초고용량 양방향 말뚝재하시험(BDH PLT) 수행사례 분석 (A Case Study of High Capacity Bi-Directional High Pressure Pile Load Test)

  • 김상일;이민희;정성민;정은택;최용규
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2010년도 춘계 학술발표회
    • /
    • pp.1156-1163
    • /
    • 2010
  • The bi-directional high pile load test(BDH PLT) does not have weaknesses found in the existing bi-directional low pile load test(BDL PLT); it has strong economics, is unbound by load capacity limit and secures quality stability of working piles. In this study, Verification the field found a very high capacity level of stability and reliability of the BDH PLT, as well as outstanding field applicability. Field verifications reaffirmed the advantage of the BDH PLT device, which was capable of loading 90 MN capacities as maximum. It was also found to be durable enough to load high capacity with ease.

  • PDF

양방향 고유압 말뚝재하시험(BDH PLT)의 개발 및 적용성에 관한 연구 (Study on Development of the Bi-directional High Pressure Pile Load Test(BDH PLT) and Its Application)

  • 이충숙;이민희;김상일;최용규
    • 한국지반공학회논문집
    • /
    • 제23권6호
    • /
    • pp.23-36
    • /
    • 2007
  • 대구경 현장타설말뚝에 대한 정재하시험의 한계를 극복하기 위하여 양방향 저압 말뚝재하시험이 개발되어 사용되어오고 있으나 이 방법 또한 근원적으로 해결되지 않은 문제점을 내포하고 있다. 즉, 양방향 저압 말뚝재하시험은 대용량 실린더의 배치곤란 및 시험 종료 후 실린더의 미복원에 따른 장치 내 빈 공간잔류 등의 문제점을 내포하고 있다. 본 연구에서는 양방향 복동식 고유압 말뚝재하시험(BDH PLT ; Bi-directional High Pressure Pile Load Test)을 개발하였으며 실제 현장에서 시행된 사례를 분석하여 양방향 복동식 고유압 말뚝재하시험에 대한 적용성을 확보하였다. 현재 양방향 말뚝재하시험 규정이 제정 중에 있으며, 시험종류, 재하용량, 복동식 잭 사용 필요성, 사용말뚝에 적용 시 주의점 등의 주요개념이 포함될 것이다.

양방향 고유압 말뚝재하시험을 이용한 대형건축물 기초의 공사비 절감에 관한 사례 연구 (A Case Study on Construction Cost Reduction of Large-size Building Foundation using Bi-directional High Pressure Pile Load Test(BDHPLT))

  • 김남일;김상일;최용규
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2009년도 춘계 학술발표회
    • /
    • pp.518-525
    • /
    • 2009
  • The bi-directional high pressure pile load test(BDH PLT) which is a kind of pile load tests was conducted to find out a reasonable design procedure of large-diameter drilled shafts of large-size building structures. The behaviors of bearing capacity and settlement of the large-diameter drilled shafts were analyzed and the results obtained from BDH PLT were also compared with those obtained from the equations suggested in the specification. In case of the reasonable design procedure adopted, the construction cost could be saved at least 15 ~ 28%. It could be concluded that BDH PLT should be needed for the foundation construction cost reduction of the high-rise building structures.

  • PDF

양방향 고유압 말뚝재하시험(BDH PLT)을 이용한 초고층 건축물의 대구경 현장타설말뚝 설계절차에 관한 연구 (A Study on the Design Procedure of Mega Foundations for a High-rise Building Using Bi-Directional High Pressure Pile Load Test (BDH PLT))

  • 김성호;최용규
    • 한국지반환경공학회 논문집
    • /
    • 제10권3호
    • /
    • pp.29-36
    • /
    • 2009
  • 본 논문에서는 초고층 건축물이 풍화대지반에 위치하여 대구경 현장타설 말뚝기초로 지지되고 있는 사례를 분석하였다. 본 논문에서 제시한 말뚝기초의 설계 사례는 "예비설계-검증시험-예비설계의 보완"의 3단계를 거쳐 말뚝기초의 설계를 완성한 대표적인 사례로 볼 수 있으며, 검증시험으로 2회의 양방향 고유압 말뚝재하시험이 수행되었다. 이와 같은 설계절차를 준수할 경우 말뚝기초의 경제적인 설계를 수행할 수 있으며, 이를 통하여 말뚝기초 공사비의 대폭적인 절감을 이룰 수 있을 것이다.

  • PDF

대구경 현장타설말뚝의 대용량 양방향 말뚝재하시험 분석 및 극한지지력 추정을 위한 수치해석 연구 (A Numerical Analysis Study for Estimation of Ultimate Bearing Capacity and An Analysis of the High Capacity Bi-directional Pile Load Tests of the Large-diameter Drilled Shafts)

  • 남문석;김상일;홍석우;황성춘;최용규
    • 한국지반환경공학회 논문집
    • /
    • 제12권10호
    • /
    • pp.63-72
    • /
    • 2011
  • 초고층 건축물 기초의 고용량 하중 지지능력을 확인할 수 있는 가장 현실적인 방안인 고유압방식의 고용량 양방향 말뚝재하시험을 2개 현장에서 실시하였다. 고유압 복동식 양방향 말뚝재하시험은 정재하시험 시 재하용량 한계와 현장조건의 제약을 극복 할 수 있는 가장 현실적인 방안으로 볼 수 있었으며 고용량이 필요한 시험말뚝에 대한 재하시험에 매우 유용한 시험방법으로 판단되었다. 2개의 사례에서 계산된 설계하중 충족비는 각각 3.3, 2.1이었으므로 사례(P-2)에서 1방향 재하하중을 다소 작게 재하하였더라면 말뚝기초의 안정성을 실증적으로 확인하지 못하였을 것으로 판단되었다. 초고용량의 양방향 말뚝재하시험에서 설정한 최대하중까지 재하하더라도 말뚝 및 지반의 극한상태를 확인하는 것은 쉽지 않았으므로 대구경 현장타설말뚝의 극한지지력을 추정하기 위하여 2개의 고용량 대구경 현장타설말뚝에 대한 수치해석을 실시하였다.