• Title/Summary/Keyword: Automated warehouse

Search Result 44, Processing Time 0.02 seconds

IMPROVING THE USABILITY OF STOCHASTIC SIMULATION BASED SCHEDULING SYSTEM

  • Tae-Hyun Bae;Ryul-Hee Kim;Kyu-Yeol Song;Dong-Eun Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.393-399
    • /
    • 2009
  • This paper introduces an automated tool named Advanced Stochastic Schedule Simulation System (AS4). The system automatically integrates CPM schedule data exported from Primavera Project Planner (P3) and historical activity duration data obtained from a project data warehouse, computes the best fit probability distribution functions (PDFs) of historical activity durations, assigns the PDFs identified to respective activities, computes the optimum number of simulation runs, simulates the schedule network for the optimum number of simulation runs, and estimates the best fit PDF of project completion times (PCTs). AS4 improves the reliability of simulation-based scheduling by effectively dealing with the uncertainties of the activities' durations, increases the usability of the schedule data obtained from commercial CPM software, and effectively handles the variability of the PCTs by finding the best fit PDF of PCTs. It is designed as an easy-to-use computer tool programmed in MATLAB. AS4 encourages the use of simulation-based scheduling because it is simple to use, it simplifies the tedious and burdensome process involved in finding the PDFs of the many activities' durations and in assigning the PDFs to the many activities of a new network under modeling, and it does away with the normality assumptions used by most simulation-based scheduling systems in modeling PCTs.

  • PDF

A study for Secure the Reliability of Automated Guided Vehicle Remote Control System (무인운반차 RCS(Remote Control System)의 신뢰확보를 위한 연구)

  • Jeon, Hyong-Mo;Kang, Sang-Won
    • Journal of Digital Convergence
    • /
    • v.15 no.5
    • /
    • pp.207-215
    • /
    • 2017
  • With rapid development of IT technology and biotechnology, human lifespan is extended rapidly, and we are living in the era where aging becomes the social issue. Due to this aging problem, manpower is mainly replaced by Automated Guided Vehicles (AGV) in manufacturing factories or warehouse logistics transportation. Rate of AGV use increases sharply every year. AGVs, which were used only in Smart Factories, extends its usage into indoor and outdoor operation by changing their usages to container transportation that can carry huge containers in the harbor. With the expansion of AGVs usage, the importance of RCS (Remote Control System) is also increased. In this study, we surveyed and analyzed the characteristics and technology trends of technical features of AGV's RCS that are developing in various ways to establish quality evaluation system of AGV RCS. Based on this, and by referring to international quality assessment standards, ISO/IEC 25000 series, we derived evaluation items on functional suitability and usability to secure reliability of AGV RCS. Also, it is our intention to develop evaluation model using those derived usability and reliability evaluation items.

A Study on Parking Generation Forecasting Model for Factory Facilities in Industrial Site (산업단지 공장시설의 주차수요예측모형 구축에 관한 연구)

  • Ahn, Woo-Young
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.1D
    • /
    • pp.37-44
    • /
    • 2010
  • The present annexed parking lot standards for buildings in Parking Act are categorized in 9 groups with 13 parking standards in terms of recreation, culture and assembly, housing, factory, warehouse, and so on, in which same grouped facilities have same parking standards. These days diversity in building types and functions need more fractionated parking standards; however, most local governments focusing merely on applying strengthened parking standards in general without systematic rules of consistency. The current problem of parking standards being used is lack of regarding facility characteristics; expecially, a large sized high-tech manufacturing facility located in industrial site is still applied by same parking standards as normal manufacturing facility, even though most part of manufacturing process is automated and hence less manpower is employed. This paper presents a parking generation forecasting model for factory facilities in industrial site in terms of facility use and scale characteristics.

A Study on the Intelligent Quick Response System for Fast Fashion(IQRS-FF) (패스트 패션을 위한 지능형 신속대응시스템(IQRS-FF)에 관한 연구)

  • Park, Hyun-Sung;Park, Kwang-Ho
    • Journal of Intelligence and Information Systems
    • /
    • v.16 no.3
    • /
    • pp.163-179
    • /
    • 2010
  • Recentlythe concept of fast fashion is drawing attention as customer needs are diversified and supply lead time is getting shorter in fashion industry. It is emphasized as one of the critical success factors in the fashion industry how quickly and efficiently to satisfy the customer needs as the competition has intensified. Because the fast fashion is inherently susceptible to trend, it is very important for fashion retailers to make quick decisions regarding items to launch, quantity based on demand prediction, and the time to respond. Also the planning decisions must be executed through the business processes of procurement, production, and logistics in real time. In order to adapt to this trend, the fashion industry urgently needs supports from intelligent quick response(QR) system. However, the traditional functions of QR systems have not been able to completely satisfy such demands of the fast fashion industry. This paper proposes an intelligent quick response system for the fast fashion(IQRS-FF). Presented are models for QR process, QR principles and execution, and QR quantity and timing computation. IQRS-FF models support the decision makers by providing useful information with automated and rule-based algorithms. If the predefined conditions of a rule are satisfied, the actions defined in the rule are automatically taken or informed to the decision makers. In IQRS-FF, QRdecisions are made in two stages: pre-season and in-season. In pre-season, firstly master demand prediction is performed based on the macro level analysis such as local and global economy, fashion trends and competitors. The prediction proceeds to the master production and procurement planning. Checking availability and delivery of materials for production, decision makers must make reservations or request procurements. For the outsourcing materials, they must check the availability and capacity of partners. By the master plans, the performance of the QR during the in-season is greatly enhanced and the decision to select the QR items is made fully considering the availability of materials in warehouse as well as partners' capacity. During in-season, the decision makers must find the right time to QR as the actual sales occur in stores. Then they are to decide items to QRbased not only on the qualitative criteria such as opinions from sales persons but also on the quantitative criteria such as sales volume, the recent sales trend, inventory level, the remaining period, the forecast for the remaining period, and competitors' performance. To calculate QR quantity in IQRS-FF, two calculation methods are designed: QR Index based calculation and attribute similarity based calculation using demographic cluster. In the early period of a new season, the attribute similarity based QR amount calculation is better used because there are not enough historical sales data. By analyzing sales trends of the categories or items that have similar attributes, QR quantity can be computed. On the other hand, in case of having enough information to analyze the sales trends or forecasting, the QR Index based calculation method can be used. Having defined the models for decision making for QR, we design KPIs(Key Performance Indicators) to test the reliability of the models in critical decision makings: the difference of sales volumebetween QR items and non-QR items; the accuracy rate of QR the lead-time spent on QR decision-making. To verify the effectiveness and practicality of the proposed models, a case study has been performed for a representative fashion company which recently developed and launched the IQRS-FF. The case study shows that the average sales rateof QR items increased by 15%, the differences in sales rate between QR items and non-QR items increased by 10%, the QR accuracy was 70%, the lead time for QR dramatically decreased from 120 hours to 8 hours.