• Title/Summary/Keyword: BIM(Building information Modeling)

Search Result 800, Processing Time 0.032 seconds

Prioritizing SOC Facilities for Applying BIM/GIS Integrating Platform to Local Governments (지방자치단체에 BIM/GIS 통합 플랫폼 적용을 위한 SOC 시설물 우선순위 선정방안)

  • Youn, Jun Hee;Lee, Woo Sik;Choi, Hyun Sang;Kang, Tae Wook
    • Spatial Information Research
    • /
    • v.21 no.5
    • /
    • pp.7-14
    • /
    • 2013
  • Recently, BIM(Building Information Model) is widely applied to all stages of SOC (Social Overhead Capital)facilities life cycle from planning to maintenance. While BIM is an analysis tool focussing the inner space of facilities, GIS is principally applied to analyzing relationship between facilities. Therefore, integrating BIM and GIS, we expect to get a potential synergy effect in aspects of effective information management and various analysis for SOC facilities. This paper deals with prioritizing SOC facilities for applying BIM/GIS integrating platform to local governments. First, investigate facilities required by law, and identify SOC facilities suitable for SOC characteristics. Second, analyze the effectiveness and applicability of BIM/GIS integrating platform applying each facility. For the purpose, we quantify effectiveness and applicability in aspects of UIS management and GIS functions. Lastly, prioritize the SOC facilities applying BIM/GIS integrating platform.

Development Method of Open BIM Data for Facility Space Management (시설물 공간관리를 위한 개방형 BIM 데이터 구축 방안)

  • Cho, Geun-Ha;Ju, Ki-Beom
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2015.07a
    • /
    • pp.321-322
    • /
    • 2015
  • 본 연구는 BIM의 최종 모델(As-built Model)이 BIM기반 유지관리 시스템(Facility Management System)에 활용되는 것을 전제로 하며 유지관리 분야 중 공간관리 분야에서 활용되는 BIM 모델을 구축하기 위한 방안을 제시한다. 연구의 최종 결과물인 BIM 유지관리 가이드라인은 향후 BIM 발주 지침에 반영되어 건설과정에서 구축된 BIM 정보를 유지관리 단계까지 지속적으로 활용하도록 유도할 것이라 기대한다.

  • PDF

Basic Study about BIM Introduction by Awareness Change Analysis in Civil Engineering (엔지니어링업체 인지도 변화분석을 통한 토목분야 BIM 도입 기초연구)

  • Seo, Myoung-Bae;Song, Jong-Kwan;Yang, Sung-Hoon
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2012.11a
    • /
    • pp.1207-1208
    • /
    • 2012
  • 최근 건설분야에 화두가 되고 있는 건축정보모델링(BIM, Building Information Modeling)은 건설산업의 패러다임 전환을 통한 새로운 성장동력의 미래로 부각되고 있으며, 건축분야는 서울시, 용인시, LH공사 등 BIM을 활용한 공공 발주사례가 확산되는 추세다. 토목분야는 건축보다 기간이 길고 비용이 크며 이해당사자가 너무 다양해서 발생하는 정보의 양이 방대할 뿐만 아니라 활용분야를 다양화하지 못하고 이를 뒷받침해주는 제도나 지침의 부재 등으로 인해 건축분야보다 BIM도입이 늦어지고 있다. 이에 토목분야에서 활용할 수 있는 3차원 형상정보와 관련된 정보모델표준, 지침, 가이드를 개발하기 위해 BIM 적용시 가장 효과가 크고 도입의지가 강한 엔지니어링사의 BIM에 대한 인지도 분석을 통해 토목분야 BIM 도입을 위한 기초자료로 활용하고자 한다.

A Study on the Establishment of Design and Construction Process Standardization through Building BIM Application Case (건축물 BIM 적용사례를 통한 설계 및 시공프로세스 표준화 수립에 대한 연구)

  • Jeong, Hee-woong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.4
    • /
    • pp.347-358
    • /
    • 2022
  • In order to satisfy the extraction and use of information such as estimates and processes required in the design and construction stages of BIM, which is an expectation of overall construction operation for the design and construction stage of domestic buildings, it is insufficient to supply and apply mobile technologies or terminals. In this paper, standardization of BIM-based processes from the design stage to the construction stage is proposed as an efficient construction system method through mobile-based simulation and test-bed case analysis review. The current status and potential of BIM application were identified through theoretical review of BIM and case studies at home and abroad. In addition, the overall flow of the project and the direction of effective process construction were investigated through each process by 3D, 4D, and 5D execution stage and the role of each collaborator. 4D building process BIM simulation system using mobile was implemented by applying a visualization engine that simulates process information, object information connection module, and related object information. Therefore, it was possible to minimize the possibility of re-construction of the BIM design and construction process model through the visualization of 2D drawings based on the 3D model of the building and the review of errors and interferences in the drawings. In addition, in the implementation of simulation for each process of the construction process through mobile devices, it was possible to support construction progress and process management according to the optimal option selected by the user.

A Method of Tunnel Information Modeling Reflecting Curved Alignment and Model-based Information Management using IFC Data Schema (곡선 선형을 반영한 터널 정보모델링 및 IFC 데이터 스키마를 활용한 모델기반의 정보관리 방안)

  • Jang, Seong Geun;Kwon, Tae Ho;Park, Sang I.;Lee, Sang-Ho
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.30 no.6
    • /
    • pp.549-557
    • /
    • 2017
  • In order to improve the productivity in the civil engineering field, efforts to apply BIM have been continuing, however, research on information modeling of tunnel structures considering alignment is insufficient. In this study, we proposed the method of building tunnel models reflecting curved alignment by transferring point data to BIM Authoring Tools(BAT) through discretization of alignment in Alignment-centered Modeling Tools(AMT). IFC data schema was derived to consider the physical and spatial elements of tunnel structures and alignment and IFC-based information management for tunnel alignment, tunnel structures and ground conditions was possible by referring to the extended data schema and including meanings in IFC property sets. The ratings for ground condition in Rock Mass Rating(RMR) and Q-system was automatically derived by using generated information model according to the proposed method.

Study on the Application of 3D-based BIM for School Facilities to Increase Cost Management Efficiency (교육시설물 공사비 관리 효율화를 위한 BIM 적용방안에 관한 연구)

  • Kwon, O-Bin;Son, Jae-Ho;Lee, Seung-Hyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.6
    • /
    • pp.49-60
    • /
    • 2010
  • Cost Estimating allows each entity in a construction project to plan, distribute, and control its required construction cost for the project. However, existing 2D design based estimating has problems, such as inaccuracy and inefficiency caused by missing, duplicated, or erroneous calculations. In this situation, current estimations for school facilities have more difficulties in forecasting construction costs due to an inadequate work breakdown structure for BOQ (Bill of Quantity) and insufficient guidelines for Basis of Estimate. In this study, therefore, an effort was made to increase the efficiency of estimating for school facilities by applying a 3D modeling based BIM tool to quantity and cost estimates. In addition, this study suggested a reasonable work breakdown structure for BOQ that was appropriate when 3D modeling was applied, and verified it through a case study. The authors tried to provide a BIM-based estimating method for school facilities to obtain greater accuracy and efficiency by having more information in an earlier stage.

Analysis of the Relationship Between Project Goal and Model Use Through BIM RFI Analysis at the Construction Site (시공 현장의 BIM 정보 요청 사항을 통해 분석한 프로젝트 목표와 BIM 활용 간의 관계)

  • Lee, Seung-Won;Eum, Ik-Chul;Ham, Nam-Hyuk;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.14 no.1
    • /
    • pp.22-29
    • /
    • 2024
  • BIM is a practical and economical technology used in the construction process. Despite the fact that BIM is widely used in the design and another stage before construction, it is not largely applied during the construction stage itself. However, it is important to opt for BIM during construction stage because there may occur a number of risks such as construction delay and increased construction costs. Therefore, the present paper contains the analysis of the model use, which is mainly applied to respond to the BMI RFI that represents an information requirement of construction site workers, by analysing the BMI RFI application at the construction site. In addition, there is an analysis of the way the derived model use affects the project goal aimed at the project success.

Collaborative Process to Facilitate BIM-based Clash Detection Tasks for Enhancing Constructability

  • Seo, Jung-Ho;Lee, Baek-Rae;Kim, Ju-Hyung;Kim, Jae-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.3
    • /
    • pp.299-314
    • /
    • 2012
  • One of reasons for introducing Building Information Modeling (BIM) is to support clash detection tasks by means of a 3D product model. In the conventional construction project process, clashes have been found during construction phase. However, it can cause cost overrun and time delay. In order to investigate and correct clash detections at design phase, relevant business process and guide for this task should be provided. This study aims to identify hindrances in clash detection tasks at the design phase and analyze its current process using IDEF0 model. Despite the convenience of IDEF0 as a systems analysis tool, professional participants might have difficulties to understand their own tasks according to business process. For this reason, in this research, Business Process Model and Notation (BPMN) is introduced to provide ideal process and required decision making governance. The provide BPMN model will provide insights for a BIM-based collaborative environment to enhance the constructability through the construction project.

A Study on Certification Method of Health and Barrier Free Environment by the BIM for Aged Person - With Sanitary Facilities of Elderly Housing Facility - (노인 주거시설의 위생공간을 중심으로 고령자의 건강과 무장애 생활환경을 위한 인증 방법에 관한 연구 - BIM기반 설계 및 응용을 통한 방법을 중심으로 -)

  • Hong, Sa-Chul;Paik, Jin-Kyung;Kim, Suk-Tae
    • Korean Institute of Interior Design Journal
    • /
    • v.26 no.3
    • /
    • pp.13-24
    • /
    • 2017
  • Promoting barrier-free living environments is necessary in residential facilities on which senior citizens rely most of their lives. Safety of elder people can be reassured by a certification system based on the existing barrier-free certification program in public facilities. The range of certification does not cover all living area, but is limited to the bathroom, which is a sanitary space. Given the nature of BIM modeling, an existing multi-family building was selected and modeled, as the certification process requires all the necessary information and various viewport. BIM modeling of the bathroom was conducted in accordance with the requirements of the certification for barrier-free living environment. The results suggested that there is a need for a removal of thresholds, larger doors, better selection of finishing materials, sufficient room for a wheelchair, larger space next to the toilet, and the availability of an emergency bell and grab bars. Such information supports the potentials of BIM modeling, and it is expected that an automated certification system would be established in the foreseeable future.

A Research on the Parametric Design Method in Pre-Design Phase for BIM application (BIM 적용을 위한 기획설계 단계의 파라메트릭 디자인기법에 대한 연구)

  • Ha, Seung-Beom
    • The Journal of the Convergence on Culture Technology
    • /
    • v.7 no.1
    • /
    • pp.92-98
    • /
    • 2021
  • Modern society needs constantly the rationality and the efficiency, and this flow of the time has become the paradigm of the whole society. This paradigm has a large influence on the architectural design and industry. Modern technology represented by the development of digital instrument and Information Technology through internet has created and developed two big trend, Parametric Design and BIM(Building information Modeling) in the architectural design and industry. These technologies, though created for different reasons, have a lot of influence on the architectural design and industry for a common purpose such as efficiency and rationality across the boundaries. In this context, this research will be embodied through the example about how parametric design should be made in the beginning of pre-design phase for BIM application. This research aims to consider the design process of Walt Diseny Consert Hall, the work of Frank O. Ghery, a deconstructivism architect, and to embody the shape of National Nederlanden Building in Prague, the Czech Republic, using parametric design tool in pre-design phase. This research later aims to be used as the basic data that can be applied to the entire architectural industry from a planning and a detailed design to a construction for the ultimate BIM application beyond the range of parametric design in pre-design phase. Later, the plan using the parametric design algorithm and BIM application in construction document phase will be conducted.