A Study on Proto-type Development of BIM based Stochastic Duration Estimation Module (BIM기반 추계학적 공기 예측 모듈 프로토 타입 개발에 관한 연구)

  • Park, Jae-Hyun;Yun, Seok-Heon;Paek, Joon-Hong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.159-162
    • /
    • 2009
  • Today's construction is more various and more complex. Because of that, a lot of uncertain factors are occurred and they related uncertain construction duration. For management complex architecture project, importance of construction schedule management also increased. In previous studies, one of solutions to overcome those problems is suggested. It was BIM based construction simulation process which focused on construction schedule and construction schedule management. But latest process had limited point which has no duration estimation function. So this paper suggested duration estimation method and developed duration estimation module. Duration estimation module developed with current scheduling tool MS Project and their macro function. However, this module has just developed Reinforced Concrete Structure and has to do more development and research.

  • PDF

A Basic Study of Automatic Estimation Algorithm on the Rebar Length of Beam by Using BIM-Based Shape Codes Built in Revit (BIM 기반 형상코드를 이용한 보 철근길이 자동 산장 기초 연구)

  • Widjaja, Daniel Darma;Kim, Sunkuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.167-168
    • /
    • 2023
  • Construction of reinforced concrete structures required massive amounts of concrete and steel rebar. The current procedure to estimate the quantity of rebar requires tedious and time-consuming manual labor. Consequently, this circumstance made the engineers vulnerable to error and mistake, which led to the rebar waste. No system that is capable of automatically calculating rebar length has yet been developed Thus, this study proposes a preliminary investigation of automatic rebar length estimation of beam element by using BIM-based shape codes drawn in Revit. Beam is chosen due to its complexity in the rebar arrangement. In addition, the development of this study could assist engineers on the construction site and effectively contribute to the minimization of rebar waste in the future.

  • PDF

A Study on the Enablers and Barriers of BIM-based Assembling Collaboration for Designers' Communication and Socio-Psychological Mechanisms (BIM기반의 어셈블링 협업이 설계자 간의 의사교환과 사회심리학적 기제에 미치는 효과와 한계에 관한 연구)

  • Hong, Seung-Wan;Jeong, Yongwook
    • Journal of KIBIM
    • /
    • v.7 no.1
    • /
    • pp.36-44
    • /
    • 2017
  • While previous studies argue that BIM-based assembling collaboration promotes the communication and process management among participants in architectural design projects, it is still unknown which communication and socio-psychological factors are more and less activated in use of BIM-based collaboration. To investigate this research aim, in authentic BIM-used architectural retrofitting projects, the participants (N=36) collaborated and assessed the communication factors on (1) perceiving design results, (2)understanding partners'design intention, (3) proposing and converging opinions, the interpersonal design process management factors on (1) managing design process, (2) managing collaboration schedule, and the complementedness factors on (1) understanding partners' expertise, and comradeship. Statistical analyses reveal that the factor relevant to perceiving design results is better activated than the other factors (p<0.05), but all other factors are not much activated compared to perceiving design results. Deduced from the previous BIM studies and interviews, a reason roots in the shared forms and semantics of BIM. The shared semantics represent collaborators' information and allow the participants to perceive design changes explicitly. Meanwhile, BIM-based assembling collaboration is limited to represent observable, experience-able processes of design, and thus, several key socio-psychological factors, such as proposing and converging opinions and managing design process, are less activated.

BIM-based Design Automation Tool and Digital Twin Interoperability - Case of the Next Generation Noise Barrier Tunnel - (BIM 기반 설계 자동화 도구와 디지털 트윈의 상호운용성 - 차세대 방음터널의 사례를 중심으로 -)

  • Yang, Seung-Won;Kim, Seong-Jun;Kim, Sung-Ah
    • Journal of KIBIM
    • /
    • v.11 no.4
    • /
    • pp.31-41
    • /
    • 2021
  • Digital twins between "BIM Digital Model-Physical Prototype Model" will be built for Noise Barrier tunnel(NBT) that meet the definition of N.G smart city facilities derived from previous studies to build a data flow that connects data at each stage of design, construction, and operation. In this process, BIM design automation tools are created and utilized, and consistent transmission of member and attribute data is performed by converting them into IFC format. Through this, the purpose is to improve the labor-intensive environment required from the design stage of the NBT and to consistently maintain the information required for subsequent production and construction. This includes achieving changes in the construction industry based on digital transformation by unifying various data formats used differently for each industry from design to operation. In addition, it demonstrates that information exchange in the maintenance and management stages is possible based on the data exchange of the established digital twin and aims to improve the existing labor-intensive environment and expand operability between digital and physical information. As suggested in previous studies, the implementation of digital twins in these N.G smart city facilities includes the possibility of building an environment that adds to the possibility of high value-added product platforms as well as the function of big data platforms targeting existing smart cities.

Concept and Structure of Parametric Object Breakdown Structure (OBS) for Practical BIM (BIM 객체분류체계 (OBS) 개념 및 구조)

  • Jung, Youngsoo;Kim, Yesol;Kim, Min;Ju, Taehwan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.88-96
    • /
    • 2013
  • Recent proliferation of building information modeling (BIM) has actively stimulated integrated utilization of geometric (graphic) and non-geometric (non-graphic) data. Nevertheless, physically and logically, linking and maintaining these two different types of data in an integrated manner requires enormous overhead efforts for practical implementation. In order to address this problem, this paper proposes a concept and structure of the object breakdown structure (OBS) that facilitates advanced BIM implementations in an automated and effective manner. Proposed OBS numbering system has secure rules for organizing graphic objects in full considerations of effectively integrating with non-geometric data (e.g. cost and schedule). It also removes repetitive linking process caused by design changes or modifications. The result of applying this concept to a housing project revealed that only 120 definitions controled over 6,000 graphic objects for full integration with cost and schedule functions.

Development of Augmented Reality Tool for Architectural Design (건축설계 검증을 위한 증강현실 설계지원도구 개발)

  • Ryu, Jae-Ho
    • Journal of the Korea Society of Computer and Information
    • /
    • v.20 no.1
    • /
    • pp.49-62
    • /
    • 2015
  • In this study we have proposed the prototype of design support device for architectural design assessment using the building information modeling(BIM) data and the augmented reality(AR) technology. The proposed system consists of novel hardware composition with the transparent display, the mock-up model and the digital architectural model in the new shape of frame. The removal of background and the correction of viewer point in the capture video are proposed in order to use the transparent display in AR application. The BIM data formats are reviewed to be converted for using in AR application. Also the proposed system can be expanded to multi-user collaboration system from two user system through the suggested hardware and software compositions. The results of this study will be applied to use the mock-up model and digital architectural model in order to carry out the design assessment process efficiently and economically in the architectural design field.

A Study on the Effects of BIM Adoption and Methods of Implementationin Landscape Architecture through an Analysis of Overseas Cases (해외사례 분석을 통한 조경분야에서의 BIM 도입효과 및 실행방법에 관한 연구)

  • Kim, Bok-Young;Son, Yong-Hoon
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.45 no.1
    • /
    • pp.52-62
    • /
    • 2017
  • Overseas landscape practices have already benefited from the awareness of BIM while landscape-related organizations are encouraging its use and the number of landscape projects using BIM is increasing. However, since BIM has not yet been introduced in the domestic field, this study investigated and analyzed overseas landscape projects and discussed the positive effects and implementation of BIM. For this purpose, landscape projects were selected to show three effects of BIM: improvement of design work efficiency, building of a platform for cooperation, and performance of topography design. These three projects were analyzed across four aspects of implementation methods: landscape information, 3D modeling, interoperability, and visualization uses of BIM. First, in terms of landscape information, a variety of building information was constructed in the form of 3D libraries or 2D CAD format from detailed landscape elements to infrastructure. Second, for 3D modeling, a landscape space including simple terrain and trees was modeled with Revit while elaborate and complex terrain was modeled with Maya, a professional 3D modeling tool. One integrated model was produced by periodically exchanging, reviewing, and finally combining each model from interdisciplinary fields. Third, interoperability of data from different fields was achieved through the unification of file formats, conversion of differing formats, or compliance with information standards. Lastly, visualized 3D models helped coordination among project partners, approval of design, and promotion through public media. Reviewing of the case studies shows that BIM functions as a process to improve work efficiency and interdisciplinary collaboration, rather than simply as a design tool. It has also verified that landscape architects could play an important role in integrated projects using BIM. Just as the introduction of BIM into the architecture, engineering and construction industries saw great benefits and opportunities, BIM should also be introduced to landscape architecture.

Workflow Procedures and Applications in BIM-based Design for Safety (DfS) (BIM 기반 설계안전성검토의 업무 절차와 활용 방안에 관한 연구)

  • Jaewoong Hwang;Heetaek Yoon;Junhyun Bae;Youngkon Park
    • Land and Housing Review
    • /
    • v.15 no.2
    • /
    • pp.125-137
    • /
    • 2024
  • A conventional Design for Safety (DfS), introduced to eliminate potential hazards in the design phase proactively, has encountered persistent challenges, such as perfunctory risk assessments and hazard identifications based on 2D drawings and inefficient workflow processes. This study proposes a BIM-based approach to Design for Safety (DfS) to address the limitations of conventional methods, aiming to enhance efficiency and achieve practical safety management benefits. The proposed workflow process for BIM-based DfS has been refined and validated for on-site applicability through various case studies, including risk assessments during the design phase and field applications for safety management activities during the construction phase. Specifically, the critical process of risk assessment within the DfS methodology has also been transitioned to a BIM-based approach. This BIM-based risk assessment process has been evaluated through case studies, encompassing safety reviews for structural design, construction equipment operation, and construction methodology with sequence in design projects. Additionally, the proposed BIM-based DfS has demonstrated exceptional on-site applicability and efficiency, as validated by the application of a BIM deliverable embedded in DfS information for CDE-based daily activity briefing, VR-based safety training, AR-based mitigation measures inspections, and other safety management activities in the construction phase.

A Case Study of Status and Characteristics of the BIM Standard in China (중국 BIM 표준의 현황과 특성에 관한 사례 분석)

  • Shin, Kyoo-Chul
    • Journal of KIBIM
    • /
    • v.8 no.3
    • /
    • pp.20-30
    • /
    • 2018
  • The Standard for BIM in Construction of China was released in 2017. The Unified Standard for BIM of China also took effects on 2017. The BIM standards of China needs to be compared with those related guidelines of Korea to find the status and characteristics for future development of BIM application in both countries' construction industries. The research methodology is a case study of comparing various standards of both countries. The case study results reveals many interesting issues for future BIM application and guidelines for practice of design and construction process. The research foundings include followings : LOD (Level of development) are well defined including LOD 350 in Chinese Standard. P-BIM(Practice based BIM) concepts and series of standards are set for the well-defined design and construction process by work stage in China. Korean standards shows more processes of design and documentation in detail. Major three aspects, particularity in BIM standard by work trade, practicality in BIM work process of design and construction, and professionality in subjects of BIM application, are analyzed and compared with various Guidelines of BIM in both countries.

BIM-based Design Verification Performance Analysis with Priority Rules Applied (우선순위 규칙을 적용한 BIM 기반 설계검증 성과 분석)

  • Huh, Seung-Ha;Shim, Jae-Hyeong;Ham, Nam-Hyuk;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.11 no.3
    • /
    • pp.1-11
    • /
    • 2021
  • BIM is one of the means of reducing the economic loss caused by design errors. These features of BIM have led to increased use of BIM. With the increasing use of BIM, several studies have been conducted to analyze the performance of BIM. As the importance of BIM staff is emphasized in the performance analysis of BIM, the human resource allocation of BIM staff can become an important research issue. However, there are few studies to measure the workforce effectiveness of BIM staff. Ham et al (2020) measured BIM workforce efficiency using FCFS queue model rules. Since design errors can have different effects on the project depending on the type, there are design errors that must be dealt with first. Therefore, in this study, a priority queue was used to solve design errors with high priority first. The performance of BIM-based design verification was analyzed by quantitatively analyzing the performance of BIM staff when the priority rule was applied to the design error processing sequence.