Integrating a Machine Learning-based Space Classification Model with an Automated Interior Finishing System in BIM Models

  • Ha, Daemok;Yu, Youngsu;Choi, Jiwon;Kim, Sihyun;Koo, Bonsang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.4
    • /
    • pp.60-73
    • /
    • 2023
  • The need for adopting automation technologies to improve inefficiencies in interior finishing modeling work is increasing during the Building Information Modeling (BIM) design stage. As a result, the use of visual programming languages (VPL) for practical applications is growing. However, undefined or incorrect space designations in BIM models can hinder the development of automated finishing modeling processes, resulting in erroneous corrections and rework. To address this challenge, this study first developed a rule-based automated interior finishing detailing module for floors, walls, and ceilings. In addition, an automated space integrity checking module with 86.69% ACC using the Multi-Layer Perceptron (MLP) model was developed. These modules were integrated into a design automation module for interior finishing, which was then verified for practical utility. The results showed that the automation module reduced the time required for modeling and integrity checking by 97.6% compared to manual work, confirming its utility in assisting BIM model development for interior finishing works.

A Basic Study on Review the Classification System and the Process of BIM Information for an Automatic Review of Building Code (건축법규 자동검토를 위한 BIM정보의 분류체계 검토 및 프로세스에 관한 기초연구)

  • Lee, Chang-Yoon;Shim, Un-Jun;Ahn, Yong-Sun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.5
    • /
    • pp.45-52
    • /
    • 2012
  • Recently, BIM is used at several areas actively because of introduction of BIM in the construction industry. In particular, the recent many studies on activation of BIM information sharing is underway and it is the future direction of BIM. Moreover, it should be clearly realized. In the BIM levels of domestic construction phase, Interference Review, calculating volume estimates in part based on the active research is underway. However, still interested in reviewing building codes have relatively little interest. As BIM enabled, The methods of reviewing building codes should be transformed into a automated system by using information of BIM. In overseas, they are already using diverse softwares for reviewing modeling. Thus, For an automatic review of building regulations research is needed. this study is research on the development Domestic building codes as an automatic review process by using BIM. In order to Automatic review of the current building regulations by using BIM, this study analyzes the characteristics of each piece of information.

Ontology based Integrated Construction Information Management for Modernized Traditional Housing (Hanok)

  • Lee, Heewoo;Lee, Yunsub;Jin, Zhenhui;Gebremichael, Dagem Derese;Jung, Youngsoo
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.162-169
    • /
    • 2022
  • In an attempt to disseminate modernized Korean traditional housing (Hanok), a ten-year research project was initiated in 2010 by the Korean Government to reduce the construction cost, improve the facility performance, and automate the Hanok construction industry. To meet these objectives, various research areas, including public policies, planning methods, design standards, new building materials, construction standards, maintenance procedures, advanced project management tools, and integrated IT applications have been developed. In addition, comprehensive technologies developed were applied to the ten pilot Hanok buildings to validate the real-world performance as part of the research project. To further facilitate the digital transformation of the Hanok industry by using the research results, it is required to disseminate the developed technologies in an automated and standardized manner. In particular, it is crucial to systematize and manage the interoperability of various technical data and accumulated historical data for different business functions, especially within the highly fragmented industry. In this context, this paper proposes an ontology-based Hanok information dissemination platform to enable industry-wide automated knowledge and information sharing. The system architecture, standardized historical database, and advanced analytics based on ontology web language (OWL) for the Hanok industrialization platform are introduced.

  • PDF

Sensor-based Motion Planning Algorithm for High-rise Building Facade Cleaning of Built-in Guide Type Multi-Robot (Built-in guide 타입 다중 로봇의 고층 빌딩 외벽 청소를 위한 센서 기반 운동 계획 알고리즘)

  • Lee, Seung-Hoon;Kim, Dong-Hyung;Kang, Min-Sung;Gil, Myung-Soo;Kim, Young-Soo;Back, Sung-Hoon;Han, Chang-Soo
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.18 no.5
    • /
    • pp.445-452
    • /
    • 2012
  • With the increasing number of high-rise and large-scale buildings, modern buildings are becoming intelligent, and are incurring high construction costs and requiring careful maintenance. Maintenance works for high-rise buildings significantly depend on human labor, unlike other construction processes that are gradually being automated. The resulting accidents may produce very high social and economic losses. To address this problem, herein, this paper proposes robotic building maintenance system using multi-robot concept, in specific, cleaning a building facade which is directly subjected to minimize human labor; that improves the process efficiency and economic feasibility. The sensor for detecting contamination of building's outer-wall glass is proposed; Kalman filter was used for estimating robots' status with the contamination of the window glass. Task allocation of the sensor based multi-robots for an effective way of task execution is introduced and the feasibility was verified through the simulations.

Development of Construction Method based Automated Estimation System Considering Characteristics of the Domestic Construction Industry (국내 건설 산업에서의 물량산출 특성을 고려한 공법기반 견적자동화 시스템 개발)

  • Jung, Jun-Ho;Lee, Chang-Hee;Kim, Seong-Ah;Chin, Sang-Yoon;Choi, Cheol-Ho
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2010.04a
    • /
    • pp.93-96
    • /
    • 2010
  • 현재 국내외에서 Building Information Modeling을 적용한 여러 분야의 연구가 활발하게 진행되고 있으며, 일부 국외에서는 3D 기반의 견적을 실제 프로젝트에 반영하고 있다. 반면, 국내 건설 프로젝트에서는 여전히 2D 설계도면과 물량산출 프로그램을 이용하여 견적이 이루어지고 있다. 작업의 신속성 및 정확성을 중요시하는 국내 견적 문화에서는 3D 기반의 물량산출 방식 도입을 부정적으로 바라보는 시각이 있으나, 향후 건설 산업의 경쟁력 확보를 위해서 3D 기반 견적작업이 필요하다. 이에 국외에서 상용화된 견적 시스템을 국내 건설 프로젝트에 적용한 결과, 몇 가지 한계점이 있는 것으로 드러나 국내 견적 방식에 적합한 3D기반의 물량산출 프로그램 개발이 절실한 상황이다. 따라서 본 연구에서는 국내 건설 산업에서의 물량 산출 특성을 반영한 공법기반 견적자동화 시스템 개발 및 검증을 통해 국내 3D 기반의 견적 도입을 앞당기고자 한다.

  • PDF

A Study on Stability Improvement through Automated Displacement Measurement of Structures Based on Artificial Intelligence (인공지능 기반 구조물 자동화 변위계측을 통한 안정성 향상에 관한 연구)

  • Kim, Dae-Geon;Woo, Jong-Yeol;Park, Hyun-Jung;Lee, Dong-Oun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.43-44
    • /
    • 2022
  • Recently, there is a demand for a fast and efficient method for measuring displacement during construction or maintenance of new buildings. As the number of safety accidents caused by structural collapse increases, the integrated management plan of the measurement and management system has become a platform and data is shared with stakeholders, so that it is possible to establish safety management in advance according to the displacement of the structure.

  • PDF

AN AUTOMATED FORMWORK MODELING SYSTEM DEVELOPMENT FOR QUANTITY TAKE-OFF BASED ON BIM

  • Seong-Ah Kim;Sangyoon Chin;Su-Won Yoon;Tae-Hong Shin;Yea-Sang Kim;Cheolho Choi
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1113-1116
    • /
    • 2009
  • The attempt to use a 3D model each field such as design, structure, construction, facilities, and estimation in the construction project has recently increased more and more while BIM (Building Information Modeling) that manages the process of generating and managing building data has risen during life cycle of a construction project. While the 2D Drawing based work of each field is achieved in the already existing construction project, the BIM based construction project aims at accomplishing 3D model based work of each field efficiently. Accordingly, the solution that fits 3D model based work of each field and supports plans in order to efficiently accomplish the relevant work is demanded. The estimation, one of the fields of the construction project, has applied BIM to calculate quantity and cost of the building materials used to construction works after taking off building quantity information from the 3D model by a item for a Quantity Take-off grouping the materials relevant to a 3D object. A 3D based estimation program has been commonly used in abroad advanced countries using BIM. The program can only calculate quantity related to one 3D object. In other words, it doesn't support the take-off process considering quantity of a contiguous object. In case of temporary materials used in the frame construction, there are instances where quantity is different by the contiguous object. For example, the formwork of the temporary materials quantity is changed by dimensions of the contiguous object because formwork of temporary materials goes through the quantity take-off process that deduces quantity of the connected object when different objects are connected. A worker can compulsorily adjust quantity so as to recognize the different object connected to the contiguous object and deduces quantity, but it mainly causes the confusion of work because it must complexly consider quantity of other materials related to the object besides. Therefore, this study is to propose the solution that automates the formwork 3D modeling to efficiently accomplish the quantity take-off of formwork by preventing the confusion of the work which is caused by the quantity deduction process between the contiguous object and the connected object.

  • PDF

Development of Omnidirectional Object Detecting Technology for a Safer Excavator (굴삭기 작업영역의 전방위 장애물 탐지기술 개발)

  • Soh, Ji-Yune;Lee, Jun-Bok;Han, Choong-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.4
    • /
    • pp.105-112
    • /
    • 2010
  • The demand for the development of automated construction equipments is gradually increasing to deal with the current problems of construction technology, such as a lack of experienced workers, the aging of engineers, safety issues, etc. In particular, earth work such as excavation is very machine-dependent, and there has been a great deal of research on the development of an intelligent excavator, which involves great safety concerns. Thus, the objective of this study is to develop the technology to enhance the safety of intelligent excavation systems by developing an omnidirectional object detection technology for the intelligent excavator and applying it to a user-friendly system. The existing literature was reviewed, and the function of various sensor technologies was investigated and analyzed. Then, the best laser sensor was selected for an experiment to determine its effectiveness. An omnidirectional object detection algorithm was developed for a user interface program, and this can be used as the fundamental technology for the development of a safety management system for an intelligent excavator.

Development of Rule-based Checking Modules for the Evacuation Regulations of Super-tall Buildings in Open BIM Environments (개방형BIM환경에서의 룰기반 초고층건축물 피난법규 검토모듈 개발)

  • Kim, Inhan;Choi, Jungsik;Cho, Geunha
    • Korean Journal of Computational Design and Engineering
    • /
    • v.18 no.2
    • /
    • pp.83-92
    • /
    • 2013
  • IFC based open BIM has internationally developed as a solution for interoperability problem among different software applications. Despite much interest and effort, the open BIM technologies are rarely introduced to the construction industry and need more technical development for a practical application as well. This research aims to develop automated code checking modules for quality assurance process of BIM data. The research have analyzed domestic regulations focusing on super-tall buildings and developed open BIM-based code checking modules for the evacuation regulations. The modules are able to validate evacuation regulations such as installation of emergency elevator and fire safety zone. The authors expect to improve the process of BIM quality assurance and enhance the quality of BIM data by this research on automated checking system.

Analysis of Cost Estimate Method Based on Engineering 3D Model for Nuclear Power Plant Construction Project (엔지니어링 3D모델 기반 원전 건설사업비 산정방안 분석)

  • Lee, Sang-Hyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.294-295
    • /
    • 2018
  • Nowadays, the construction industry utilizes 3D models in the designing process, on which research is being conducted to establish an automated system for project cost estimation in connection with information related to construction such as material unit costs and wages, beyond the level of design interference review and construction quantity estimation. In this process, the project cost is estimated in connection with unit price data after takeoff the quantity based on the 3D model attributes and data types. A way to reduce cost and risk would be first developing prototypes of some of essential buildings and works, comparing and validating the outcomes, and then extending to the whole scope, because estimates differ on the basis of the scope and level of 3D design models as well as the data accuracy. This study analyzes case studies of project cost estimation by computing the quantity on the basis of 3D model in the construction industry and explores methodologies and management measures applicable for estimating nuclear power plant construction project costs.

  • PDF