Practical use of computational building information modeling in repairing and maintenance of hospital building- case study

  • Akhoundan, Majid Reza;Khademi, Kia;Bahmanoo, Sam;Wakil, Karzan;Mohamad, Edy Tonnizam;Khorami, Majid
    • Smart Structures and Systems
    • /
    • 제22권5호
    • /
    • pp.575-586
    • /
    • 2018
  • Computational Building Information Modeling (BIM) is an intelligent 3D model-based process that provides architecture, engineering, and construction professionals the insight to plan, design, construct, and manage buildings and infrastructure more efficiently. This paper aims at using BIM in Hospitals configurations protection. Infrastructure projects are classified as huge structural projects taking advantage of many resources such as finance, materials, human labor, facilities and time. Immense expenses in infrastructure programs should be allocated to estimating the expected results of these arrangements in domestic economy. Hence, the significance of feasibility studies is inevitable in project construction, in this way the necessity in promoting the strategies and using global contemporary technologies in the process of construction maintenance cannot be neglected. This paper aims at using the building information modeling in covering Imam Khomeini Hospital's equipment. First, the relationship between hospital constructions maintenance and repairing, using the building information modeling, is demonstrated. Then, using library studies, the effective factors of constructions' repairing and maintenance were collected. Finally, the possibilities of adding these factors in Revit software, as one of the most applicable software within BIM is investigated and have been identified in some items, where either this software can enter or the software for supporting the repairing and maintenance phase lacks them. The results clearly indicated that the required graphical factors in construction information modeling can be identified and applied successfully.

사물인터넷 시뮬레이션 시스템 개발을 위한 건물정보의 활용에 관한 기초연구 (A Basic Study on Utilization of Building Information for n Internet of Things (IoT) Simulation System Development)

  • 유정현;이윤길
    • 예술인문사회 융합 멀티미디어 논문지
    • /
    • 제8권1호
    • /
    • pp.867-874
    • /
    • 2018
  • 본 연구는 건축설계 안에서 사물인터넷서비스를 시뮬레이션 하는 일종의 전문가 시스템을 개발하는 연구로서 건물정보를 활용하여 보다 향상된 기능의 시뮬레이션을 구현하는 것을 목표로 한다. 본 연구에서 소개되는 프로토타입 시스템(iotBIM)은 사용자의 행위와 사물인터넷서비스를 디자인 대안으로부터 자동으로 생성된 가상공간상에서 시뮬레이션 한다. iotBIM의 개발을 위하여 본 연구에서는 상용 건축정보모델링(BIM) 저작도구를 이용하였다. iotBIM의 개발을 위하여 건축정보모델링 플랫폼을 활용한 것은 BIM 설계과정에 이미 세밀한 3차원 모델이 생성되기 때문이다. 따라서 iotBIM은 BIM기반 플랫폼에 장착되어 디자인 대안에 대한 시뮬레이션 모듈로 활용된다. 건축 디자인 과정 중에서 건축가는 iotBIM을 실행시킬 수 있으며 이를 통하여 가상공간에서 이루어지는 시뮬레이션을 통하여 사물인터넷 서비스 상황을 눈으로 확인하고 디자인 의사결정을 할 수 있다. 본 연구는 기초적 성격의 연구로서 본 연구의 궁극적인 목표 달성을 위한 이론적 기술적 기반을 마련하기 위한 것이다.

초고층 건축물 전력관리 시스템에 BIM 적용을 위한 기초적 연구 (A Fundamental Study on Applying BIM to Power Manage System of Super Tall Buildings)

  • 조찬원;권순호;이운재;노태임;옥종호
    • 한국CDE학회논문집
    • /
    • 제17권2호
    • /
    • pp.140-148
    • /
    • 2012
  • This study aims to provide power monitoring system for super tall buildings with 3D BIM (Building Information Modeling) technology. In order to realize this subject, standard specifications for BIM objects and attributes were studied through analyzing processes and elements of electrical utilities for power management systems applied for super tall buildings. These standard BIM specifications could be used by designers, contractors and facility operators, and thus could be helpful to realize BIM information sharing between multiple disciplines and construction phases. And further study has been suggested to develop standard specification and applications from this study.

건축인허가 법규에 따른 BIM 정보 관리 방안 연구 (A Study on the Additional Properties Management Method for Building Code Automated Checking by BIM)

  • 김병주;김규용
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.211-212
    • /
    • 2023
  • Building Information Modeling (BIM) design has been mandatory in Korea since 2016, and it has been gradually expanding in the industry, with a slow attempt to apply it in remodeling constructions. This is because Korea is facing a situation where many buildings are over 30 years old and require remodeling or reconstruction. The remodeling industry is also a growing market, as it saves construction time and cost compared to reconstruction. BIM is an ideal technology element for a competitive remodeling construction, as remodeling constructions face a complicated construction process from the start, including demolition, maintenance, and reinforcement to save the change process. However, there are still limitations in applying BIM to remodeling constructions, due to considerations of the existing building and the complicated requests of the inhabitants. BIM still has technical and environmental limitations for general use. In this study, I analyzed BIM application cases from existing studies and suggest what improvement points should be strengthened.

  • PDF

건축 기획 BIM의 공간 프로그래밍 단계에서 발주자 의사결정지원을 위한 물량예측 방법론에 관한 연구 -건축마감을 중심으로- (A Study on the Process of Estimating the Amount of Materials for Client's Decision-Making Support in Space Programming Stage of Pre-design BIM -focusing on Building Interior Finishing-)

  • 전영진;김주형;김재준
    • 한국디지털건축인테리어학회논문집
    • /
    • 제10권3호
    • /
    • pp.19-28
    • /
    • 2010
  • The construction projects are recently having changes in their magnitude and complexity. Therefore, the amount of information created and managed by participants over project phases is enormous and this may cause difficulties in consistent and integrated data management. Because of the change in construction projects, there is a need to apply more logical and systematic ways to deal integrated data management. For the solution to this, BIM(Building Information Modeling), a new paradigm for integrated management of the information over project life-cycle, has been seriously considered. Also, the Korean Public Procurement Service announced that project over 50 billion Korean Won should introduce BIM into procurement starting from 2012. However, the studies and development have lack on studies of applying BIM and managing the data made using BIM in pre-design and maintenance stage. In pre-design stage, the concept of schematic design model is made to support for making major decisions concerning the size, shape and cost of the project. To decide the cost for the building in this stage by making use of BIM, estimating the amount of building materials used for constructing should be preceded. In this study, the pre-design BIM is explained to gain a better understanding of its process, since this paper focused on space programming stage. Finally, the paper suggests the concept process of estimating the amount of materials in building interior finishing from selecting the type for the elements of each space made to support the client for making decisions in space programming stage based on pre-design BIM.

Case Study : BIM for Planning, Simulating, and Implementing Complex Site Logistics

  • Kim, JongHoon;Cohen, Fernando Castillo
    • 한국BIM학회 논문집
    • /
    • 제5권4호
    • /
    • pp.47-52
    • /
    • 2015
  • This paper presents a case study using Building Information Modeling (BIM) for planning, simulating, and implementing complex site logistics in a headquarter office building construction project in Silver Spring, MD. As part of the project a prefabricated 92ft structural tube steel pedestrian connector bridge was installed between two adjacent buildings in the city of Silver Spring, MD. There were multiple significant challenges to deliver, offload, prepare, and install the connector bridge safely, on time, and with the minimum disturbances to the neighbors. BIM was of the foremost importance to visualize, simulate, analyze, improve, and communicate the site logistics plan from delivery to installation of the connector bridge. As a result of the effort, GC of the project was able to prepare a highly detailed plan, communicate it effectively to all stakeholders, and flawlessly execute the work as planned. This case study would provide a useful reference for contractors who are seeking a better planning method that enables generation of more accurate, implementable, optimized plans for complex site logistics.

BIM 기반 3차원 모델 라이브러리를 통한 모듈러 교각의 정보모델링 (Information Modeling of Modular Bridge Pier using BIM Based 3D-Model Library)

  • 조제헌;김동욱;이광명;남상혁
    • 한국BIM학회 논문집
    • /
    • 제3권4호
    • /
    • pp.11-18
    • /
    • 2013
  • Modular technology has become a major issue of the construction industries to enhance their productivity. Modular bridge construction generally requires the collaboration between the contractor, designer, fabricator and constructor. Therefore, a readily accessible information model based on BIM technology should be provided for their communication during a construction project life-cycle. In this study, BIM based 3D information modeling was carried out for the modular bridge pier. First, the product breakdown structure (PBS) and level of detail (LOD) of the pier were defined. Based on them, 3D models were created by using parametric modeling method. In addition, database was constructed for the exchange of geometry and property data of 3D models. Finally, application areas of 3D information model were suggested, including the quantity estimation and the 4D simulation.

모듈러 교량 하부구조를 위한 3차원 변수모델의 개발 (Development of 3D Parametric Models for Modular Bridge Substructures)

  • 김동욱;정동기;심창수
    • 한국BIM학회 논문집
    • /
    • 제2권2호
    • /
    • pp.37-45
    • /
    • 2012
  • 부재를 표준화하여 설계 및 제작 생산성을 높이고 기계화 시공을 가능하게 하는 모듈러 교량이 건설 산업에서 중요하게 대두되고 있다. 반복성이 높고 설계, 제작 시공 과정에서의 정보의 원활한 전달이 필요하기 때문에 BIM(Building Information Modeling) 기술에 기반한 변수 모델링 정의를 제시하였다. 모듈러 교량이 갖는 변수 범위를 고려하여 고정변수, 변동변수, 연관변수로 구분하여 정의하고 이를 설계, 해석, 제작에 활용할 수 있도록 하였다. 구조시스템 개발과정의 지식을 정보화하여 3차원 모델의 정확성과 활용성을 높였다.

설계단계에서 적정 기계설비 공사비 산정을 위한 BIM 정보표현수준(BIL) 개선안 (A Proposal of BIL for Reasonable Cost Estimation of Mechanical Contracts and Construction in Design Phases)

  • 박보성;김선혜
    • 설비공학논문집
    • /
    • 제29권12호
    • /
    • pp.663-672
    • /
    • 2017
  • Building information modeling (BIM) technology based on 3D modeling has been applied to the entire domestic construction industry since 2010. It can calculate quantity take-off considering construction productivity at design phase. Based on this, it is possible to improve the reliability of construction cost prediction of design phase in the process of cost estimation. However, Building Information Level (BIL) defined by Ministry of Land, Infrastructure and Transport and Public Procurement Service does not seem to offer doable environment due to the lack of detailed application items. By calculating construction cost that meets Construction Cost Estimate Accuracy by American Association of Cost Engineers (AACE) through quantity take-off and cost estimation based on 3D modeling of BIM technology, a BIL improvement proposal at design phase for Mechanical Contracts and Construction is provided here. Results showed that properties including outline and minimum specification of the main equipment, internal main piping, and internal main duct should be defined from the intermediate design phase to have reliable cost estimation.

DEVELOPMENT OF MOBILE APPLICATION BASED RFID AND BIM FOR DEFECT MANAGEMENT ON CONSTRUCTION FIELD

  • Oh-Seong Kwon;Hwi-Gyoung Ko;Hee-Taek Park;Chan-Sik Park
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.7-13
    • /
    • 2013
  • Recently, defect management have been considered as one of the major issues for more large-sized and complicated in domestic construction industry. However, the defect management have not been performed systematically because of special manpower, excessive amount of documents, 2D based inspection work, unclear traditional checklists, complicated work process and difficulty in communicating construction information. Therefore, the construction field manager could not performed the quality inspection and defect management work on time as well as the reliability of recorded quality and defect factors was decreased. The primary objective of this study is develop a Construction Defect Management Application CDMA) using a mobile (smartphone). The application can be sharing a huge information and communication technology based on RFID (Radio-Frequency Identification), BIM (Building Information Modeling) which enables field mangers to efficiently gather the information of defection in construction on-site.

  • PDF