The Transactions of the Korean Institute of Electrical Engineers P
/
v.56
no.2
/
pp.109-114
/
2007
This paper summarize about the auxiliary electrode measured a ground resistance. The method to measure a ground resistance is the fall-of-potential method to using an auxiliary electrode. And an auxiliary electrode must be set up on the ground. Today it is so difficult to set up the auxiliary electrode on the ground because of many concrete building and many paved roads. So this paper is regarding a trust analysis of the ground resistance measurement by the substitute auxiliary electrode. It substituted a iron structure around the building, a neutral line multiplex ground to earth, a wire net for auxiliary electrode. This information is confirmed bv compared with the measurement value.
The Transactions of the Korean Institute of Electrical Engineers P
/
v.66
no.4
/
pp.177-181
/
2017
Auxiliary power supply for railway vehicle is a equipment that focuses on the service of passengers in a vehicle. It supplies power to controllers used in heating and cooling devices, fluorescent lamps, batteries and many other electrical equipments. Most of the auxiliary power supply for railway vehicle are mainly used for the round trips and circulation routes within the metropolitan area and have a capacity of 170~200 kVA. In this study, we developed the auxiliary power supply capacity to 240kVA for 200km/h class. As such, the auxiliary power supply is an important device for securing the reliability and safety of the railway vehicle and improving the passenger convenience, so the performance verification of the performance must be ensured. In this paper, 240kVA auxiliary power supply is developed. Also, performance of the auxiliary power supply manufactured through the analysis of various characteristics related to the auxiliary power supply was confirmed while operating the actual line.
Normally, various auxiliary loads are installed along with the main load in industrial applications. Usually, load transformers are used to convey such types of auxiliary loads. The transformers become energized when the loads are turned-on, consequently, high amplitude of inrush current appears at the output of the uninterrupted power supply (UPS) system. To mitigate these high current amplitudes, this manuscript suggests a three-phase line-interactive UPS system to counter the inrush current during the turning-on of the auxiliary load transformer while powering the main load by using a current controlled inverter. Experimental results of a laboratory-sized prototype are provided in the support of the proposed UPS system for validation.
It is not easy to find the auxiliary line to solve the problem in connection with the circle, where it is the problem finding the central angle or angle at the circumference in a circle. The purpose of the study is to give an aid for this difficulties. The angle at the circumference is closely related to the arc. And so we looked into the problem in connection with the angle at the circumference in point of view of the arc. We have got the following the results. It is not necessary to draw the auxiliary line when solving the problem in connection with the angle at the circumference in point of view of the arc. And we can find the reason to draw the specific auxiliary in point of view of the arc. We hope that the results of research are given aids to a lot of students.
Kim, Dong-Woo;Gil, Hyoung-Jun;Kim, Dong-Ook;Lee, Ki-Yeon;Moon, Hyun-Wook
The Transactions of The Korean Institute of Electrical Engineers
/
v.60
no.10
/
pp.1984-1991
/
2011
Among ground impedance measurement methods, the fall-of-potential method is the most thorough and reliable method. In the fall-of-potential method, ground electrode and auxiliary probes are placed in a straight line, and then, auxiliary potential probe is moved away from the ground electrode. The point at which plotted resistance curve flattens out is taken as right position of auxiliary potential probe. However, in some cases, it is hard to place ground electrode and auxiliary probes in a straight line. Therefore, we provided alternative placement method in this research. The method can be easily applicable to placing auxiliary probes. Also, this paper analyzed and compared ground impedance measurement standards of large grounding systems. Based on the analysis, practical measurement method using an earth tester was proposed. The proposed methods presented in this paper will be useful when determining locations of auxiliary probes in alternative positions, and the methods can be applied practically and easily.
This paper describes the measurement and analysis of ground impedance according to arrangement of auxiliary probe around ground grid using the fall-of-potential method and the testing techniques to minimize the measuring errors are proposed. The fall-of-potential method involves passing a current between a ground electrode and a current probe, and then measuring the voltage between a ground electrode and a potential probe. To minimize interelectrode influences due to mutual resistances, the current probe is a generally placed at a substantial distance from the ground electrode under test. In order to analyze the effects of ground impedance due to the arrangement of auxiliary probe and frequency, ground impedances were measured in case that the arrangements of auxiliary probe were straight line, perpendicular line, and horizontal line. The distance of current probe was located from 10[m] to 200[m] and the measuring frequency was ranged from 55[Hz] to 513[Hz]. As a consequence, the ground impedance increases with increasing the distance from the ground electrode to the point to be tested, but the ground impedance decreases with increasing the frequency.
As the on-board electric devices determine the performances of vehicles, production of reliable devices is important. To keep the reliability of devices constant, management of performance evaluation of the on-board devices is crucial. Because temperature bas a serious effect on failures of the components of the devices, its measurement is the first step for good management. In this study, we described performance characteristics of domestic auxiliary block developed through G7 project. We measured the performances of auxiliary block during test running by the developed on-line measurement system. After we save the input real-time data from each signal of Korean High Speed Train through the network line, we can acquire necessary information through Post-Processing program. We verify the auxiliary converter characteristics of Korean High Speed Train by this system.
Kim, Seog-Won;Kim, Ki-Hwan;Kim, Sang-Soo;Koo, Hun-Mo;Joo, Hyun-Wook;Han, Young-Jae
Journal of the Korean Society for Railway
/
v.9
no.5
s.36
/
pp.612-617
/
2006
As the on-board electric devices determine the performances of vehicles, production of reliable devices is important. To keep the reliability of devices constant, management of performance evaluation of the on-board devices is crucial. Because temperature has a serious effect on failures of the components of the devices, its measurement is the first step for good management. In this study, we described performance characteristics of domestic auxiliary block developed through G7 project. We measured the performances of auxiliary block during test running by the developed on-line measurement system. After we save the input real-time data from each signal of Korean High Speed Train through the network line, we can acquire necessary information through post-processing program. We verify the motor block characteristics of Korean High Speed Train by this system.
The purpose of this study is to investigate the reasons and backgrounds of drawing auxiliary lines in the proof of geometry. In most of proofs in geometry, drawing auxiliary lines provide important clues, thus they play a key role in deductive proof. However, many student tend to have difficulties of drawing auxiliary lines because there seems to be no general rule to produce auxiliary lines. To alleviate such difficulties, informal activities need to be encouraged prior to draw auxiliary lines in rigorous deductive proof. Informal activities are considered to be contrasting to deductive proof, but at the same time they are connected to deductive proof because each in formal activity can be mathematically represented. For example, the informal activities such as fliping and superimposing can be mathematically translated into bisecting line and congruence. To elaborate this idea, some examples from the middle school mathematics were chosen to corroborate the relation between informal activities and deductive proof. This attempt could be a stepping stone to the discussion of how to teach auxiliary lines and deductive reasoning.
The auxiliary power supply system fur passenger service of railway car has been developed from MA(Motor-Alternator) to CVCF Inverter (Static Inverter). Generally, a customer wants to apply tile new control method and device for auxiliary power supply of railcar However, if the auxiliary power supply is supplied to extended existing line, the maintenance cost of the old system is less expensive than new developed system, so, the customer specifies that the auxiliary power supply has compatibility with existing one completely. At that time, the hardware is nearly same as existing system except small changes of accessories for better performance. This paper describes the flicker control using feed-forward method of auxiliary power supply system for new 50 electric railcars, which are delivered to Korean National Railroad (KNR) Kwa-chon Line. The existing power supply system has damping resistor box to stabilize the DC input (1.5 ㎸). At this time, for better system efficiency the new system has not include resistor box but new control method including feed-forward control is applied. This control algorithm realizes the better stabilization of input power compared to the result of the existing system, which includes resistor box
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.