DEVELOPMENT OF LEGALITY SYSTEM FOR BUILDING ADMINISTRATION PERMISSION SERVICE BASED ON BIM

  • Inhan Kim;Jungsik Choi
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.593-600
    • /
    • 2009
  • In Korea, the government has developed SEUMTER, an administration system for building related public service, to facilitate and promote the electronic submission and permission activities. SEUMTER is progressing legality system based on 2D drawing for building administration permission service. However, there are a lot of problems related to legality system owing to complexity of Korea regulation relation and structure, inefficiency of legality system based on 2D drawing, duplication examination of document (soliciting forms for civil affairs) and drawing. Therefore, the purpose of this study is to develop legality system for building administration permission service based on BIM in Korea. To achieve this purpose, the authors have investigated permission procedure and regulation structure that is used in current building administration permission and suggested permission procedure and regulation structure for legality system based on BIM. In addition, the authors have investigated element technologies (for examples, method of structured regulation, BIM model checker, Viewer, etc) for legality system based on BIM. Finally, the authors have suggested strategy and hereafter direction for application of legality system based on BIM.

  • PDF

발주처 관점의 시설물 생애주기 관리를 위한 BIM 기반 건설 프로젝트 사례 분석 (BIM based Construction Project Case Analysis for Facility Life Cycle Management from the Perspective of the Client)

  • 함남혁;김웅기;김재준
    • 한국BIM학회 논문집
    • /
    • 제10권3호
    • /
    • pp.12-21
    • /
    • 2020
  • From the perspective of the client, the value of information for use in facility management is very low at the point of use. This is because the facility owner, who is a non-professional, cannot accurately request necessary information from the perspective of long-term facility life cycle management. The purpose of this study is to define the information necessary for facility management and to analyze the project operation method to procur this information to the client using BIM. To this end, this study analyzed the role of client and contractor, project delivery process, standards, and submissions in the BIM-based procurement area through USACE Air Force Hospital project case analysis. As a result of the analysis, if the client, who is the subject of facility operation, defines in advance the type and input method of necessary information in the operation stage, the client can receive the BIM optimized for operation from the contractor. The results of this study can be used to establish standards for receiving information necessary for establishment of procurement process and facility management of public institutions considering BIM introduction.

BIM 기반 토목 라이브러리를 통한 견적자동화시스템에 관한 연구 (A Study on the Automated Estimating System using BIM based Library)

  • 한정훈;남상혁
    • 한국BIM학회 논문집
    • /
    • 제1권2호
    • /
    • pp.12-18
    • /
    • 2011
  • 건설 프로젝트 생애주기 전반에 걸쳐 생성되는 정보를 3차원 모델을 기반으로 관리하는 BIM (Building Information Modeling) 기술은 계획, 설계, 구조해석은 물론 견적 및 3차원 시뮬레이션을 통한 시공계획 등 공사관리 업무를 통합하는 방향으로 발전하고 있다. BIM 기반 견적모델은 3차원 모델의 사용 용도에 따라 상세수준의 차이와 모델정보의 차이를 보이는데, 본 연구에서는 교량 구조물을 대상으로 하여 견적을 위한 모델의 LOD 수준을 파악하였다. 또한 건설정보 분류체계에 적용되는 라이브러리의 클래스를 정의하고 Microstation의 API를 이용하여 클래스의 파라메터를 추출하여 파라메터와 연동되는 Resource의 물량정보를 산출한다. 견적 모델과 상이하게 모델링된 모델에서 하위 모델을 계층화 하고 견적수준으로 병합함으로써 BIM 기반 토목 라이브러리를 통한 견적자동화시스템을 검증하였다.

국내 BIM 기반 건설 프로젝트에서의 설계단계 성과물 작성 효율화 방안에 관한 연구 (Efficiency Improvement Plan for Output Management at the Design Phase in BIM-Based Projects)

  • 김기남;서희창;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2010년도 춘계 학술논문 발표대회 1부
    • /
    • pp.261-264
    • /
    • 2010
  • As construction projects get bigger and more complex, communication and information flow among participants become key success factors of a project. Accordingly, construction projects to respond to these changes being made in the introduction of BIM (Building Information Modeling). But as 2D drawings are still to be widely used in practical fields, it is very important that 2D drawing information could be easily and clearly projected from 3D BIM data. In this study suggest that efficiency of design phase in BIM-based construction projects for can cause confusion and additional work in traditional to BIM.

  • PDF

BIM 기반 건축설계 품질검토를 위한 체크리스트 개발 연구 (Development of Check-list for BIM Based Architectural Design Quality Check)

  • 최중식;김인한
    • 한국CDE학회논문집
    • /
    • 제18권3호
    • /
    • pp.177-188
    • /
    • 2013
  • The construction industry consists of various and massive architectural information as an architectural process includes a variety of design stages with cooperation of many disciplines. Particularly, architectural information is generated and managed through the life cycle of a building, from conceptual design stage to the construction and maintenance. A Building Information Model (BIM) serves as a shared knowledge resource for information about a facility forming a reliable basis for decisions during its life-cycle from inception onward. BIM technology accomplished quantitative development being utilized in various disciplines. However, it is necessary to develop environment and requirement for qualitative improvement of BIM based project. Particularly, requirement is very important for architectural design evaluations. The purpose of this study is to develop and apply of quality control check-list for improving the quality of architectural design in BIM environments. To achieve this purpose, the authors have investigated case study for open BIM data quality control (software, guideline and application case) and classified quality control targets according to physical/logical quality control and data quality. In addition, the authors have defined open BIM based quality control process and developed quality control check-list. Finally, the authors have developed automatic quality check system using requirements for efficient quality control based on open BIM.

도로분야 BIM 라이브러리를 활용한 실적공사비 산정모델 구축 (An Estimation Model of Historical Cost Using BIM Library for Road Project)

  • 문현석;주기범
    • 한국CDE학회논문집
    • /
    • 제20권4호
    • /
    • pp.431-442
    • /
    • 2015
  • Currently, a BIM-based quantity takeoff (QTO) system is mainly focused on architectural projects. To perform this, diverse quantity takeoff methods such as an object-based automatic quantity takeoff, manual quantity and base functions of calculation have widely been utilizing. However, since BIM library for road projects includes structural elements associated with alignment, it is necessary to establish cost estimation system interlocked with historical cost using 3D library by each unit length. Accordingly, the aim of this study is to develop cost estimation model with using a historical cost approach so that it can be utilized in construction planning based on the BIM library for road projects. For this, based on the BIM library for road, the standardized quantity is estimated, and a process for calculating historical cost and a verification model with a 5D simulation was developed by mapping a WBS code with each BIM library object. This can be applied during the approximate cost estimation process in a project planning and an initial design phase for road projects. Besides, it is expected that these results will be utilized in constructing an optimal historical cost estimation process for project libraries.

공공 공동주택의 BIM적용 설계 경기 평가관리에 한 연구 - BIM적용 가능 평가항목 선정을 중심으로 - (A Study on the Evaluation Management of Public Housing Architectural Competition using BIM)

  • 민병직;임재복;김주형;서종원;김재준
    • 한국BIM학회 논문집
    • /
    • 제2권2호
    • /
    • pp.1-9
    • /
    • 2012
  • 국내 공공 공동주택에 BIM 도입이 추진되었으나, BIM 기반 평가 기준 불확실성 및 관리업무 프로세스 비합리성으로 인한 참여업체의 과도한 설계 유발, 성과품 제출위주의 평가가 이루어지고 있다. 이에 본 연구에서는 공공 공동주택의 BIM 적용 설계 경기평가관리를 위해 실무자의 의견 수렴 및 시범적용을 실시하여 BIM 기술 수준 및 적용 가능성을 파악하고, 이를 통해 현실적인 평가항목 선정을 통한 평가관리 방안을 제시하고자 하였다. 첫째, 본 연구에 앞서 현재 실시되고 있는 BIM 적용 공공 공동주택의 평가 현황을 살펴본 후 사전조사를 통해 BIM이 적용 가능한 항목 15개를 예비 선정 하였다. 둘째, 예비 선정한 15개의 항목 중 BIM 기술수준 적합성, 결과 값 도출과정 명확성, 정보수준 만족 여부를 기준으로 시범적용을 실시한 결과 총 8개의 항목에서 BIM이 적용 가능한 것으로 분석되었다. 특히 현상설계 단계에서의 BIM 적용 평가 가능 항목은 3D 시각화 및 면적 관련 항목이 대부분이며, 기존에 요구되었던 사업비, 에너지/환경분석, 구조, 설비관련 항목은 후속설계 단계(기본, 실시)에 적합한 것으로 정리 할 수 있다. 본 연구의 결과는 현재 국내의 BIM 기술 수준 및 적용 가능성을 올바르게 인식하지 못하고, 무분별한 범위에서 BIM을 적용하고자 하는 현업 실태의 문제점을 지적하고, 적절한 범위에서 가장 객관적인 결과 및 BIM의 효율성을 극대화하고자 하는데 활용할 수 있는 자료를 제공하였다.

국내 모듈러 건축 프로젝트의 단계별 BIM 활용업무 분석 (An Analysis of BIM uptake in Each Phase of Modular Construction Projects in Korea)

  • 이웅균;이명도
    • 대한건축학회연합논문집
    • /
    • 제21권5호
    • /
    • pp.133-140
    • /
    • 2019
  • Building Information Modeling (BIM) and modular construction are regarded as important technologies that could contribute to overcoming the crisis faced by the construction industry. However, BIM uptake in current modular construction projects is limited. Moreover, there are no specific guidelines to support decision-making regarding the application of BIM in modular construction projects. Therefore, this study aims to analyze the possibility for BIM uptake in each phase of modular construction projects in Korea. Initially, the literature detailing on BIM uptake cases in modular construction projects was reviewed. The detailed work and activities for each phase of a modular project were analyzed via a questionnaire targeting domestic modular experts, to derive items requiring improvement due to errors or changes occurring in the actual project. Ten realistic BIM uptake items were derived, reflecting the results of literature review and expert interviews. Then, the BIM uptake items in each phase were analyzed in terms of necessity and efficiency via a second questionnaire using five-point Likert scales. Finally, the BIM utilization index (BIM UI) of the BIM uptake items was suggested as a priority measure. As a result, the BIM UI of "3D coordination" (U2), "design authoring and reviews for off-site fabrication" (U3), and "detailed 3D modeling for off-site fabrication" (U4), were assigned the highest priority. The results of this study can be used as guidelines to support decision-making regarding the application of BIM in modular construction projects.

DESIGN AND USE OF BUILDING INFORMATION MODELS FOR PREPLANNING COMMERCIAL BUILDING CONSTRUCTION ACTIVITIES

  • Thomas M. Korman
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.274-278
    • /
    • 2013
  • Over the past several years, the building codes that govern commercial building construction have become increasingly prescriptive in nature, specifying detailed information related to the design and installation of the systems, while offering no reasoning behind their prescriptive measures. For example, metal stud framing is commonly used in commercial building construction to create bearing walls and non-bearing partition walls. BIM provides a powerful platform for developing and implementing "pre-planning" tools and methods to facilitate both engineering and administrative controls during construction. This paper discusses the use of BIM to enhance constructability for commercial building construction activities, specifically metal stud framing. Using specific real-world examples this paper demonstrates ways that BIM can be used to foresee potential construction issues and motivates and informs future uses of BIM technologies

  • PDF

로지스틱 회귀분석을 이용한 BIM 설계 검토에 의하여 발견된 설계 오류와 그 영향도간의 관계 분석 (Analysis of the Relations between Design Errors Detected during BIM-based Design Validation and their Impacts Using Logistic Regression)

  • 원종성;김재엽
    • 한국건축시공학회지
    • /
    • 제17권6호
    • /
    • pp.535-544
    • /
    • 2017
  • 본 논문은 BIM 기반 설계 검토를 통하여 사전에 방지된 설계 오류와 그 영향도를 통계적으로 분석한다. 이를 위하여 한국에서 수행되었던 2개 BIM 프로젝트에서 BIM 기반 설계 검토를 도입함으로써 발견되었던 약 800여건 이상의 설계오류를 설계 오류 발생 원인별(비논리적 오류, 도면 상이, 누락), 발생 공종별(구조, 건축, 설비)로 분류한다. 시공 이전에 발견된 설계 오류로 인하여 발생할 수 있는 재작업과 공사비, 공사기간, 품질에의 영향 여부를 해당 현장의 실무자와의 인터뷰를 통해서 분류하고, 설계 오류와의 확률적 관계를 로지스틱 회귀분석을 이용하여 분석한다. 분석결과, 설계 오류 발생원인이 공사비 증가, 공기 지연, 품질 저하, 재작업을 유발 확률 예측에 통계적으로 가장 유의미한 관계가 있었다. 두 개의 프로젝트에서 수집된 자료만을 활용하여 설계 오류 간의 관계를 분석하였지만 설계 오류의 특성의 관계가 유사하다는 점에서 의미가 있다고 할 수 있다. 향후에는 다수의 프로젝트에서 수집된 자료를 분석하여 이를 검증하고자 한다.