• Title/Summary/Keyword: Assembly model

Search Result 1,099, Processing Time 0.034 seconds

The Microbiological Quality Assessment of Chicken Soup Utilizing HACCP Model in a University Foodservice Establishment (대학 급식 시설의 닭곰탕 생산과정에서 HACCP Model 을 사용한 미생물적 품질 평가에 관한 연구)

  • Kwak, Tong-Kyung;Rew, Kyung
    • Korean journal of food and cookery science
    • /
    • v.2 no.2
    • /
    • pp.76-83
    • /
    • 1986
  • Time and temperature, pH and Aw, and microbiological evaluation were made to identify critical control points during various phases in product flow of chicken soup preparation in a university foodservice establishment. The results are summarised as follows: 1) Time and temperature data indicated that the phases of cooling after cooking, post-preparation, and holding ingredients at room temperature before assembly were critical. 2) pH and Aw values were in favorable for microbial growth. 3) Microbiological data indicated that the phases of basic ingredients. post-preparation and holding ingredients before assembly were critical. 4) Critical control points identified were; basic ingredients, cooling after cooking, post-preparation, holding before assembly and service, and assembly and service. 5) Several guidelines were suggested for the effective qualitly control program.

  • PDF

Athermalization of an Optical System Based on Lens Shape and Assembly Method

  • Xu, Sihua;Peng, Xiaoqiang;Tie, Guipeng;Guan, Chaoliang;Hu, Hao;Xiong, Yupeng
    • Current Optics and Photonics
    • /
    • v.3 no.5
    • /
    • pp.429-437
    • /
    • 2019
  • Temperature adaptability is an important metric for evaluating the performance of an optical system. The temperature characteristics of the optical system are closely related to the material and shape of its lens. In this paper, we establish a mathematical model relating the temperature characteristics to the shape and material of the lens. Then a novel assembly structure that can solve the lens constraint and positioning problem is proposed. From those basics, the correctness of the theoretical model and the effectiveness of the assembly structure are verified through simulated analysis of the imaging quality of the optical system, whose operating temperature range is $-60{\sim}100^{\circ}C$.

A STUDY ON THE ACCELERATED LIFE TESTS OF IMAGE INTENSIFIER ASSEMBLY(KIT-7) (야간투시경용 영상증폭관(KIT-7)의 가속수명시험에 관한 연구)

  • Kim, Sung-Min;Park, Jung-Won;Ham, Jung-Keol;Kim, Kwang-Youn
    • Journal of Applied Reliability
    • /
    • v.7 no.3
    • /
    • pp.127-136
    • /
    • 2007
  • The accelerated life tests(ALTs) and degradation characteristics of image intensifier assembly(KIT-7) under low illuminance and high temperature were investigated. The accelerated life tests were carried out at $5{\times}10^5\;fc-40^{\circ}C,\;10{\times}10^5\;fc-40^{\circ}C,\;5{\times}10^5\;fc-50^{\circ}C,\;10{\times}10^5\;fc-50^{\circ}C$ and relationship related to illuminance and temperature was used as an accelerated life test model. An ALTA program[6] was used to calculate an acceleration factor and the test of life distribution fit, and estimate three parameters of an life test model. To sum up, MTTF 10,000 h at $5{\times}10^{-5}\;fc-40^{\circ}C$ of image intensifier assembly was certificated.

  • PDF

Optimum distribution of steel frame assembly for seismic retrofit of framed structures

  • Michael Adane;Seungho Chun;Jinkoo Kim
    • Steel and Composite Structures
    • /
    • v.50 no.3
    • /
    • pp.337-345
    • /
    • 2024
  • This research proposed a particle swarm optimization (PSO) based seismic retrofit design of moment frame structures using a steel frame assembly. Two full scale specimens of the steel frame assembly with different corner details were attached to one-story RC frames for seismic retrofit, and the lateral load resisting capacities of the retrofitted frames subjected to cyclic loads were compared with those of a bare RC frame. The open source software framework Opensees was used to develop an analytical model for validating the experimental results. The developed analytical model and the optimization scheme were applied to a case study structure for economic seismic retrofit design, and its seismic performance was assessed before and after the retrofit. The results show that the developed steel frame assembly was effective in increasing seismic load resisting capability of the structure, and the PSO algorithm could be applied as convenient optimization tool for seismic retrofit design of structures.

Development of Fuse Box Assembly Machine for Automobile (승용자동차용 휴즈 박스 조립기 개발에 관한 연구)

  • 박정수
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.7 no.3
    • /
    • pp.38-42
    • /
    • 2002
  • This paper provides that improve productivity of fuse box assembly processing. It is the most difficult processing that automated receptacle assembly job for fuse box assembly. Most of these assembly processing has been made of fuse insert procedure to circuit board by hand-operated. Therefore this study develops the automative fuse box assembly machine for feeding each fuse model automatically.

  • PDF

PARALLEL IMPROVEMENT IN STRUCTURED CHIMERA GRID ASSEMBLY FOR PC CLUSTER (PC 클러스터를 위한 정렬 중첩 격자의 병렬처리)

  • Kim, Eu-Gene;Kwon, Jang-Hyuk
    • 한국전산유체공학회:학술대회논문집
    • /
    • 2005.10a
    • /
    • pp.157-162
    • /
    • 2005
  • Parallel implementation and performance assessment of the grid assembly in a structured chimera grid approach is studied. The grid assembly process, involving hole cutting and searching donor, is parallelized on the PC cluster. A message passing programming model based on the MPI library is implemented using the single program multiple data(SPMD) paradigm. The coarse-grained communication is optimized with the minimized memory allocation because that the parallel grid assembly can access the decomposed geometry data in other processors by only message passing in the distributed memory system such as a PC cluster. The grid assembly workload is based on the static load balancing tied to flow solver. A goal of this work is a development of parallelized grid assembly that is suited for handling multiple moving body problems with large grid size.

  • PDF

CAD Interface for Block Assembly Planning using Open CASCADE (Open CASCADE를 이용한 블록조립 계획용 CAD 인터페이스)

  • 최상수;신동목
    • Journal of Ocean Engineering and Technology
    • /
    • v.18 no.3
    • /
    • pp.26-31
    • /
    • 2004
  • This paper presents a process planning system that will generate and verify assembly sequences of block assemblies. It consists of a CAD interface system and an assembly sequence planning system. In developing this system, we used an open architecture CAD kernel for the CAD interface system, for visualizing the CAD model and the assembly sequences, and an expert system shell for the assembly sequence planning system. This paper also proposes a framework for the integration of all the steps required to automate the procedures, from design to production. The process planning system is demonstrated by a simple example.

PCB Assembly Optimization of Chip Mounters for Multiple Feeder Assignment (다중피더배치를 고려한 칩마운터의 조립순서 최적화)

  • Kim Kyung-Min;Park Tae-Hyoung
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.11 no.2
    • /
    • pp.144-151
    • /
    • 2005
  • We propose an optimization method to reduce the assembly time of chip mounters. Feeder arrangement and assembly sequence are determined considering the multiple feeder assignment. The problem is divided into two sub-problems: feeder arrangement problem and assembly sequence problem. We present mathematical model for each sub-problem. The clustering algorithm and assignment algorithm are applied to solve the feeder arrangement problem. The assignment algorithm and connection algorithm are applied to solve the assembly sequence problem. Simulation results are then presented to verity the usefulness of the proposed method.

Scheduling for Mixed-Model Assembly Lines in JIT Production Systems (JIT 생산 시스템에서의 혼합모델 조립라인을 위한 일정계획)

  • Ro, In-Kyu;Kim, Joon-Seok
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.17 no.1
    • /
    • pp.83-94
    • /
    • 1991
  • This study is concerned with the scheduling problem for mixed-model assembly lines in Just-In-Time(JIT) production systems. The most important goal of the scheduling for the mixed-model assembly line in JIT production systems is to keep a constant rate of usage for every part used by the systems. In this study, we develop two heuristic algorithms able to keep a constant rate of usage for every part used by the systems in the single-level and the multi-level. In the single-level, the new algorithm generates sequence schedule by backward tracking and prevents the destruction of sequence schedule which is the weakest point of Miltenburg's algorithms. The new algorithm gives better results in total variations than the Miltenburg's algorithms. In the multi-level, the new algorithm extends the concept of the single-level algorithm and shows more efficient results in total variations than Miltenburg and Sinnamon's algorithms.

  • PDF