enormous construction cost as well as unpredictable market conditions and fluctuations in the rate of inflation by long-term construction periods of high-rise projects. Especially, recent violent fluctuations of construction material prices add to problems in construction cost forecasting. This research, therefore, develops a time-series model with the Box-Jenkins methodologies and material prices time-series data in Korea in order to forecast future trends of unit prices of required materials. BIM (Building Information Modeling) approaches are also used to analyze injection time of construction resources and to conduct quantity takeoff so that total material price can be forecasted. Comparative analysis of Predictability of tentative ARIMA (Autoregressive Integrated Moving Average) models was conducted to determine optimal time-series model for forecasting future price trends. Proposed BIM based time series forecasting model can help to deal with sudden changes in economic conditions by estimating future material prices.

An Object Quality Verification Method for BIM Libraries based on Standardized Drawings in Civil Projects -Focusing on Retaining Wall Case (토목 표준도 기반의 BIM 라이브러리에 대한 객체 품질 검증 방법 연구-옹벽사례를 중심으로)

  • Moon, Hyoun-Seok;Kim, Chang-Yoon;Cho, Geun-Ha;Ju, Ki-Beom
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.4
    • /
    • pp.129-137
    • /
    • 2016
  • BIM libraries for architectural projects have been developed and distributed. However, they do not define physical and logical quality control methods for individual library objects, so there are some difficulties in securing reliability of 3D library models converted from 2D drawings. Because the BIM library contents can be built by participating material and member-fabrication companies, after making individual BIM library objects, a certification process through separate quality verification is very important when delivering as-built BIM libraries. Since the BIM library should have generality for usage, it is necessary to secure the quality of BIM library objects according to consistent verification standards. Therefore, this study suggests a quality verification method for certifying a BIM library object from physical and data perspectives by comparing existing 2D drawings in the BIM libraries built based on standardized 2D drawings from MOLIT. This method could be widely used for quality verification in delivering BIM libraries by companies in the construction sector and operated with rule set data for quality verification of as-built BIM models.

Accuracy Comparison Between Image-based 3D Reconstruction Technique and Terrestrial LiDAR for As-built BIM of Outdoor Structures

  • Lee, Jisang;Hong, Seunghwan;Cho, Hanjin;Park, Ilsuk;Cho, Hyoungsig;Sohn, Hong-Gyoo
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.33 no.6
    • /
    • pp.557-567
    • /
    • 2015
  • With the increasing demands of 3D spatial information in urban environment, the importance of point clouds generation techniques have been increased. In particular, for as-built BIM, the point clouds with the high accuracy and density is required to describe the detail information of building components. Since the terrestrial LiDAR has high performance in terms of accuracy and point density, it has been widely used for as-built 3D modelling. However, the high cost of devices is obstacle for general uses, and the image-based 3D reconstruction technique is being a new attraction as an alternative solution. This paper compares the image-based 3D reconstruction technique and the terrestrial LiDAR in point of establishing the as-built BIM of outdoor structures. The point clouds generated from the image-based 3D reconstruction technique could roughly present the 3D shape of a building, but could not precisely express detail information, such as windows, doors and a roof of building. There were 13.2~28.9 cm of RMSE between the terrestrial LiDAR scanning data and the point clouds, which generated from smartphone and DSLR camera images. In conclusion, the results demonstrate that the image-based 3D reconstruction can be used in drawing building footprint and wireframe, and the terrestrial LiDAR is suitable for detail 3D outdoor modeling.

Empirical Evaluation of BIM Coordinator Performance using Queuing Model in Construction Phase (대기행렬 모형을 활용한 시공단계 BIM 코디네이터 업무 성과 분석)

  • Ham, Nam-Hyuk;Yuh, Ok-Kyung;Ji, Kyu-Hyun
    • Journal of KIBIM
    • /
    • v.8 no.3
    • /
    • pp.31-42
    • /
    • 2018
  • This study focuses on the BIM request for information(RFI) processing performance and quantitatively analyzes the performance of the BIM coordinator and the loss due to the waiting of the project participants. For these purposes, a method to quantitatively evaluate the performance of the BIM coordinator was proposed using a queueing model. For the verification, two projects in which BIM was applied in the construction phase were selected, and the BIM RFI data were collected through the analysis of the BIM monthly report and BIM coordinator work log of each project. In addition, the BIM input personnel, labor cost, and productivity data were collected through interviews with the experts of the case projects. The analysis of the BIM RFI processing performance of the BIM coordinator using the queueing model exhibited on a probabilistic basis that the waiting status of the project participants could vary depending on the preliminary BIM application to the design verification as well as the input number and level of the BIM coordinator personnel. In addition, the loss cost due to the waiting of the project participants was analyzed using the number of BIM RFIs waiting to be processed in the queueing system. Finally, the economic feasibility analysis for the optimal BIM coordinator input was performed considering the loss cost. The results of this study can be used to make decisions about the optimal BIM coordinator input and can provide grounds for the BIM return on investment (ROI) analysis considering the waiting cost of the project participants.

Deduction of R-PLM technology development consideration (R-PLM 기술 개발 시 고려사항 도출에 관한 연구)

  • Kang, Tae-Wook
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.7
    • /
    • pp.4618-4625
    • /
    • 2014
  • The aim of this study was to develop a R-PLM (Railway BIM-based Product Lifecycle Management) technology. The railway engineering productivity can be maximized if the railway product is created using the object modeling method and the railway lifecycle process is managed effectively. Recently, technology known as BIM and PLM was applied to the construction industry to improve the productivity. To define the R-PLM functions, the expert interview and a practitioner interview were conducted to identify the expected outcome and obstacles to R-PLM technology. As a result, the differences between the occupation and the priority of those were derived. Finally, R-PLM technology development consideration was suggested based on the interview results.

A Study of Passive Magnetic Device based on BIM for the Vibration Conrol of Structures (BIM기반의 구조물 진동제어를 위한 Passive Magnetic Device 개발에 관한 연구)

  • Koo, Sun-Mo;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.6 no.3
    • /
    • pp.42-48
    • /
    • 2016
  • Structural members are designed to maintain the load-carrying capacity as well as structural strength, and the structural serviceability such as the deflection, cracks, and vibration to give the occupants uncomfortable environment should be checked. Recently, the importance of the vibration has been issued since the Techno Mart accident due to vibration resonance. This study provides a passive vibration control system using the repulsion force of magnets to reduce dynamic vibrations. The systems is devised by importing the constraint condition by a hinge to operate magnets installed at two adjacent locations. The effectiveness of the proposed system is investigated by the vibration control test of a steel beam with and without the control system. It is illustrated in the test that the system is activated by the control forces executed by the magnets and can be utilized in reducing the dynamic responses. The system can be applied to pedestrian bridge and traffic bridge. The applicability is expected in the future by optimizing the factors to affect the dynamic responses like the intensity, mass, locations of magnets.

Algorithm of Level-3 Digital Model Generation for Cable-stayed Bridges and its Applications (Level-3 사장교 디지털 모델 생성을 위한 알고리즘 및 활용)

  • Roh, Gi-Tae;Dang, Ngoc Son;Shim, Chang-Su
    • Journal of KIBIM
    • /
    • v.9 no.4
    • /
    • pp.41-50
    • /
    • 2019
  • Digital models for a cable-stayed bridge are defined considering data-driven engineering from design to construction. Algorithms for digital object generation of each component of the cable-stayed bridge were developed. Using these algorithms, Level-3 BIM practices can be realized from design stages. Based on previous practices, digital object library can be accumulated. Basic digital models are modified according to given design conditions by a designer. Once design models are planned, various applications using the models are linked the models such as estimation, drawings and mechanical properties. Federated bridge models are delivered to construction stages. In construction stage, the models can be efficiently revised according to the changed situations during construction phases. In this paper, measured coordinates are imported to the model generation algorithms and revised models are obtained. Augmented reality devices and their applications are proposed. AR simulations in construction site and in office condition are tested. From this pilot test of digital models, it can be said that Level-3 BIM practices can be realized by using in-house modeling algorithms according to different purposes.

A Study on Development of the Spatial Network Analysis Tool based on Open BIM Technologies (개방형 BIM 기반 공간네트워크 분석도구 개발에 관한 연구)

  • Park, Young-Sup
    • Korean Journal of Computational Design and Engineering
    • /
    • v.17 no.1
    • /
    • pp.7-16
    • /
    • 2012
  • One distinguishing feature of BIM(Building Information Modeling) is the objectification of spatial elements independently, which makes it easy to represent spatial network. From this perspective, this study aimed to develop the spatial network analysis tool based on open BIM technologies. From the literature review, an object model of spatial network with nodes and links and a process model from construction to visualization were established. A prototype system implementing the proposed models, named SNAT(Spatial Network Analysis Tool), was developed in Java platform with using its open source packages. SNAT can create a spatial network from IFC-BIM model, calculate the indices of spatial network analysis, and visualize it with the representing types(map, graph, matrix and table).

Case Study of BIM Guideline on Other Countries (해외의 BIM 가이드라인 사례연구)

  • Kim, Khil-Chae
    • Korean Architects
    • /
    • s.487
    • /
    • pp.63-68
    • /
    • 2009
  • 건축시장에서도 지식정보화로 등장한 BIMtleofmf 맞이하게 되었다. BIM(Building Information Modeling)은 전통적인 건축의 2D해석방법을 보다 실물 그대로의 형태로 가상의 디지털 공간에 구현하는 방법이다. 이는 건축시장 전반에 일대 지각변동이 야기될 전망이다. 건축사사무소의 경우 설계 프로세스의 변화, 디자인팀 구성의 변화, 저작권과 관련된 계약의 변화, 건축사의 역할의 변화 등 많은 변화가 대기하고 있는 실정이다. 최근에는 우리 건축시장에도 BIM으로 발주되기 시작하고 있다. 이에 대한 준비가 없이는 많은 혼란과 대가를 치러야 되는 상황으로 몰리고 있는 안타까운 실정이다. 건축은 건축이라는 큰 주제를 가지는 여러 전문집단이 함께 협업(collaboration)하여 이루어 가는 행위들로 볼 수 있다. 여러 관계자간의 상호 밀접한 협업과 분명한 역할 분담이 요구된다. 따라서 이에 대한 대비를 해나가야 한다. 이에 대한 방법으로 국외의 BIM 가이드라인을 조사 분석하고 장단점을 파악하여 국내 건축시장의 전통적이며 지역적 특성을 반영하는 국내 BIM 가이드라인을 만드는 과정에서 조사된 주요 해외 사례를 살펴보고자 한다. 이를 통하여 건축사 여러분들과 함께 고민하고 준비하는 기회를 지면을 통하여 갖고자 한다. 많은 관심과 성원을 기대하며${\cdots}$.

  • PDF