• Title/Summary/Keyword: Availability Period

Search Result 400, Processing Time 0.021 seconds

Impact of ITSM Military Service Quality and Value on Service Trust

  • Woo, Hanchul;Lee, Sangdo;Huh, Jun-Ho;Jeong, Sukjae
    • Journal of Multimedia Information System
    • /
    • v.7 no.1
    • /
    • pp.55-72
    • /
    • 2020
  • As the IT service environment grows, it is critical in terms of IT service quality to minimize the occurrence of failures due to changes in applications and to diagnose and recover in a short period of time how failure will affect the business. Thus, the Defense Acquisition Program Administration (DAPA) has been building and operating ITSMs to implement IT service management in a leading manner. Information Technology Service Management (ITSM) is divided into events, obstacles, changes, versions and setup management to ensure flexibility and stability in service delivery. It is also operated separately from service level, availability, capacity, financial and IT service continuity management to ensure service quality and cost efficiency. Based on ITSM military service history, this study looks at the impact of quality of service on value, satisfaction, and trust. The results of the analysis are highly valuable for future ITSM implementation and operation.

Determining the Current Spare Parts Level in a Dynamic Environment (동적 환경에서의 동시조달 수리부속품 재고수준 결정)

  • 우제웅;강맹규
    • Journal of the military operations research society of Korea
    • /
    • v.24 no.2
    • /
    • pp.146-161
    • /
    • 1998
  • This article develops model of the nonstationary state behavior of the multiechelon spare parts provisioning systems. This study is concerned with a problem of determining the near optimal requirements level of the spare parts, especially Concurrent Spare Parts(CSP). CSP is supplied with the procurement of new equipment system, and is used to sustain the equipment without resupply during the initial coverage period. We consider this situation as a multiechelon inventory model with several bases and one depot. And we assume an equipment system which consists of many types of parts would grounded if one of the parts fail. Also this multiechelon CSP problem is considering the nonstationary poisson failure process and nonstationary exponential repair process in a dynamic environment. We develop an efficient computational procedure to find the near optimal number of spare parts minimizing the total expected cost, while achieving the required system availability. Finally we present a simple example of suggested method.

  • PDF

Cloud Forecast using Numerical Weather Prediction (수치 예보를 이용한 구름 예보)

  • Kim, Young-Chul
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.15 no.3
    • /
    • pp.57-62
    • /
    • 2007
  • In this paper, we attempted to produce the cloud forecast that use the numerical weather prediction(NWP) MM5 for objective cloud forecast. We presented two methods for cloud forecast. One of them used total cloud mixing ratio registered to sum(synthesis) of cloud-water and cloud-ice grain mixing ratio those are variables related to cloud among NWP result data and the other method that used relative humidity. An experiment was carried out period from 23th to 24th July 2004. According to the sequence of comparing the derived cloud forecast data with the observed value, it was indicated that both of those have a practical use possibility as cloud forecast method. Specially in this Case study, cloud forecast method that use total cloud mixing ratio indicated good forecast availability to forecast of the low level clouds as well as middle and high level clouds.

  • PDF

Optimal Provisioning Quantity Determination of Consumable Concurrent Spare Part under the Fund Limitation (자금제약하에서의 소모성 동시조달부품의 최적구매량 결정)

  • 오근태;차상원
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.24 no.69
    • /
    • pp.1-12
    • /
    • 2001
  • In this paper, the consumable concurred spare parts requirement determination problem of newly procured equipment systems is considered. The problem is formulated as the operational availability maximization problem with any given fund limitation. the that the failure of a part follows a Poisson process and part failure rate is constant in spite of the decrease of number of equipments during operational period, an analytical method is developed to obtain spare part requirements using the generalized Lagrange multipliers method, The numerical examples show that analytic solution is mostly equal to the realistic solution obtained from simulation regardless of assumptions about part failure rate. It is expected that the analytical method developed in the paper can be effectively used to make a budget for provisioning the concurrent spare parts of newly procured equipment system.

  • PDF

Chytrid Distribution in Diverse Boreal Manitoba Sites

  • Lee, Eun-Ju
    • Animal cells and systems
    • /
    • v.4 no.1
    • /
    • pp.57-62
    • /
    • 2000
  • Soil samples were collected in thirteen Manitoba boreal forest sites. Spatial distribution of chytrids from diverse boreal forest microhabitats was investigated by baiting with jack pine pollen. After baiting, the pollen was surveyed for chytrids for 8 ten day period and individual species were counted. Total infestations of pollen by chytrids ranged from 5.8% to 90.2% from various soils. Each site with high infestation was characterized by litter with high needle content while mineral soil or soil with limited organic matter yielded low levels of pollen infestation. Species diversity tended to be higher in soils with higher pollen infestation and lower in soils with lower pollen infestation. Lower diversity was generally observed in mineral soils or soils with a limited organic horizon comprised, in part, of broad leaf litter. Based on coefficients of association and species in common among species across the collection sites, it was possible to relate dominant species assemblages in site groups. These species assemblages in the site groups suggest that the chytrids are distributed by litter and soil types. It can be concluded that the substratum characteristics of litter types and availability of litter may be important in describing chytrid distribution in boreal forest sites.

  • PDF

CONSIDERABLE FACTORS FOR FINAL OCCLUSION IN PRE-ORTHODONTIC LOWER ANTERIOR SEGMENTAL SURGERY AND ITS AVAILABILITY (교정전 하악전치부 분절골절단술 시행시 고려사항 및 그 유용성)

  • Lee, Baek-Soo;Choi, Hyun-Jung;Nam, Kwang-Ho;Ryu, Dong-Mok
    • Journal of the Korean Association of Oral and Maxillofacial Surgeons
    • /
    • v.29 no.1
    • /
    • pp.43-47
    • /
    • 2003
  • Anterior set back segmental surgery has been used for shortening the period of orthodontic treatment in case of bimaxillary or maxillary protrusion. In most cases, it requires pre-operative orthodontic treatment. Through properly performed leveling and tooth aligning, the operative porcedure can be easier and post-operative occlusal stability can be increased. But it takes time for orthodontic treatment. Recently, we have been using anterior segmental surgery before orthodontic treatment and have reliable results from that. Therefore, we have to consider arch shape, curve of Spee, tooth selection to be extracted for obtaining of post-operative occlusal stability without pre-operative orthodontic treatment.

Multi-Year Maintenance Scheduling of Generators with Considering Total Cost (사회적 총비용을 고려한 발전기 장기 보수계획수립에 관한 연구)

  • Cha, J.M.;Song, K.Y.;Kim, Y.H.
    • Proceedings of the KIEE Conference
    • /
    • 1996.07b
    • /
    • pp.701-703
    • /
    • 1996
  • Maintenance scheduling plays an important role in evaluating the supply reliability of power systems. Since generating units must be maintained and inspected, the generation planner must schedule planned outages during the year. Several factors entering into this scheduling analysis include: seasonal load-demand profile, amount of maintenance to bo done on all generating units, size of the units, elapsed time from last maintenance, and availability of maintenance crews. This paper proposes a new algorithm to decide the multi-year maintenance scheduling with considering the total cost. We adjust the maintenance scheduling to levelize the reliability over all period. The proposed algorithm is applied to a real size power system and the developed reliability results are obtained.

  • PDF

An Algorithm for Determining Consumable Spare Parts Requirement under Avialability Constraint (운용가용도 제약하에서의 소모성 예비부품의 구매량 결정을 위한 해법)

  • 오근태;나윤군
    • Journal of the Korea Society for Simulation
    • /
    • v.10 no.3
    • /
    • pp.83-94
    • /
    • 2001
  • In this paper, the consumable spare parts requirement determination problem of newly procured equipment systems is considered. The problem is formulated as the cost minimization problem with operational availability constraint. Assuming part failure rate is constant during operational period, an analytical method is developed to obtain spare part requirements. Since this solution tends to overestimate the requirements, a fast search simulation procedure is introduced to adjust it to the realistic solution. The analytical solution procedure and the simulation procedure are performed recursively until a near optimal solution is achieved. The experimental results show that the near optimal solution is approached in a fairly short amount of time.

  • PDF

Project Scheduling Problem with Resource Constraints Minimizing Cost (자원비용을 고려한 프로젝트 스케듈링에 관한 연구)

  • 서순근;최종덕
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.14 no.23
    • /
    • pp.19-25
    • /
    • 1991
  • In this paper, constrained resource project scheduling problems schedule project activities subject to finite constraints on the availability of non-storable resource. Further, resources are assumed to be available per period in constant amounts, and are also demanded by an activity in constant amounts throughout the duration of the activity. We describe formulation which minimizes the combined cost of fluctuations in resource demand and delay of project completion. Cost bounding procedures are augmented by dominance relationships presented as theorems. This paper presents algorithm for solving the problem. And numerical examples are presented. Sensitivity analysis to evaluate the effect of changes of cost efficients is conducted.

  • PDF

The Movement Monitoring of Structures using GPS

  • Shon, Howoong;Oh, Seok Hoon;Kim, Youngkyung
    • Journal of the Korean Geophysical Society
    • /
    • v.7 no.4
    • /
    • pp.325-330
    • /
    • 2004
  • For the monitoring of structures, it is desirable for the measurement system to deliver equal precision in all components. When using GPS the accuracy, availability, reliability and integrity of the position solutions is very dependent on the number and geometric distribution of the available satellites. Therefore the positioning precision is not the same in all there component, and large variations (in positioning) precision can be expected during a 24-hour period. This situation becomes worse when the line-of-sight to GPS satellites becomes obstructed, such as in urban environments. Pseudolites can be sed to augment GPS and improve a geometrically weak satellite constellation. The use of pseudolites as supplement(s) of GPS for the movement measurement of bridges is demonstrated in this paper. It is shown that pseudollites can improve the vertical position components.

  • PDF