• Title/Summary/Keyword: Automated Construction.

Search Result 512, Processing Time 0.029 seconds

A Study on the Influential Factors on Decision Making of Frame Construction Scheduling For Automated Construction (건설자동화를 위한 철골 공사 계획의 의사결정 영향요인에 관한 연구)

  • Choi, Jeong-Phil;Kim, Kyung-Hwan;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.209-212
    • /
    • 2009
  • During the last few decades, several companies and research laboratories have developed construction robots in an effort to improve productivity, quality, and reduce construction time and safety concerns. Recently, domestic construction industry is also interested in developing the construction robots. However, the studies on the research and development process is impossible in real field. A existing research's object is the development of the research on the assumption that construction's environment is a fixed form, But real construction's environment is very dynamic and atypical. So it is very difficult that we apply construction automation and robots. In order to solve this problem, this study deduce influential factors on decision making of frame construction scheduling for automated construction.

  • PDF

Application of Automated Measuring System for the Underground Construction in Urban Area (도심지 근접시공의 자동계측응용)

  • 남순성;정상용
    • Explosives and Blasting
    • /
    • v.15 no.2
    • /
    • pp.53-72
    • /
    • 1997
  • It is impossible to precat the behavior of ground soil and structure accurately during underground construction in urban area or excavation in soft ground area because of difference between the assumed design condition and the actual site condition. Therefore, it must be managed by measuring system and correct the difference by real data. Large scale under ground construction in urban area like a seoul subway project has needed for Intelligent Construction technique, a field of the Engineering Contractor. The automated measuring system is developed for the technique. It is described that the procedure and the method of measuring work with application of the automated measuring system.

  • PDF

AUTOMATED HAZARD IDENTIFICATION FRAMEWORK FOR THE PROACTIVE CONSIDERATION OF CONSTRUCTION SAFETY

  • JunHyuk Kwon;Byungil Kim;SangHyun Lee;Hyoungkwan Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.60-65
    • /
    • 2013
  • Introducing the concept of construction safety in the design/engineering phase can improve the efficiency and effectiveness of safety management on construction sites. In this sense, further improvements for safety can be made in the design/engineering phase through the development of (1) an automated hazard identification process that is little dependent on user knowledge, (2) an automated construction schedule generation to accommodate varying hazard information over time, and (3) a visual representation of the results that is easy to understand. In this paper, we formulate an automated hazard identification framework for construction safety by extracting hazard information from related regulations to eliminate human interventions, and by utilizing a visualization technique in order to enhance users' understanding on hazard information. First, the hazard information is automatically extracted from textual safety and health regulations (i.e., Occupational Safety Health Administration (OSHA) Standards) by using natural language processing (NLP) techniques without users' interpretations. Next, scheduling and sequencing of the construction activities are automatically generated with regard to the 3D building model. Then, the extracted hazard information is integrated into the geometry data of construction elements in the industry foundation class (IFC) building model using a conformity-checking algorithm within the open source 3D computer graphics software. Preliminary results demonstrate that this approach is advantageous in that it can be used in the design/engineering phases of construction without the manual interpretation of safety experts, facilitating the designers' and engineers' proactive consideration for improving safety management.

  • PDF

Analysis of the Technology Adoption Impact Factors for Automated Construction Equipment (건설 자동화 장비 도입을 위한 기술도입 영향요인 분석)

  • Lee, Chijoo;Lee, Ghang;Sim, Jaekyang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.56-64
    • /
    • 2013
  • New construction technologies, especially automated equipment, are rarely deployed on a construction site where many accidents and claims occur. This study analyzed and derived impact factors for technology adoption to improve the chance of adopting automated construction equipment to the field. First, impact factors were classified into functional and non-functional factors. Then the functional factors were divided into usability and functionality factors, and the non-functional factors into cost, construction property, and organization factors. Next, the importance and realization possibility of each impact factor were analyzed through a survey with experts. Usability and functionality were analyzed to have the highest importance and realization possibility. Lastly, the differences between construction companies and equipment development companies in the importance and realization possibility of each factor were analyzed. Construction companies recognized previous relationship, operator's attitude, members' will, and construction quality more important than equipment development companies.. The equipment development companies should consider these differences between the view of construction companies and that of equipment development companies on the impact factors. The result of this study can be used as a basis for evaluating for automated construction equipment in the preliminary development phase.

A Fundamental Study on the Automated Formwork System for Bridge Pier Unmanned Construction (교각 무인시공 자동화 거푸집 시스템 구성을 위한 기초 연구)

  • Lee, Jae Heun;Yoon, Hyejin;Kim, Young Jin;Chin, Won Jong;Lee, Sang Yoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.44 no.5
    • /
    • pp.707-717
    • /
    • 2024
  • Recently, the implementation of unmanned and automated technologies has been actively considered as a solution to reduce safety accidents in industrial sites. However, bridge construction sites are recognized as a more challenging area for research and development compared to other industries due to the complexity of the site, such as weather and terrain, and the fact that the work is not repetitive or standardized. In this paper, a formwork system for unmanned and automated construction of bridge piers, which are considered high-risk work environments due to tasks such as rebar assembly, concrete pouring, and formwork dismantling and assembly at high altitudes, was developed. To achieve this, the formwork was equipped with motorized spindles and an automated lifting system to replace the manual dismantling and assembly process. Additionally, manipulators were installed on the upper work platform to replace workers in tasks such as rebar assembly and concrete pouring. To verify the proposed technology, we aimed to demonstrate the feasibility of the automated formwork system for unmanned pier construction through an assembly test.

The Development of Automated Building Equipment Design System Using 3D CAD Building Information (3차원 CAD정보를 활용한 건축설비 자동화시스템 구축에 관한 기초연구)

  • Song, Kyoo-Dong;Song, Seung-Yeong;Jeung, Woo-Shin
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2007.04a
    • /
    • pp.357-360
    • /
    • 2007
  • In the area of domestic construction industry, recently, standardization of construction. globalization of constructional and a building information arc required to advance increase productivity, shorten the term of works and reduce the cost of construction. The objective of this is to offer basic data of process new thesis and development for automated building equipment design system based on 3D CAD building information. This study contribute the development of automated Building equipment design system based on 3D which helps to conduct the equipment design handily and quickly.

  • PDF

Automated Progress Measurement and Management using Face Recognition (안면인식(Face Recognition)을 활용한 진도관리 자동화)

  • Kim, Namjoon;Jung, Youngsoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.160-161
    • /
    • 2013
  • Progress measurement is one of key tasks for cost and schedule management in construction management. However, there has been shortage of effort to implement for automated progress measurement. This paper proposes to use a face recognition (FR) technology for automated progress measurement and management in construction sites. The FR technology can acquire detailed progress data that includes the in and out information of labors by location. The expected effectiveness of the proposed system is to provide accurate labor information for progress measurement by utilizing automated data acquisition technology (DAT) with high-speed reading face. In addition, it could be applied to real-time safety and quality management by using the camera images.

  • PDF

Conceptual Design of Ground Control Point Survey Automation Technology Using Drone (드론을 활용한 지상기준점 측량 자동화 기술의 개념디자인)

  • Jae-Woo Park;Dong-Jun Yeom
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.26 no.4_2
    • /
    • pp.687-696
    • /
    • 2023
  • In recent construction sites, digital maps obtained through drone photogrammetry have garnered increasing attention as indispensable tools for effective construction site management. the strategic placement of Ground Control Points (GCPs) is crucial in drone photogrammetry. Nevertheless, the manual labor and time-intensive nature of GCP surveying pose significant challenges. The purpose of this study is to design the concept of automated GCPs survey technology for enhancing drone photogrammetry efficiency in construction sites. As a result, the productivity of the automated method was analyzed as 118,894.7㎡/hr. It is over 25% productivity improvement compared to traditional methods. In future studies, economic analysis of automated methods should be studied.

Towards Instant Availability and Full Life Cycle Resilience in Vertical Cities: Automated Deployment and Transformation of High-Rise Buildings to Mitigate Social Challenges

  • Thomas Bock;Rongbo Hu
    • International Journal of High-Rise Buildings
    • /
    • v.11 no.2
    • /
    • pp.75-86
    • /
    • 2022
  • High-rise buildings often can accommodate the population of small horizontal cities. The investment in high-rise buildings is considerable and therefore a rapid return on investment is necessary. The immediate availability of high-rise buildings can be achieved by automated prefabrication of highly finished modules and their instant on-site assembly by robotic and automated construction sites. A high-rise building as a vertical city can be considered as a sophisticated organism that can constantly change throughout its lifecycle in response to economic growth, demographic change, and environmental pressures. To date, many new urban high-rise developments claim to be "vertical cities", yet few represent this important characteristic. This article analyzed the technological readiness and innovations in the field of construction automation and robotics including single-task construction robots, automated on-site construction factories, and ambient assisted living. These technological advances enable the realization of future vertical cities that are able to continuously grow and transform in terms of form and function. Finally, the article proposes a visionary archetype of vertical city in the name of "dynamic vertical urbanism" that is easy to expand vertically and horizontally in order to achieve instant availability and full life cycle resilience thanks to advanced building technologies.

Automated Life-Cycle Management System Based on SCM for Super High-rise Buildings Construction (SCM기반 Automated Life-Cycle Management System 구축방안 - 초고층 빌딩 커튼월을 중심으로 -)

  • Yoon Jeong-Hwan;Kim Yea-Sang;Chin Sang-Yoon;Kim Chang-Duk;Choi Yoon-Ki;Chun Jae-Youl;Lim Hyung-Chul
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.430-433
    • /
    • 2003
  • Cost, schedule, quality are the essential parts of success of every construction project. It is especially true in high-rise building construction. Among the construction components in high-rise building construction, curtain walls are very important elements for the project success because they take large portion of cost and schedule. However, curtain wall construction process are very complicated, where many entities including designers, suppliers, contractors and even maintenance contractors are involved. Therefore, control and management of their relationships and production process are critical. It is suggested that this can be solved by the concept of Supply Chain Management which is supported by the automated information technology with Radio Frequency Identification. Such concept is defined as 'Automated Life-Cycle Management System Based On SCM' and this study suggests rode map to establish the system.

  • PDF